The New Village project is reaching another important milestone at the Building 1 structure, whereby roofing, windows and trim details are under way and expected to be completed by mid July. Building 5 is moving through a second level of wood frames panels and trusses atop the podium concrete deck. Building 2 is nearing the same progress as Building 5 where a second level of panels and trusses is moving West toward Building 3. At Buildings 2 & 3, a tremendous milestone marks the completion of the structural concrete deck that not only ties the buildings together, but also provides for the superstructure that supports utilities and the future crossover at Havens and Jennings. Building 3 also presents the completion of much of its West masonry wall where a “green screen” will provide the buildings siding and beauty. Building 4 has emerged from the soil with the footings, piers and frost walls. Columns at Building 3 and 4 are erected to support the final elevated decks for the project. Site Sewer is in place with much of the building storm connections in place. Subsurface vaults are set to make way for the eventual removal of overhead power lines and installation of underground power to the surrounding buildings.

The New Village at Patchogue project has emerged into the spring with accomplished milestones that include the completion of the Building 5 elevated structural post-tension slab and the breaking of ground for foundation at Building 4. These two structures will begin the vertical rise along Main Street and will place all of the five buildings in active progress. Building 1 is the Northeast building at the corner of Lake and No. Ocean and is topping out it framed units at the third floor. Building 2 has erected its initial section of the first floor and masonry structures have been completed as some of the stair and elevator shafts. Concrete systems are progressing toward completion of the main structural post-tension slab at the Building 2 & 3 connection and wood systems will follow along that same path. Mechanical, Electrical and Plumbing systems are roughing at framed units.

 

External site work will move toward the installation of sub grade structures and utility distribution conduits to make way for the services that support the project.

 

The New Village at Patchogue project has emerged into the spring with accomplished milestones that include the completion of the Building 5 elevated structural post-tension slab and the breaking of ground for foundation at Building 4. These two structures will begin the vertical rise along Main Street and will place all of the five buildings in active progress. Building 1 is the Northeast building at the corner of Lake and No. Ocean and is topping out it framed units at the third floor. Building 2 has erected its initial section of the first floor and masonry structures have been completed as some of the stair and elevator shafts. Concrete systems are progressing toward completion of the main structural post-tension slab at the Building 2 & 3 connection and wood systems will follow along that same path. Mechanical, Electrical and Plumbing systems are roughing at framed units.

 

External site work will move toward the installation of sub grade structures and utility distribution conduits to make way for the services that support the project.

 

Bright, open, move-in condition loft space available in well-managed, boutique loft building located on Broadway just steps from Houston Street in Manhattan's bustling SoHo neighborhood. Space features exposed ceilings, hardwood floors, western light/views, exposed brick walls and is configured with a pantry and open bullpen. Space measures 3,984 sf and asking rent is $55.00/sf, $18,260/month.

Earth Executive Office is strategically located at Yamuna Expressway, the most futuristic business corridor of national capital region. Here business will enjoy strategic location in terms of connectivity with unmatched accessibility, convenience and proximity to important destinations.

    

Some of the important developments in Greater Noida will appreciate the Tech One valuation in the future are: Night Safari Gautam Buddha University F1- TrackICC Cricket stadium Within 650 acres Tech Zone Next to NIIT (Operational Campus)OTHERS DETAILSPrice : 12.5 lacs*Address : Yamuna ExpresswayGreater NoidaCompletion Year : 2015

    

For more details & BOOKING:

JUST ABOUT PROPERTIESCALL: +91 9999980895, 8860296626Visit Us : www.justaboutproperties.com

  

My boys have quite a few Anime' posters in their Teen Suite and have begged me since we bought our house to paint the walls to coordinate with their posters.

 

So I have procrastinated for 2.5 yrs and I am tired of looking at the builders white walls but have no clue which color to settle with. Whatever I select has to blend in with my office since they are in close proximity.. hmmm I just dunno

The New Village at Patchogue project has emerged into the spring with accomplished milestones that include the completion of the Building 5 elevated structural post-tension slab and the breaking of ground for foundation at Building 4. These two structures will begin the vertical rise along Main Street and will place all of the five buildings in active progress. Building 1 is the Northeast building at the corner of Lake and No. Ocean and is topping out it framed units at the third floor. Building 2 has erected its initial section of the first floor and masonry structures have been completed as some of the stair and elevator shafts. Concrete systems are progressing toward completion of the main structural post-tension slab at the Building 2 & 3 connection and wood systems will follow along that same path. Mechanical, Electrical and Plumbing systems are roughing at framed units.

 

External site work will move toward the installation of sub grade structures and utility distribution conduits to make way for the services that support the project.

 

Some newly constructed office building in NW DC. I think this is on or near 5th St and Massachusetts NW or 5th St and I St NW. I just thought that the sign was cool.

Photos of the larger office (available for rent as of December 1st, 2010) at The Network Hub, 422 Richards Street, Third Floor, downtown Vancouver.

meeting room space at Abbey Business Centres in London EC3

@ Panic (rooftop level)

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

Suite C-West has the following:

3 Private Offices

Conference Room

3 x Bullpen (A/B/C) with Seating/Phones for 4

Private Bathroom

Kitchenette

Private entrance

Air Conditioning

T3 (Wi-Fi and Cat 5 jacks)

Nortel phone system (Monthly access fee plus usage

Access to high volume/speed color printer (As used)

Fax Machine

Monitored Alarm System with Private Code

 

Office Space as low as $32/day!

See www.4-ProductionSpace.com for details.

The New Village at Patchogue project has emerged into the spring with accomplished milestones that include the completion of the Building 5 elevated structural post-tension slab and the breaking of ground for foundation at Building 4. These two structures will begin the vertical rise along Main Street and will place all of the five buildings in active progress. Building 1 is the Northeast building at the corner of Lake and No. Ocean and is topping out it framed units at the third floor. Building 2 has erected its initial section of the first floor and masonry structures have been completed as some of the stair and elevator shafts. Concrete systems are progressing toward completion of the main structural post-tension slab at the Building 2 & 3 connection and wood systems will follow along that same path. Mechanical, Electrical and Plumbing systems are roughing at framed units.

 

External site work will move toward the installation of sub grade structures and utility distribution conduits to make way for the services that support the project.

 

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

This space is adjacent to a covered loading dock. It includes 300 AMP 3- phase electric and has a 20' ceiling height that allows for optional 2nd story office, mezzanine or storage. It is fully sprinklered pre-cast construction. The campus-style business park is home to a diverse group of businesses surrounded by a wildlife sanctuary.

 

Just North of the 4-way interchange at I-88 and Farnsworth Road.

 

View All Commercial Properties for sale in Naperville and Aurora, IL

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

Get out of your office to relax, network with other members, catch up on the market on our 60 inch TV, and have a free cup of coffee.

 

Contact:

David Jakubowski

45 Rockefeller Plaza

at 630 Fifth Avenue

20th Floor

New York, NY 10111

212.918.4832

 

david@rgbc.com

www.rgbc.com

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

Beautiful, move-in condition office suite available in boutique building located on quiet block in desirable TriBeCa neighborhood. Space features exposed brick, light/views on three (3) sides and is configured with two (2) windowed offices, three (3) interior offices, open bullpen, reception. Space measures 2,250 sf and asking rent is $34.67/sf, $6,500/month.

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

Looking for a service office other then chevron house? We have an extensive list available in our network. Located within the CBD or at the fringe. If conventional office space is more suitable for your business requirement, we have vacant units all over

Singapore ready for a seamless transition . Do kindly contact Stanley Wong @ 90691184 for more details and availability.

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

Location, location, location. Where you rent office space can make or break your business. Our office space for rent is furnished, equipped and staffed. Great for professionals and solo-preneurs – focus on what raises revenue and leave the rest to us. Learn more at www.virtualofficestaff.com or call 973-509-4632

  

The last few minutes before I've been done with work. Spacing out...

Corner of US HWY 301 and Everhart Rd

Riverview, FL 33578

 

Pavilion Crossing is a Publix-anchored shopping center in Riverview, Florida, conveniently located at the entrance of the Pavilion residential community which features over 500 homes. Pavilion I is a 13-acre site located on the northwest corner of Falkenburg Road and US Highway 301, with 120,000 sq. ft. of space planned for office and/or retail. Pavilion Crossing is currently under development, scheduled for completion in early 2011.

  

For more information visit www.adlergroup.com/listings/properties.aspx?propid=37

New Village at Patchogue project has almost completed construction of all structures in their vertical rise. Roof trusses are topping off Buildings 3 and 4 to the West while Buildings 2, 1, and 5 are fully roofed. Siding systems at Buildings 2 and 1 are very far along with trim details at Decks being completed. The building elevations present many different features and with much in place, the true charm of the buildings is becoming evident.

 

Exterior site features are being prepared to accommodate parking lot, sidewalk and landscape features and interior features are becoming a primary focus in the move toward completed buildings.

 

Exterior Brick and Stone are commencing at Building 5 while these features are nearing completion already at Buildings 1 and 2.

 

The interior of Building 1 is being trimmed, painted and tiled with cabinetry and floorcovering features moving forward as well. Building 2 is currently being sheetrocked and similar progress is soon to follow at Building 5.

 