View allAll Photos Tagged configuration

Lab Purpose:

Observed STP working principal, learn how to change STP common

parameters such as STP priority, STP interface cost, STP interface

priority.

Learn how to modify a switch to a primary root or a secondary root.

Learn how to enable rapid STP.

Click the below links to view the complete lab configuration.

Switch STP Basic Configuration Lab

 

CCIE University

The proposal for an adaptive housing project and its chosen location arose from two obstacles that all modern cities, and the world as a whole, face. The urban environment is revered for its cultural amalgam of people and wide range of demographics; however with this density and diversity comes a shortage of one type or another of commodious housing. Additionally and consequentially, the city must expand and build new buildings, leaving older, unsuitable building vacant. An adaptive architecture would allow families to grow and demographics to shift within the established community, all the while reinvigorating that second obstacle the city and the world is facing today - the disconnect from our natural world. Adaptable housing that also displays its adaptive forces in its form and texture, as responses to environmental conditions, would raise public awareness of the forgotten lessons that nature has to teach our modern society.

 

This video describes how this single unit can be transformed into various configurations, through the use of floor panels and an accordion wall system.

 

Watch this video on Vimeo. Video created by Kevin Mowatt.

Hardware configuration​

 

CPU

 

Allwinner H6 Quad Core 64bits Quad-Core Cortex-A53@1.8GHz

 

GPU

 

Mali-T720

 

RAM

 

4G

 

ROM

 

32G/64G

 

6K/4K Video

 

HDR10 ,HLG,HDR,6K 30fps,4K 60fps, 1080p 60fps video decoding,

including H265/HEVC Main/Main 10 profile level5.2 High-tier;

 

4K 60FPS;H264/AVC BP/MP/HP level5.1,MVC,4K 30fps;

 

WIFI

 

802.11 b/g/n/AC (very fast WiFi, near 1000Mbs) Dual band Wifi , 2.4G and 5G with Bluetooth

 

Memory card

 

Support TF card, up to 32GB

 

HDMI

 

HDMI 2.0a;HDCP2.2

 

OTG

 

yes

 

HOST

 

USB 2.0 /3.0

 

Operating system

 

Android 9.0

 

Video Output

 

HDMI,AV

 

Bluetooth

 

YES

 

modname=ckedito

 

modname=images&cols=1&colspace=10&rowspace=10&align=center

 

modname=images&cols=1&colspace=10&rowspace=10&align=center

 

modname=images&cols=1&colspace=10&rowspace=10&align=center

 

modname=images&cols=1&colspace=10&rowspace=10&align=center

 

modname=images&cols=1&colspace=10&rowspace=10&align=center

 

modname=images&cols=1&colspace=10&rowspace=10&align=center

 

modname=images&cols=1&colspace=10&rowspace=10&align=center

 

modname=images&cols=1&colspace=10&rowspace=10&align=center

 

modname=images&cols=1&colspace=10&rowspace=10&align=center

 

modname=ckeditor

 

If you choose the tv box with Google assistant air mouse , your package will include G10S Voice air mouse as below:pls note it will has no IR remote control included

Google assistant air mouse

 

snip.ly/x3iq98

Configuration 1- (Standard) Two rear quarter seats with storage underneath. Notice the seatback and cushion are easily removed when not in use. This would be an excellent location for casting off the stern. Both hatches are finished in non-skid for added safety.

 

For more tests, reviews, captain's report go to Boston Whaler 210 Montauk (2015-) model page

Lab Requirement: Only PC1 can remote access the router.

 

Click the below links to view the complete lab configuration.

ACL Working on VTY Line Configuration Lab

 

CCIE University

AMD Radeon RAMDisk Configuration Utility_01

Bunk Configuration Cabin E114

Ansible meetup 20150411

Street Lights While Drving

FxCamera App - SymmetriCam

Multi-Reflection Configuration

Google G1 Mobile

plastic scm configuration: prefix scm

Configuration of Outlook 2003 for mailing to opensource list - part1: email options

Lab Purpose: Master VLAN and VTP configuration

Lab Requirement: Set VTP to www.ccieuniversity.com , password

www.ccieuniversity.com.

Set SwitchA to VTP Server mode,create VLAN 10 name ccieuniversity1

and VLAN 20 name ccieuniversity2,enable VTP pruning.

Set SwitchB to VTP Client more,assign interfaces Fa0/1—10 to

VLAN10, Fa0/11—20 to VLAN20.

Set SwitchC to VTP Transparent mode.

Click the below links to view the complete lab configuration.

Switch VTP Configuration Lab

CCIE University

 

I have no way to account for this, and I am a filthy person.

white 458 italia. Love this configuration.

Configuration options for the placement of notification banners in Apple's iOS.

Platz, Cheryl, 2020. Design Beyond Devices: Creating Multimodal, Cross-Device Experiences. New York: Rosenfeld Media. rosenfeldmedia.com/books/design-beyond-devices/

End of 2004 - Update configuration

 

PowerMac G3 -> PowerMac G5 + PowerBook G4

Lab Purpose: Master static route and default route configuration

Click the below links to view the complete lab configuration.

Static Route Configuration

 

CCIE University

Lab Purpose:

Master switch basic configuration.

Master switch port security configuration.

Lab Requirement: finish basic configuration including ip address, default gateway.

Enable port security on Fa0/3 to allow maximum 10 mac address to be learn, others

will be dropped.

Click the below links to view the complete lab configuration.

Switch Basic Configuration And Port Security

 

CCIE University

Military Industrial Complex somewhere in the Regalia sector of star system Riddley 7.

This is the configuration I used to do the 165 second stability test of the Joby Gorillapod SLR_Zoom, with the camera in vertical position. Notice that the leg on the left is curled, so it touches the ground and goes back up to support the outside edge of the camera. It felt solid and safe, and took about 15 seconds to configure.

I used this configuration because the Gorillapod was difficult to configure in the traditional stance, with three (kind of) straightened legs; It took 90 seconds to configure, and did not feel safe and steady… however, I was able to get a 2 minute exposure without any blur.

I was also able to use vertical orientation with good results by removing the ballhead and Z-Finder bracket, But, I still prefer wrapping the leg up so it supports the camera body, even though the camera is an inch or two closer to the ground.

The tripod is rated to hold a camera that weighs 3 kg (6.6 lbs.). This is a Canon 5D mark II, Canon EF 100mm f/2.8L IS USM Macro Lens, and the mounting bracket for a Zacuto Z-Finder Pro 3x. Total weight; about 1.5 kg (3.3 lbs). The Z-finder bracket added about 30 g, and put the camera farther from the center of gravity of the Gorillapod, but, I wanted a worst-case-scenario.

Lab Purpose: Master OSPF basic configuration.

Master manually assign RID(Router ID).

Master how to modify ospf interface priority.

Observe DR BDR selection process.

Lab Requirement: R3 would be the DR,R2 would be BDR, R4 will not

participate in the selection.

Click the below links to view the complete lab configuration.

OSPF Basic Configurationand DR BDR Selection Lab

 

CCIE University

Bottom of left jug 17

Top of left jug 18

Right jug 20

ma configuration reshade

my reshade configuration

Children in Heat group show at Lawndale Art Center in Houston, TX qith Timothy Warner & Jessie Ruddick

A Riemann surface is a surface-like configuration that covers the complex plane with several, and in general infinitely many, 'sheets.' These sheets can have very complicated structures and interconnections (Knopp 1996, pp. 98-99). Riemann surfaces are one way of representing multiple-valued functions; another is branch cuts.

The object is visualized in Mathematica using atlas 2 for Mathematica.

 

To get copyable parametric equations (Maple, Mathematica, MathML, TeX):

digi-area.com/DifferentialGeometryLibrary/Surfaces/Rieman...

System configuration:

Alternator: Panasonic

Power control: Chint

Main alternator: Panasonic (Japan)

Compressor: AIRTAC (Taiwan)

Sensor: Omron (Japan)

Switch board: Chint (China)

 

Focusun is the world leader in ice making, chilling and refrigeration systems.

 

More information about our products on Focusun website: www.chinaicemachine.com

or: www.youtube.com/focusun

or: www.facebook.com/focusun

or: www.flake-ice-plant.com

or: www.twitter.com/focusun_ice

 

A look at the warehouse and the rigorous Assembly Configuration Testing (ACT) Process . Throughout the ACT process SOLiD ensures the quality of every piece of equipment before it leaves our warehouse and is shipped out to our customers. The quality and modularity of SOLiD's product make it the standard for excellence for DAS and In-Building wireless connectivity.

 

solid.com/us/

 

Lab Purpose: Master "router on a stick" configuration.

Click the below links to view the complete lab configuration.

Routing Between Vlans

 

CCIE University

Acrylic on Wood

9'W x 12"H

2011

1 2 ••• 71 72 74 76 77 ••• 79 80