View allAll Photos Tagged officespace

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

Located in a prominent position on the Park Road, and opposite the Metrolink station, Nelson House offers easy access across Altrincham, Salford Quays and central Manchester.

 

Magnus are pleased to announce that there is just one office of 1152 sq ft (10 – 15 person office) currently left at Nelson House

Turnkey Creative Office Space in Santa Monica, CA!

We rent by day, week, month or year!

 

Each Suite: 1-4 Prv Offices,Conference Room,Bullpens,A/C,Wi-Fi

West Valley Building #1, Photo 2

 

Freeport West commercial shipping locations through Salt Lake City are all located conveniently near major highways.

 

Location:

2475 S 3200 W

West Valley City, Utah

 

Address:

2475 S 3200 W

 

Classification:

Warehousing / Shipping

 

Divisible Size (sq.ft.):

44,507

 

Max. Contiguous Space Available (sq.ft.):

367,874

 

Min. Divisible Space (sq.ft.):

44,507

 

Office Area (sq.ft.):

10,658

 

Click for more information about West Valley Building #1's distribution warehouse space in Utah.

Office space for rent. don't you just want to work here?

These are photos of the C3 Co-Working space at the Cambridge Innovation Center in Cambridge, MA.

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

These are photos of the C3 Co-Working space at the Cambridge Innovation Center in Cambridge, MA.

Specially designed booth with wide table are perfect for team work.

Noticing lots of office space available to let.

It's was Binh's birthday today. Surprise, Binh! =)

 

Video here

Crazy neighbor kid #1 destroying the printer

After a couple of months, the vacation is over

For my birthday my sister and brother-in-law got me a RED SWINGLINE STAPLER!!!!! Yes I am a fan of Office Space. I figured I would get a couple of good shots of it on my desk, and since I had not much going on today, I did just that.

 

Just to prove it, I had to get a shot just of the name plate.

Photo by Matt Koroulis,

Camera: Pentax Zoom 90WR,

Film: Kodak Tmax 400 Black & White 35mm,

Developed and scanned at Panda Lab in Seattle.

These are photos of the C3 Co-Working space at the Cambridge Innovation Center in Cambridge, MA.

The EXIT 08 exhibition in GL STRAND presents works by this year’s graduation students from the Royal Danish Academy of Fine Art and draws a vivid picture of the contemporary Danish art scene.

 

1 2 ••• 42 43 45 47 48 ••• 79 80