View allAll Photos Tagged electrifying
Wrinkley kindly sent this photograph for publication.
Steelwork work on the overlap onto the Wigan line.
Copyright Wrinkley 2018.
This was pure fun shot
Used a beauty dish at top of model
Reflector below model
Speed light pointed at backdrop
#145 / 365 - #1970 / Year 6 - 21.07.2013
Reg kindly sent this photo for publication.
The initial grading work appears to be completed, with new plant appearing on site.
Copyright Reg 2016
A mast gap opposite Platform 1?
A mast base is near the rear of the train. The next mast is beyond the bridge behind the camera. How will the wires be suspended in between?
Twyla, I am very disappointed she has marks on her face, little dots and I don't think they are freckles, I thought they were just hairs and I could wipe them off, I should have paid more attention and grabbed a different one, and I paid full price too, apart from that I do like her, her hair though like the others not perfect but what Twyla doll is? her outfit is very cute too, I noticed her shadow things on her legs are gone and she only has a bit on her arm the dark she has only one dark arm, that's a bit of a shame, her pet thing is cute, she's awesome just can't get past the marks I don't know what to do, her hair is gonna need some care anyway on top of it all, Clawdeen also has a mark what is going on? loving the new sister body though.
A Northern Electric Class 319 hurries through Prescot with a Lime Street to Preston semi-fast, next stop St Helens Central.
Taken looking northeast from Prescot's northbound platform..
HST 43063 passes the piles for electrification masts, which should be buried in the ground, but currently adorn the lineside in various locations along the GWML.
The german built 'HOPS' is clearly no match Isambard's track bed, which is doing its best to resist change for as long as possible!
HOPS is the £40m High Output Plant System, built for Network Rail by Windhoff GmbH, which should put in 18 piles in a 6 hour shift!
The FGW blue HST was 1B46 1445 London Paddington to Swansea, which was later diverted via Bath following a suicide that closed the line between Wootton Bassett and Bristol Parkway.
43131 was the rear power car on 1st October 2015
Electrification of the Midland Main Line is now relatively advanced here at Finedon Road O/B, but a shot still seems possible from this angle - so not a *total* write-off then.
All steelwork appears to be up on both sides of the rebuilt overbridge, with provisions for wiring into the first track of the Up Yard visible in the background (you might need to zoom in!); cantilevers have been affixed on the masts to the right of the railway beyond the red crate on the ground.
Reg has kindly sent this photo for publication.
Reg added: "I took this from Lever St looking towards Burnden sidings showing electrification work inching along. Further masts can be seen in the background, whilst careful study of the foreground shows one of several mast bases that have appeared alongside the Platform 5 line."
Copyright Reg 2017
The Chase line is closed until August 29th 2017 for preparatory works for the impending electrification through to Rugeley Trent Valley. New gantries can be seen in this shot of Walsall.
Wrinkley kindly sent this film for publication.
The substantial concrete block is lifted into position on the bridge's western abutment.
Wrinkley shot this from the retail park east of the station looking west.
Copyright Wrinkley 2015
Alone my fear of the second step on a ladder is enough to prevent me doing such work but add in the electricity power lines and I have a problem simply watching. Ten trees taken down by one man and two chainsaws!. Excellent work done in short time organised by the local garden contractors Tschugg in Ottobeuren who over the years have always carried out such work very professionally. I should add I asked for the tree stumps to be left at about 4m and to cut down the top in large chunks.
Western Desert - Siwa Oasis - Egypt
-----------
Taken by Nikon D7000
Editing by Lightroom
ISO 320
Nikkor 18-105 @18mm
f/8
30 sec.
--------
The train seen in Paul Gaskell's film 5524m leaves at Earlestown Platform 3 where it curves hard left onto the Chat Moss Line.
Taken on the first day the Lime Street to Warrington Bank Quay service was fully electrified, looking west.
The 4th Backdoor Ventures Arts and Music Festival
SM Megamall, Megatrade Hall 3, Mandaluyong City, Philippines
30 August 2008
Wrinkley kindly sent this photo for publication.
The view south from Moses Gate bridge, with weeks of work ahead following the burst water main.
Copyright Wrinkley 2017.
Gralistair kindly gave this photograph for publication.
This gives some comfort to worries that the signal may be obscured by the mast-to-be off the north end of Platform 1..
Copyright Gralistair 2018.
I Know I haven't been a very good contact the last couple of day's, I will get to see all your work soon. I've been really buisy this week, and I want to have time to really look at your work, and not just give generic comments..
Congresswoman Pelosi joins Governor Jerry Brown, Representatives Anna Eshoo and Jackie Speier, Mayor Ed Lee, and community leaders for the Caltrain Electrification Project groundbreaking at the Millbrae Caltrain Station.
Paul Gaskell kindly gave this photo for publication.
Orlando Street bridge looking south from the station. Note the curved parapet top which appears to be between the footpath and the roadway. Does anyone know if it is?
Copyright Paul D Gaskell 2016
Reg kindly sent this photograph for publication.
He added: "Earth wires running opposite Platform 1 through the station."
Copyright Reg 2018.