View allAll Photos Tagged framework

framework vernissage 8. Januar 2011

 

Foto: Katharina Tenberge

Burning hydrogen caused the duralumin framework to collapse on passengers and crew still trapped within the wreckage.

In the framework of the National Model United Nations held in Azerbaijan on 20-23 February 2016, the simulation of the UN General Assembly on the case of strengthening of the UN system and reform of its main institutions was organised.

 

87 people participated in the simulation conference during four days. The sessions were moderated by Azer Abasaliyev and Turkan Mukhtarova. Two draft resolutions were submitted by the member states, one of which sponsored by Canada, Nigeria, France, United Arabic Emirates, the United Kingdom of Great Britain and Northern Ireland, the United States of America, the People's Republic of China, Netherlands, Indonesia and Belgium was adopted by a two-thirds majority. As the result of the game, the participants were awarded with certificates. For their outstanding contribution to the committee the following delegates were awarded at the closing ceremony.

 

-Murad Ismayilov, the delegation of Canada (Best Delegate)

-Etibar Etibarli, the delegation of Nigeria (Best Debater)

-Bahlul Yusifli, the delgation of India (Best Position Paper)

-Gunay Alibayli, the delegation of France (Honorable Mention)

-Daniz Safarova, the delegation of Iran (Honorable mention)

-Faik Isazada, the delegation of Denmark (Honourable Mention)

 

Photos by Dilavar Najafov and Yagub Jafarov

Two initial design frameworks were developed, each speaking to differing priorities. We soon realized a balance between Model A and B was needed to accurately apply Winaca’s desires while integrating sustainability, cultural incentive and pragmatics. Thus Model C was used throughout the design of the Living Quarters and should will be applied to future sections of the Design Center.

The Framework building in Portland by Works Partnership Architecture

framework vernissage 8. Januar 2011

 

Foto: Katharina Tenberge

On page 114 of Handcrafted CSS, Dan Cederhom gives a hat-tip

to CSS frameworks, with a screenshot of the 960 Grid System.

Where there once was a middle school is now the first above-ground framework of the office building being constructed as a part of Bakery Square 2.0

The deck framework is built using 2x8 treated pine and lots of Strong-Ties. The octagon shape presented a bit of an issue but it was worth the hassle.

February 7, 2015

The Courtyard on Broadway

Ocala, FL

a rectangle isn't always a rectangle.

Next: Aquapanel Outdoor (coming soon)

February 7, 2015

The Courtyard on Broadway

Ocala, FL

اگر مطلع باشید ، این پیکره را که بر سر در بازار قیصریه اصفهان نقش بسته ، طالع اصفهان می خوانند.

تعبیر های متفاوتی در خصوص آن وجود دارد که مقاله کاملی در این خصوص در مجله "نما" شماره100-101 به قلم آقای محمد علی موسوی فریدنی به چاپ رسیده است. اما جالب ترین تعبیر آن حدس این موضوع است که هنرمند به خصومت و دودستگی اصفهانی ها اعتراض کرده است.اخلاقی که هنوز...............................ا

The Government of Azerbaijan and United Nations launched the formulation of the joint strategic partnership framework for the next five years.

 

The Ministry of Economy and Industry hosted the launch of the joint consultation process, which brought together senior government officials, development partners, representatives from the private sector and civil society to identify the broad priority areas for the cooperation between the UN system and the Government. The prospective collaboration framework will be aligned with the national priorities that are articulated in ‘Azerbaijan: Vision 2020’ development concept, which builds on the country’s latest socio-economic achievements and provides a framework for its transition from a traditional economy to a knowledge-based, competitive and diversified economy.

 

The new strategy will support the agreed international goals and Post-2015 Development Agenda, a new framework for sustainable development, reaffirming the mutual commitment of the Government of Azerbaijan and United Nations to further deepen partnership and continue working in a concerted and effective manner. It will constitute a robust mechanism to foster coherence, relevance, effectiveness and efficiency within the UN system, and will give a significant attention to achieving results, with a focus on strengthening national Monitoring & Evaluation (M&E) capacity and deepening the integration of M&E into national development planning process.

 

On behalf of the Government of Azerbaijan, the Ministry of Economy and Industry will further co-lead the process of the preparation of the next partnership strategy until the end of August together with the United Nations and in consultation with all government and international partners. The strategic directions and expected results of the next partnership framework will be validated tentatively by end-September and endorsed by the Government by December 2014.

 

The verandahs have been started. This is the view from ground level looking across from West to East from the top of the driveway. It is estimated that this work will take about 4 days to complete - 13 March 2007

The framework is very confusing! I'm glad I don't have to try and open the frames!

most popular ajax frameworks

Construction folk continue work on the lift framework.

1 2 ••• 41 42 44 46 47 ••• 79 80