View allAll Photos Tagged phasor

I posted the phaser a few days ago, but here's the @svisound Techno_FU Fuzz: bit.ly/22ML5Is #svisound #svisound #techno #fu #effectsdatabase #fxdb #guitarpedals #guitareffects #effectspedals #pedals #guitarfx #fxpedals #pedalporn #guitarporn #gearporn #pedalboard #guitar #guitarist #guitargear #geartalk, via Instagram: bit.ly/1VKue8p

Black, beige and brown dress, no sleeves

Size 16

Price £35.00

An organized Photo Shoot by Melane Osorio.

 

Models: Chen

MUA: Melane Osorio

 

All Rights Reserved.

 

Copyright 2017

Lens Flare from the moon.

Phaser, Tricorder and communicator, with working lights and sounds.

Central Market Austin Texas , January 30, 2017

Straight out of the back +1 exposure nothing else, this back is remarkable! the pictures that come out of this back are a dream!

️ SPQR - Phase I ️

 

▶️ Watch the Model Film in 4K on YouTube:

youtu.be/zEbGFWenbKI

 

▶️ Intro to SPQR Project:

youtu.be/AUoltNrMyR4

 

Support this unprecedented project on Patreon:

www.patreon.com/RoccoButtliere

 

Parts: 104,000+ (~1,700 unique)

 

Scale: 1:650

 

Dimensions: 57in x 289in (143cm x 231cm)

 

Research Time: 2,000+ hours since 2019

 

Design Time: 1,000+ hours in 200 days

 

Build Time: 600+ hours in 90 days

 

Photography: EClarke Photo 📷

 

© MMXXIII - Rocco Buttliere, LLC

based on the 4ms phaseur fleur

As New York City shifts to Phase 1 reopening amid the COVID-19 pandemic, New York City Transit resumes full service on Mon., June 8, 2020.

 

Interim New York City Transit President Sarah Feinberg greets a Conductor at the 74 St-Broadway Station on the 7 line.

 

(Marc A. Hermann / MTA New York City Transit)

I did this one for FireInCairo (he used to go by another name but i can't remember).

Phase One P45

120mm

rust-dyed cotton calico stitched, resisted, over dyed with indigo, discharge screen printed

212th Phase II Clone Trooper from 75036: Utapau Trooper Lego Star Wars Set (2014)

 

Minifgure Review At: musingsfromdagobah.blogspot.co.uk/2014/03/tie-fighter-pil...

Follow My Lego Star Wars Journey at: musingsfromdagobah.blogspot.co.uk/

Follow On Twitter _MasterYoda_ twitter.com/__MasterYoda__

Created in Frax. Thanks for comments and fave adds. Always appreciated.

Black n White. 06. Rvsd.

As New York City shifts to Phase 1 reopening amid the COVID-19 pandemic, New York City Transit resumes full service on Mon., June 8, 2020.

 

Cleaner-Transit Authority (CTA) at the Jackson Heights-Roosevelt Av Station.

 

(Marc A. Hermann / MTA New York City Transit)

Leica M9 + DR Summicron 50mm f/2

Clicked today morning during a friendly match at my workplace

Capture in Varanasi - India

 

| Facebook | Twitter | My Space | 500px | website | Director's Cut | Tumblr | gettyimages |

  

Please don't use this picture on websites, blogs or other media without my permission.

 

█║▌│█│║│█║mimmopellicola 2O|2

As New York City entered Phase 1 reopening on Monday, June 8 riders made a safe return back to the subways, a cleaner scrubs signs and columns at Atlantic Av Station in Brooklyn. Photo: MTA New York City Transit / Patrick Cashin

this is AWN doing his thing with some quickly mocked up lightpainting equipment

 

AWN and i decided to do a photo session one stormy evening. it was mid week and the wind was high. we decided on an old abandoned naval base on the east side of portsmouth. some kids had made a hole in the fence so we used that as our entry point. walking along the sea defences we managed to get drenched with water and almost swept out to sea on a couple of occasions. once we were inside the base we were safe from the water but the addicts were waiting. we explored one from top to bottom, at about 12 midnight we had done the building and were so wet a could we decided to go home. however are egress was blocked by the risen tide and deadly waves. we were trapped and it was raining. for the next two hours we explored the rest of the base (no photos sorry) and the addicts stayed out of the rain leaving us to wander the wet and cracked concrete

The Phase One P25 is no back to be scoffed at. It's mind blowing that this is 22mpx from 2004 that had a $29K USD price tag. It has it's limitations, but honestly, so does film.

Old magazine advertisement.

Construction continues on the new vehicle maintenance facilities in Grafenwoehr, Germany. The facility is a part of the multi-phased $700 million Efficient Basing Grafenwoehr project. The project includes a new school, dinning facility, physical fitness center and housing - many of which are already complete. The U.S. Army Corps of Engineers Europe District is managing construction of the maintenance facility, along with many of the already completed facilities. The entire EB-G project is expect to wrap up construction in March 2010. (U.S. Army Corps of Engineers photo by Carol E. Davis)

Amoeba under phase contrast

Phase One P45

120mm

Queen Rania Al Abdullah touring a classroom within the Madrasati phase four schools.

Mafraq, Jordan/ May 11, 2011

 

الملكة رانيا العبدالله خلال جولتها في أحد صفوف المدارس المشمولة بالمرحلة الرابعة لمبادرة مدرستي.

المفرق، الأردن/ 11 أيار 2011

 

© Royal Hashemite Court

 

Queen Rania Al Abdullah touring a classroom within the Madrasati phase four schools.

Mafraq, Jordan/ May 11, 2011

 

الملكة رانيا العبدالله خلال جولتها في أحد صفوف المدارس المشمولة بالمرحلة الرابعة لمبادرة مدرستي.

المفرق، الأردن/ 11 أيار 2011

 

© Royal Hashemite Court

 

Pictured: Recruits being tested on Battlefield Casualty Drills find an 'injured soldier' in a mock-up car accident. They must extract the soldier back to their base.

 

A series of images taken to replace the imagery at ATR Pirbright. The images depict day to day life and training of Phase 1 recruits.

 

**MOD CONSENT FORM HELD BY THE PHOTOGRAPHER**

 

NOTE TO DESKS:

MoD release authorised handout images.

All images remain Crown Copyright 2014.

Photo credit to read - Cpl Si Longworth RLC (Phot)

 

Email: simonlongworth@mediaops.army.mod.uk

richardwatt@mediaops.army.mod.uk

shanewilkinson@mediaops.army.mod.uk

 

Si Longworth - 07414 191994

Richard Watt - 07836 515306

Shane Wilkinson - 07901 590723

Pictured: Recruits make best use of 'admin' time to prepare hot brews and reapply 'cam' cream.

 

A series of images taken to replace the imagery at ATR Pirbright. The images depict day to day life and training of Phase 1 recruits.

The ENORMOUS size of each of our added billions: The fact that our graph above is a virtual icon of "LATE-PHASE" exponential conditions is serious enough.

 

In addition, however, the data that it depicts is even more disquieting if we also address the truly serious ENORMITY of each of our added billions.

 

Since most human demographic data involves millions and billions, we can consider two quick riddles:

 

(1) The riddle of a million homework questions: Suppose that school districts in a particular state decide to pass more stringent graduation standards and decide to require all of their students to complete one million homework questions in order to graduate.

 

Imagine then that one student decides to work toward this new requirement by completing 100 homework questions per night, five nights per week, 52 weeks a year. How long will it take the student to finish their assignment? (The answer is 38.5 years)

 

(2) Suppose that one of the districts, however, decides to enact an even more stringent standard and requires all of its students to complete one billion homework questions in order to graduate.

 

Assume that one of this district's young scholars decides to work toward this higher requirement at the same rates (500 questions per week; 52 weeks per year). How long will he or she need to complete their homework? (The answer is 38,461 years)

  

(If a cave-student had begun working on such an assignment 20,000 years ago when ice was one-mile thick over Wisconsin, Ohio, and Michigan, when wooly mammoths and saber-toothed tigers still roamed the earth, and when people still lived in caves, and he or she conscientiously completed 100 questions per night, five nights per week, fifty-two weeks a year from then until now - he or she would only have 18,461 years to go before completing their assignments.)

 

Now take each and every one of those homework questions from all 38,461 years and convert each and every question into a human being, and add them all to the surface of our planet every 10-12 years - that is how many additional people we are adding to our planet every 10-12 years.

 

Now provide each of these added billions with bulldozers, electric hair-dryers, chain saws, hydroelectric dams, AK-47s, sport utility vehicles, bacon double-cheeseburgers, and investment portfolios - and we can begin to see why we have poverty, hunger, starvation, greenhouse gases, dead zones in the sea, deforestation, lawless militias, and failed states - and why earth's environmental, ecological, and biospheric machinery is breaking.

 

For the THIRD key graph in this series, visit "A Real-world Population Calamity" (next) (also known as CLIMB-AND-COLLAPSE)

  

Her Majesty Queen Rania Al Abdullah with H.E Dr. Tayseer Al Noaimi, Minister of Education, checking on a workshop organized by Madrasati for teachers of the Madrasati phase four schools.

Mafraq, Jordan/ May 11, 2011

 

جلالة الملكة رانيا العبدالله مع وزير التربية والتعليم الدكتور تيسير النعيمي في إحدى ورش التدريب التي تنظمها مبادرة مدرستي لمعلمي المدارس المشمولة في المرحلة الرابعة.

المفرق، الأردن/ 11 أيار 2011

 

© Royal Hashemite Court

 

Amtrak 164 the Phase IV heritage unit leads Hiawatha train #337 at Lake Forest, IL.

As New York City shifts to Phase 1 reopening amid the COVID-19 pandemic, New York City Transit resumes full service on Mon., June 8, 2020.

 

Masks and hand sanitizer at the Jackson Heights-Roosevelt Av Station.

 

(Marc A. Hermann / MTA New York City Transit)

As New York City shifts to Phase 1 reopening amid the COVID-19 pandemic, New York City Transit resumes full service on Mon., June 8, 2020.

 

Chief Stations Officer David Santoro hands out masks at the Jackson Heights-Roosevelt Av Station. Group Station Manager Stephen Carson.

 

(Marc A. Hermann / MTA New York City Transit)

isco 105mm f1.4

Amtrak 130 the Phase II heritage unit leads Amtrak train #8 the eastbound Empire Builder at Lake Forest, IL.

Tampa, Florida

 

Moments before sunset, the birds at the beach all calmed down from frivolous flying around and started to rest by the water. This pair of gulls (or terns?) spent an entire 10 minutes completely motionless, which was strangely fun to watch against the ebb and flow in the back.

soft distressed brown upcycled leather journal with various size holes down the front.

 

thin beige leather cord has been attached through a brass eyelet for the closure, with a brass Indian bead on the end.

 

sewn in a wrapped longstitch with natural Irish waxed linen thread

 

pages are curious soft touch whipped cream by Arjowiggins (France) FSC certified & environment friendly, acid free 120gsm, this paper has a lovely soft vellum/felt feel on one side, this is a one of a kind in paper, mixed with recycled kraft paper 80gsm.

the edges have been treated to look aged

 

160 pages (320 both sides) 15cm X 10.5cm

journal - 15.5cm X 11cm

 

Copyright Design ©MOONWATER BOOKS 2012

SOLD

 

1 2 ••• 16 17 19 21 22 ••• 79 80