View allAll Photos Tagged completed
A complete condominium remodel with a dramatic glass bar top supported by wood columns in an espresso stain. The features mutiple seating areas for entertaining and intimate gatherings. The kitchen also includes a bifolding closet system that houses the laundry and water heater plus additional pantry swing out storage.
Albion está por fin completa, tienen que llegarle unos ojos de color diferente, pero por ahora se queda asÃ. Ha pasado por la peluquerÃa (le he cortado la peluca, que estaba hecha un desastre, la he lavado, peinado...) y ahora sà que la veo guapÃsima.
He tenido problemas con ella porque no me terminaba de convencer, pero ahora la veo preciosa.
~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~
Albion is finally complete! Have to arrive a pair of eyes of different colour, but now she will stay like that. I've cut the wig, because it was a disaster, and now Albion is very more beautiful.
I had problems with her because I wasn't very sure if I liked her, but now I'm in love with her.
By Lu Bodaczny. ©All Rights Reserved. 2011 and beyond. Don't use, copy or edit any of my photos without written permission.
Like it? Info on my profile, thanks.
Follow us on FB: www.facebook.com/pages/-Maxi-Lus-Knitting-Shop-/55437732905
The build is slimmer, longer-legged and longer-winged than other clusterflies.
There is a distinct dark median stripe at the front of the thorax that is unique to this species.
The abdomen has less conspicuous tessellations than other clusterflies (except P. amentaria). From some angles an almost complete dark band occurs across the bases of tergites 3-5 (apparent tergites 2-4).
Yuntai Shan National Geopark, Henan Province, China. Complete indexed photo collection at WorldHistoryPics.com.
After an hour or so of cutting, folding and sticking, the HEY YOU G.U.Y.S packaging is pretty much complete. Here is a semi dark photo for you.
CEA Project Logistics completes a potentially difficult and technical installation project in Bang Nam Priao, Thailand.
The project consisted of the Transportation, Lifting and installation of several parts of distillation columns, evaporators and fans for a well-known drinks manufacturer. Total tonnage was over 46 Tonne with the largest part weighing in at 28 Tonne and over 23 meters in length.
All parts were discharged through the night at Laem Chabang Port and loaded on to several flat bed and low ride trailers. Due to its weight and dimensions the Evaporator Chamber upper part was loaded on to a multi axle hydraulic trailer.
The following day the trucks and their cargo made their way to the installation site in the province of Chachoengsao. Upon arrival all cargo was unloaded in the Factory’s lay down area while the site was inspected for suitability for the two mobile cranes that would be used. After all parties were satisfied the site was safe, two mobile cranes one 500 Tonne the other 80 Tonne were moved into their positions and tested accordingly.
On the morning of the installation final equipment and personnel were checked followed by a tool box talk held by CEA to the assisting companies’ workforce. After the talk a mandatory alcohol test was given to all by the onsite CEA Safety Officer.
The Evaporator Chamber was the first piece lifted, both cranes began a tandem lift until the chamber was vertical then the smaller 80 T crane was unhooked while the larger 500 T crane continuing the lift into the facility. CEA teams were placed on several floors to facilitate the lowering of the evaporator on to its base on the ground floor. Smaller parts were taken by CEA trailers to the installation site and assembled then lifted into the facility.
On the final day the 16 metre distillation chamber was transported on a low bed trailer to the sites lay down area. The same lift technique used for the Evaporator was used again with CEA teams inside once more ensuring a safe installation on to the chambers base and aligning it to the previously installed Evaporator chamber. Finally smaller parts were taken by CEA trailers to the installation site and assembled then lifted into the facility. CEA completed the project with all demobilization of equipment and personnel.
8 skeins of manos in colour 64.
4 mm for the pentagons and 4.5 for the sleeves and ribbing.
I've already worn it twice - I love it!
Remember that i posted a faerie last year, i've got the previous unfinished picture still here on my fotostream.
Well i got enough inspiration and micron pens so i got to finish her.
And i like it!!!
Her red hair and shoes were colored in with gel pens.
I made this picture with my phone so it.s not so clearly as it shut be
Stage one of my 2008 Night Rod Special build–Cosmetics. Badlands air box cover, Killer Customs rear fender and brake light kit, radiator cover, Vance & Hines competition exhaust, drag handlebars, Screamin Eagle stage one upgrade, 260 Metzler tire, custom black paint job, halo headlight and mount, side mount license plate and custom grips, pedals, and mirrors.
Redoing the front end next! Maybe I'll put some miles on it before I start that job..
The first panel of my heirloom quilt is shown here, proudly pegged onto my noticeboard, surrounded by photos of my family.
Completed photos from this year's Fountaindale Public Library Annual Holiday Memories Family Photo Day program.
Black and grey stage of D's back is now complete. One more session to finish of the arm and leg and we'll be moving on to the flowers!!
Construction of the South Gallery on Pier 15 is done. Here's a preview of the gallery and Tinkering Studio.
PARWAN PROVINCE, Afghanistan -- Spc. Morgan McAfee, a human resources specialist for Task Force ODIN-A, smiles as her company congratulates her following the oath of enlistment. McAfee, a native of Roanoke, Va., re-enlisted for another five years of service and a reclassification to become a public affairs specialist at Bagram Airfield, Apr. 05.