View allAll Photos Tagged constructions

maybe someone knows the name of this device/machine. it's a little bobcat with a pointy drill type thing on the front. the operator "drills' into the cement; and another larger front end loader type scoops up the pieces and pushes them out of the way. this is part of the renovation they are doing at the mall where we walk in the morning. they are breaking up the sidewalk 'pad' so they can move the front facade out. sure makes a LOT of noise!!!........lots of big doings-- maybe the economy is turning around??

 

#ds676 Construction seems to be perpetual: streets, sidewalks, buildings. Make a photo of something under construction today.

Construction Resumes ‘line up’ of professional writers have the insight through years of working in Senior Human Resources roles for Australia’s biggest Construction and Mining companies, the experience and talents our writers possess and can offer is invaluable to any job seeker, at any level of their career.

We had to make a number of small, turning steps toward the garage end of the deck.

Construction on the nature-themed playground and west-side trail connector under US-264A continues on Monday, May 1, 2023. The playground and welcome center are scheduled to officially open on June 1, 2023.

This one seems to have an elevator for the driver.

Location: Düsseldorf / Germany, Bleichstraße

Some construction going on near home, so I camped out with the tripod and watched for a while. My job seems so boring...

Island Eastern Corridor (Chinese: 東區走廊) is an expressway along the north shore of Hong Kong Island in Hong Kong. It starts from Causeway Bay in the west and ends in Chai Wan in the east. It is part of Route 4. The section between Causeway Bay and Quarry Bay consists mainly of viaducts built along Victoria Harbour.

 

東區走廊(俗稱東廊),是香港4號幹線的快速公路路段(佔約7.9公里),亦是4號幹線的起始路段,沿香港島區銅鑼灣至柴灣海岸興建,連接銅鑼灣及柴灣。全線為三線及部份二線或四線雙程分隔公路,主要為高架道路。車速限制為每小時70公里。

 

Hong Kong • 香港 '12

- - - - - - - - -

twitter

Pedestrian bridge construction at Shafer and W Franklin St for the Richmond 2015 UCI Road World Championships coming in two weeks.

 

richmond2015.com/

Wood, Stone and Brick in symmetry.

collage, colored pencil and graphite on paper / 42cm x 29cm / 1996

at construction site where construction hasn't been happening for a while now, apparently

Building Legosaurus Rex's excellent Lego Ebon Hawk design (rebrickable.com/mocs/MOC-10822/legosaurusrex/star-wars-eb...) from scratch. Six Bricklink orders, ~800 pieces, and ~$150.

G-660 is a high-performance dry set tile adhesive to be mixed with water or latex for installing medium & large format ceramic tiles, vitrified tiles, marble and stone on floors and walls. Combine with SLS-1000 Crete Admix for improved performances.

 

For more info please visit:

 

shawarconchem.com/product/t-shirt-with-logo/

  

Construction of the Cheetah Chase launched water coaster at Holiday World and Splashin Safari, built by ProSlide Technology. Opened in 2020.

 

Photos made during a private ACE event tour led by park management.

Torino Olympic Footbridge - Italy

HDA : Architec & Engineer

Client : Agencia Torino

Architect : HDA

Date : 2003 - 2006

See more at : www.hda-paris.com/

Construction of the Cheetah Chase launched water coaster at Holiday World and Splashin Safari, built by ProSlide Technology. Opened in 2020.

 

Photos made during a private ACE event tour led by park management.

Construction site for the new "Weserufer" residential buildings

Port of Spain, Trinidad and Tobago

1 2 ••• 47 48 50 52 53 ••• 79 80