New Village at Patchogue project has almost completed construction of all structures in their vertical rise. Roof trusses are topping off Buildings 3 and 4 to the West while Buildings 2, 1, and 5 are fully roofed. Siding systems at Buildings 2 and 1 are very far along with trim details at Decks being completed. The building elevations present many different features and with much in place, the true charm of the buildings is becoming evident.
Exterior site features are being prepared to accommodate parking lot, sidewalk and landscape features and interior features are becoming a primary focus in the move toward completed buildings.
Exterior Brick and Stone are commencing at Building 5 while these features are nearing completion already at Buildings 1 and 2.
The interior of Building 1 is being trimmed, painted and tiled with cabinetry and floorcovering features moving forward as well. Building 2 is currently being sheetrocked and similar progress is soon to follow at Building 5.
Fully furnished office space for your business. Located in Central Block Ayala Malls IT Park
Amenities:
- Exclusive Dedicated Office
- 100mbps+ FIBER OPTIC Internet Connection
- Brand New Facilities and Computer
- 24/7 Backup Generator
- 24/7 Security
- 24/7 IT Chat Support
- Conference / Training / Interview Room
In downtown Washington's East End, The Tower Companies and The Lenkin Company turned 1050 K Street—a former parking lot near the old DC Convention Center site—into the beginning of a neighborhood renaissance.
This 11-story, 136,000 square-foot LEED Gold boutique office building features the latest techniques in sustainable design—triple-scrubbed indoor air, 100renewable power from wind energy, recaptured runoff and ground water, hi-tech thermal floor-to-floor glass windows that maximize natural light, KONE EcoDisk elevator traction system and a rooftop garden.
1050 K Street, Washington DC, Architect: Hickok Cole
Since our last photo…
Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.
Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.
Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.
Suite G has the following:
2 Private Offices
Conference Room
Large Bullpen with Seating/Phones for 8-10
Private Bathroom
Kitchenette
2x Private entrance
Air Conditioning
T3 (Wi-Fi and Cat 5 jacks)
Nortel phone system (Monthly access fee plus usage
High volume/speed color printer (As used)
Fax Machine
Monitored Alarm System with Private Code
Industrial High Speed Color Copier
Office Space as low as $32/day!
See www.4-ProductionSpace.com for details.
Premier Business Centers is one of the largest providers of executive office suites in the United States with office locations near you. The Beverly Hills Triangle location is at 9595 Wilshire Blvd. Beverly Hills, CA. (www.pbcenters.com)
Large teamroom available within boutique shared office suites conveniently located near Manhattan's Port Authority Bus Terminal. Space features southern exposures from two (2) large windows, shelving and shared use of bathroom, pantry, mailroom, conference room and reception area. Space seats approximately 4-7 persons and asking rent is $2,500/month.
Newly available loft space in boutique Broadway building conveniently located steps from Ace Hotel in thriving NoMad/Chelsea neighborhoods. Space features hardwood floors, exposed ceilings, northern light/views and is configured in an open plan. Space measures 1,441 sf and asking rent is $44.00/sf, $5,284/month.
Cardboard box has been expanded to create an office wall/ patrician between the footpath and the workers. makes an official space of sorts
Inside of our San Jose office space we have also built out a separate mini-suite for anyone that needs their own suite but wants to take advantage of our tech infrastructure, receptionist, and other support services.
Teachers Federal Credit Union chose to open a branch at 31 West Main Street in the heart of TRITEC’s New Village Development
The space designed by Joseph T. Matthews Architects and constructed by TRITEC Building Company, Inc. The branch is beautifully appointed incorporating, white wainscoting, wall covering and original brick accents from the 1800’s.
When 31 West Main Street was purchased by TRITEC as part of TRITEC's redevelopment in Patchogue the building was indisrepair and in need of major renovations. TRITEC restored the building back to it’s original character replacing the third floor and replicating the original cornice built in 1897. TRITEC has been blending the elements of the original structure into the current design and functionality of the building for our new tenants.
Waiting for a coat of varnish.
We pulled out the white (ugh) wall-to-wall carpeting upstairs, sanded and stained the original pumpkin pine floors (swoon).
In the office we knocked down the wall that was enclosing the chimney, painted the walls a happy shade of pear green (Spring Dust by Benjamin Moore).
No social niceties here. No small talk. Pure business late on a Friday night. Can't imagine how many pissed off people these guys have to deal with. They could charge a little less though.
Since our last photo…
Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.
Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.
Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.
Since our last photo…
Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.
Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.
Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.