ALE Heavylift performed two moves from Siemens on Shields Road in Walkergate to Neptune Energy Park in Low Walker for loading onto a barge. ALE Trojan 8870 BX65OAZ is seen in Low Walker turning from Fisher Street.into Neptune Energy Park in Low Walker.
TIANDI TJV4 HMT G+4+dropdeck+6 transport 200t transformer.
Sales Contact:
Jeff Lee
+86 186 0768 9697
Twitter: jeffgbc
Email: tiandihi@gmail.com
Video Demo: www.metacafe.com/channels/Heavylt/ (Metacafe)
www.youtube.com/user/fulangjie (Youtube)
ALE Heavylift performed two moves from Siemens on Shields Road in Walkergate to Neptune Energy Park in Low Walker for loading onto a barge. ALE Unipower P547HNT is seen here on Coutts Road turning onto the Fossway in Walkergate.
Heysehaven Franklin Offshore 2-2-2020 , drie bokken van Bonn-Mees MATADOR , MATADOR 2 & MATADOR 3 hijsen een J tower aan boord bij de SEVEN VEGA
Hoek van Holland 23-5-2021 , vertrek uit Europoort van de TRIUMPH van Dockwise met aan dek de GUARDIAN , bestemming Corpus Christi USA.
ALE Heavylift performed a movement of an electrical transformer weighing in at around 230 tonnes from Stella (Blaydon) to Wallsend overnight from 15th August to 16th August. On arrival at Swan Hunters in Wallsend it's to be shipped by barge to Ellesmere Port where it will be put back on the road to be taken to its destination of Oldbury. Seen at the North End of the Tyne Tunnel at East Howdon, the convoy is seen waiting to continue along Hadrian Road to Wallsend. The move was powered by a pair of ALE Trojan 8870 trucks with BX64KSE at the front with BX65OAW powering from the rear.
ALE Heavylift performed a movement of an electrical transformer weighing in at around 230 tonnes from Stella (Blaydon) to Wallsend overnight from 15th August to 16th August. On arrival at Swan Hunters in Wallsend it's to be shipped by barge to Ellesmere Port where it will be put back on the road to be taken to its destination of Oldbury. Seen at the North End of the Tyne Tunnel at East Howdon, the convoy is seen waiting to continue along Hadrian Road to Wallsend. The move was powered by a pair of ALE Trojan 8870 trucks with BX64KSE at the front with BX65OAW powering from the rear.
ALE Heavylift performed a movement of an electrical transformer weighing in at around 230 tonnes from Stella (Blaydon) to Wallsend overnight from 15th August to 16th August. On arrival at Swan Hunters in Wallsend it's to be shipped by barge to Ellesmere Port where it will be put back on the road to be taken to its destination of Oldbury. Seen at the North End of the Tyne Tunnel at East Howdon, the convoy is seen waiting to continue along Hadrian Road to Wallsend. The move was powered by a pair of ALE Trojan 8870 trucks with BX64KSE at the front with BX65OAW powering from the rear.
ALE Heavylift performed a movement of an electrical transformer weighing in at around 230 tonnes from Stella (Blaydon) to Wallsend overnight from 15th August to 16th August. On arrival at Swan Hunters in Wallsend it's to be shipped by barge to Ellesmere Port where it will be put back on the road to be taken to its destination of Oldbury. Seen at the North End of the Tyne Tunnel at East Howdon, the convoy is seen waiting to continue along Hadrian Road to Wallsend. The move was powered by a pair of ALE Trojan 8870 trucks with BX64KSE at the front with BX65OAW powering from the rear.
ALE Heavylift performed two moves from Siemens on Shields Road in Walkergate to Neptune Energy Park in Low Walker for loading onto a barge. ALE Trojan 8870 BX65OAZ is seen moving from the factory onto Shields Road in Walkergate. Close up of the Trojan 8870 badging.
To watch the full video visit our YouTube page: www.youtube.com/user/ALEHeavylift
ALE successfully completed the transportation and lifting of 25 heavy lifts for Thai Growth Project.
The project took place within a 30 day window, using the AL.SK190 as the main lift crane, as it enabled significant cost and schedule savings to the construction process.
The heavy lifts ranged from 73te to 813te and were lifted from one location to avoid the cost and time of re-digging / re-rigging and re-locations.
Due to the high out-reach capacity of the AL.SK190, the columns could be lifted over the new structure, which avoided the need for multiple crane locations and enabled other structures and pipe racks to be installed ahead of schedule.
The lifting window was successfully reduced from three months to 30 days and minimum ground preparation was required for the 25te m² loading under the mast foot and ballast.
GCS Johnson Ltd of Richmond, North Yorks were also involved with the move using their Mercedes Benz Arcos, although it had the smaller load, it was still without doubt an important part of the wind turbine. It is seen here on Shields Road in Walkergate leaving the Siemens Factory.
Former Heavylift International CRJ900 ferried to Shannon 12/5/12 after almost 5 years parked at Ras al Khaimah.
TIANDI TJV4 HMT G+4+dropdeck+6 transport 200t transformer.
Sales Contact:
Jeff Lee
+86 186 0768 9697
Twitter: jeffgbc
Email: tiandihi@gmail.com
Video Demo: www.metacafe.com/channels/Heavylt/ (Metacafe)
www.youtube.com/user/fulangjie (Youtube)
LONE geladen met Damen Sleepboten , 2 x ASD TUG 3212 , 4 x ASD TUG 280 , 3 x ASD TUG 2411 , 2 x STAN TUG 2608 en 1 x MULTICAT 1908 , transport kwam uit Vietnam.
Heavylift Cargo Airlines leased this Ilyushin IL-76TD, RA-76758 (c/n 0073474203), from Volga-Dnepr Airlines to serve the Southampton-based 'Oil Spill Service Centre'.
The aircraft was damaged beyond repair on the ground in a typhoon at Guam Air Base, Micronesia, on 8 December 2002.
Photo: Dick Gilbert, Stansted, 15 June 1993.