View allAll Photos Tagged constructionsite
Start of tour from entry gate, where future parking lot will be located. Building in front of stadium is offices/locker rooms. North is to the left; south to the right.
Allévägen towards Ankaret. A new stretch of the road is being constructed near the commuter station.
...outside one of the new houses at Kryddgården. In the background house number 7 is being lifted in to the right place with a red crane.
Le temps a laissé son manteau
De vent, de froidure et de pluie,
Et s`est vêtu de broderie,
De soleil luisant, clair et beau.
Il n`y a bête ni oiseau
q`en son jargon ne chante ou crie:
«Le temps a laissé son manteau
De vent, de froidure et de pluie.»
Rivière, fontaine et ruisseau
Portent, en livrée jolie,
Gouttes d`argent d`orfèvrerie.
Chacun s`habille de nouveau.
Le temps a laissé son manteau.
-- Charles d `Orléans (1394-1465)
Chinese and Brazilian Firms Building the New Angola
LUANDA (IPS) - "In Luanda there are no matches." This was the first line of a report written by Nobel Literature laureate Gabriel García Márquez in the Angolan capital in 1977.
In Kanagawa JAPAN, 2009. Taken with iPhone, and processed by app "Polarize".
The sand blocks hill, near soccer ground on the riverside. The small cute bulldozer was parked there.
May 25, 2025 - The former YMCA building located at 40 W Long Street in downtown Columbus, Ohio.
"A plan to renovate the former Downtown YMCA building will be moving forward after receiving design approval from the Downtown Commission today.
Representatives of the developer, Woda Cooper Companies, explained to the board that they will be seeking historic tax credits for the project and that all of the preservation requirements of that program will be followed. That means that the building’s decorative masonry work will be cleaned and its windows replaced, but the overall appearance will not change much. A new enclosed stairwell will be added to the rear of the building to provide a safer means of exit for residents than the outdoor fire escapes that are there now.
The renovation, which could take as long as two years to complete, will turn the building into a 121-unit affordable housing complex. Rents in the apartments will be affordable to tenants earning between 30 and 80 percent of the area median income (AMI).
Jonathan McKay of Woda Cooper said that 33 of the units will be rented to those earning 80 percent of the AMI (or around $66,000 for a family of two), while the rest of the units would be reserved for households earning between 30 and 60 percent.
The century-old building, located at 40 W. Long St., served as the center of operations for the YMCA of Central Ohio for decades and was also home to approximately 400 people, who lived in dorm-style rooms with shared bathrooms. The condition of the living quarters and the cost to renovate the building were both cited as reasons by the organization to sell the property in 2019. Downtown Columbus Inc. bought the building in 2023 and selected Woda Cooper to head up the renovation.
Materials submitted to the commission show that the project will be called “The Lofts at 40 Long.” Previous article from: columbusunderground.com/plan-to-renovate-downtown-ymca-bu...
March 9, 2026 - Construction site across the street from our hotel. On a vicinity walking tour around Sabaidee @ Lao Hotel neighborhood in Vientiane, Laos
Image from the Darlington Local Studies picture collection. If you would like a copy of this image please contact local.studies@darlington.gov.uk quoting picture reference 'E730008247', or if you would like to see other images of the Darlington area please visit the Centre for Local Studies, at Darlington Library.