View allAll Photos Tagged Packing
Cleaning out cupboards and packing dishes! We made some great progress and then I packed more of my own crap, which just seems to never end. Oy.
I'm having trouble deciding, as usual! Basically we have 3 days and 4 nights there, plus 2 days of travel. Do I really need FIVE tee shirts? Oh, and I didn't draw my sketch kit, but that is going in my carry-on.
Así es como viajan las diademas de tiko tikoi en esta cajita bien reguardaditas a su lugar de destino, cajitas de colores alegres en el que puedes seguir guardando tu diadema !
Photos from Park[ing] Day L.A. in Santa Monica. Hosted by bicycling advocacy group Santa Monica Spoke with generous support from Cynergy Cycles, REI, and Swingers Diner, which is where we set up.
Parking day is an international event that began in San Fransico to call attention to the lack of quality public park spaces and the abundance of space we give for automobile parking, and flip them around.
Additionally Santa Monica Spoke wanted to illustrate bike parking and it's smaller foot print as a means to drive business. So we took over 2 parking spaces, and had a pop up park with adjacenent bike valet parking.
Our Director of Photography, Marcus Lehmann, and I check over the list of items we will be bringing on the trip. The camera equipment will have to be specially inspected by customs officials in New York and Antananarivo.
© 2014 M. Weisberger/AMNH
This is what my room has amounted to over the course of this week. Packing for college has caused me to tear apart my room.
The removal van is coming for us on Monday 29 June, and we're well ahead of schedule with the packing. By Sunday night this wall will be solid with boxes, the table dismantled and the pictures all bubblewrapped. Sad to leave in a sense, but London calls!
CEA were employed to pack and lash 77 units of Mud Skips, Cargo Baskets and Gas Racks into 14, 40ft HC containers, the cargo received was too wide to fit in to the containers in the conventional way and would have to be turned on its side. CEA would ready the containers for load out and transport them to port where the cargo would be shipped to Nigeria to be used in the offshore Oil & Gas sector.
PROCEDURE
Two wooden beams were placed on the floor in each of the containers, the cargo, on its side would be placed on these to ensure no damage occurred to the panels during loading, transportation and unloading. Lifting slings that would be used upon arrival in Nigeria were attached to each piece of cargo before packing.
A CEA reach stacker lifted each of the containers and placed them on to their sides upon wooden blocks. CEA fabricated specialised roller units to facilitate the loading, two units were placed underneath the front section to support the cargo while being loaded by forklift from the rear.
Mantiou 3.5 t forklift’s and 5 t pallet trucks loaded the cargo into the containers, both fork lifts and pallet trucks were covered with protective materials to prevent any damage to the cargo.
After all Mud Skips, Cargo Baskets and Gas Racks were loaded the CEA team lashed and secured them in place. Wooden chocks and stoppers were installed to further ensure no movement while transportation and shipping.
All necessary supporting documents were provided inside each container. A third party inspection team checked all loaded cargo and sealed the containers with the appropriate shipping tags. The containers were loaded on to flatbed trailers and transported to port to await shipping.
EQUIPMENT USED
Reach stacker
3.5t Manitou forklift
15t Mitsubishi forklift
Manitou telehandler
Pallet trucks
Isuzu DECA 360 prime movers
Flatbed trailers
CEA were employed to pack and lash 77 units of Mud Skips, Cargo Baskets and Gas Racks into 14, 40ft HC containers, the cargo received was too wide to fit in to the containers in the conventional way and would have to be turned on its side. CEA would ready the containers for load out and transport them to port where the cargo would be shipped to Nigeria to be used in the offshore Oil & Gas sector.
PROCEDURE
Two wooden beams were placed on the floor in each of the containers, the cargo, on its side would be placed on these to ensure no damage occurred to the panels during loading, transportation and unloading. Lifting slings that would be used upon arrival in Nigeria were attached to each piece of cargo before packing.
A CEA reach stacker lifted each of the containers and placed them on to their sides upon wooden blocks. CEA fabricated specialised roller units to facilitate the loading, two units were placed underneath the front section to support the cargo while being loaded by forklift from the rear.
Mantiou 3.5 t forklift’s and 5 t pallet trucks loaded the cargo into the containers, both fork lifts and pallet trucks were covered with protective materials to prevent any damage to the cargo.
After all Mud Skips, Cargo Baskets and Gas Racks were loaded the CEA team lashed and secured them in place. Wooden chocks and stoppers were installed to further ensure no movement while transportation and shipping.
All necessary supporting documents were provided inside each container. A third party inspection team checked all loaded cargo and sealed the containers with the appropriate shipping tags. The containers were loaded on to flatbed trailers and transported to port to await shipping.
EQUIPMENT USED
Reach stacker
3.5t Manitou forklift
15t Mitsubishi forklift
Manitou telehandler
Pallet trucks
Isuzu DECA 360 prime movers
Flatbed trailers
Marine debris are packed into containers for storage.
For more information, visit www.papahanaumokuakea.gov/
Follow us on Twitter: twitter.com/hawaiireef
Like us on Facebook: www.facebook.com/Papahanaumokuakea
Contact us by email: hawaiireef@noaa.gov
Photo by: NOAA Coral Reef Ecosystem Program Marine Debris Team, 2014
Leaving for Melaka for a short holiday tomorrow with the family.
Damn its nice to pack travel stuff in my backpack again. yay!
So its a rush to morning lectures in Arts, then home to grab my bag and then grab a bus to Melaka at 2. Hopefully we'll check in at Puri hotel by 6 and have a damn overdue-ed Peranakan dinner.
back on Sunday with tonnes of snacks. i promise.
CEA were employed to pack and lash 77 units of Mud Skips, Cargo Baskets and Gas Racks into 14, 40ft HC containers, the cargo received was too wide to fit in to the containers in the conventional way and would have to be turned on its side. CEA would ready the containers for load out and transport them to port where the cargo would be shipped to Nigeria to be used in the offshore Oil & Gas sector.
PROCEDURE
Two wooden beams were placed on the floor in each of the containers, the cargo, on its side would be placed on these to ensure no damage occurred to the panels during loading, transportation and unloading. Lifting slings that would be used upon arrival in Nigeria were attached to each piece of cargo before packing.
A CEA reach stacker lifted each of the containers and placed them on to their sides upon wooden blocks. CEA fabricated specialised roller units to facilitate the loading, two units were placed underneath the front section to support the cargo while being loaded by forklift from the rear.
Mantiou 3.5 t forklift’s and 5 t pallet trucks loaded the cargo into the containers, both fork lifts and pallet trucks were covered with protective materials to prevent any damage to the cargo.
After all Mud Skips, Cargo Baskets and Gas Racks were loaded the CEA team lashed and secured them in place. Wooden chocks and stoppers were installed to further ensure no movement while transportation and shipping.
All necessary supporting documents were provided inside each container. A third party inspection team checked all loaded cargo and sealed the containers with the appropriate shipping tags. The containers were loaded on to flatbed trailers and transported to port to await shipping.
EQUIPMENT USED
Reach stacker
3.5t Manitou forklift
15t Mitsubishi forklift
Manitou telehandler
Pallet trucks
Isuzu DECA 360 prime movers
Flatbed trailers
Ross packing at Longley Court while Baby looks on.
Ross (my ex) and I bought our first home in 2003. This photo was taken during our move to the new house.
"If you just move this clothing to one side, I'd fit in here and you wouldn't need to leave me behind."
CEA were employed to pack and lash 77 units of Mud Skips, Cargo Baskets and Gas Racks into 14, 40ft HC containers, the cargo received was too wide to fit in to the containers in the conventional way and would have to be turned on its side. CEA would ready the containers for load out and transport them to port where the cargo would be shipped to Nigeria to be used in the offshore Oil & Gas sector.
PROCEDURE
Two wooden beams were placed on the floor in each of the containers, the cargo, on its side would be placed on these to ensure no damage occurred to the panels during loading, transportation and unloading. Lifting slings that would be used upon arrival in Nigeria were attached to each piece of cargo before packing.
A CEA reach stacker lifted each of the containers and placed them on to their sides upon wooden blocks. CEA fabricated specialised roller units to facilitate the loading, two units were placed underneath the front section to support the cargo while being loaded by forklift from the rear.
Mantiou 3.5 t forklift’s and 5 t pallet trucks loaded the cargo into the containers, both fork lifts and pallet trucks were covered with protective materials to prevent any damage to the cargo.
After all Mud Skips, Cargo Baskets and Gas Racks were loaded the CEA team lashed and secured them in place. Wooden chocks and stoppers were installed to further ensure no movement while transportation and shipping.
All necessary supporting documents were provided inside each container. A third party inspection team checked all loaded cargo and sealed the containers with the appropriate shipping tags. The containers were loaded on to flatbed trailers and transported to port to await shipping.
EQUIPMENT USED
Reach stacker
3.5t Manitou forklift
15t Mitsubishi forklift
Manitou telehandler
Pallet trucks
Isuzu DECA 360 prime movers
Flatbed trailers
An up close view of a bee at work on a thistle flower, gathering pollen and packing it into a pollen basket on it's hind legs.
Those orange lumps are pollen that's been gathered from hundreds or perhaps thousands of flowers. Back at the hive, the pollen is mixed with either honey or nectar and turned into food for the bee colony at the hive.
Nature is fascinating.
Hurriedly packing our gear before the flight into the Homathko Icefield, British Columbia.
More on www.coldwilderness.tumblr.com
CEA were employed to pack and lash 77 units of Mud Skips, Cargo Baskets and Gas Racks into 14, 40ft HC containers, the cargo received was too wide to fit in to the containers in the conventional way and would have to be turned on its side. CEA would ready the containers for load out and transport them to port where the cargo would be shipped to Nigeria to be used in the offshore Oil & Gas sector.
PROCEDURE
Two wooden beams were placed on the floor in each of the containers, the cargo, on its side would be placed on these to ensure no damage occurred to the panels during loading, transportation and unloading. Lifting slings that would be used upon arrival in Nigeria were attached to each piece of cargo before packing.
A CEA reach stacker lifted each of the containers and placed them on to their sides upon wooden blocks. CEA fabricated specialised roller units to facilitate the loading, two units were placed underneath the front section to support the cargo while being loaded by forklift from the rear.
Mantiou 3.5 t forklift’s and 5 t pallet trucks loaded the cargo into the containers, both fork lifts and pallet trucks were covered with protective materials to prevent any damage to the cargo.
After all Mud Skips, Cargo Baskets and Gas Racks were loaded the CEA team lashed and secured them in place. Wooden chocks and stoppers were installed to further ensure no movement while transportation and shipping.
All necessary supporting documents were provided inside each container. A third party inspection team checked all loaded cargo and sealed the containers with the appropriate shipping tags. The containers were loaded on to flatbed trailers and transported to port to await shipping.
EQUIPMENT USED
Reach stacker
3.5t Manitou forklift
15t Mitsubishi forklift
Manitou telehandler
Pallet trucks
Isuzu DECA 360 prime movers
Flatbed trailers
CEA were employed to pack and lash 77 units of Mud Skips, Cargo Baskets and Gas Racks into 14, 40ft HC containers, the cargo received was too wide to fit in to the containers in the conventional way and would have to be turned on its side. CEA would ready the containers for load out and transport them to port where the cargo would be shipped to Nigeria to be used in the offshore Oil & Gas sector.
PROCEDURE
Two wooden beams were placed on the floor in each of the containers, the cargo, on its side would be placed on these to ensure no damage occurred to the panels during loading, transportation and unloading. Lifting slings that would be used upon arrival in Nigeria were attached to each piece of cargo before packing.
A CEA reach stacker lifted each of the containers and placed them on to their sides upon wooden blocks. CEA fabricated specialised roller units to facilitate the loading, two units were placed underneath the front section to support the cargo while being loaded by forklift from the rear.
Mantiou 3.5 t forklift’s and 5 t pallet trucks loaded the cargo into the containers, both fork lifts and pallet trucks were covered with protective materials to prevent any damage to the cargo.
After all Mud Skips, Cargo Baskets and Gas Racks were loaded the CEA team lashed and secured them in place. Wooden chocks and stoppers were installed to further ensure no movement while transportation and shipping.
All necessary supporting documents were provided inside each container. A third party inspection team checked all loaded cargo and sealed the containers with the appropriate shipping tags. The containers were loaded on to flatbed trailers and transported to port to await shipping.
EQUIPMENT USED
Reach stacker
3.5t Manitou forklift
15t Mitsubishi forklift
Manitou telehandler
Pallet trucks
Isuzu DECA 360 prime movers
Flatbed trailers
CEA were employed to pack and lash 77 units of Mud Skips, Cargo Baskets and Gas Racks into 14, 40ft HC containers, the cargo received was too wide to fit in to the containers in the conventional way and would have to be turned on its side. CEA would ready the containers for load out and transport them to port where the cargo would be shipped to Nigeria to be used in the offshore Oil & Gas sector.
PROCEDURE
Two wooden beams were placed on the floor in each of the containers, the cargo, on its side would be placed on these to ensure no damage occurred to the panels during loading, transportation and unloading. Lifting slings that would be used upon arrival in Nigeria were attached to each piece of cargo before packing.
A CEA reach stacker lifted each of the containers and placed them on to their sides upon wooden blocks. CEA fabricated specialised roller units to facilitate the loading, two units were placed underneath the front section to support the cargo while being loaded by forklift from the rear.
Mantiou 3.5 t forklift’s and 5 t pallet trucks loaded the cargo into the containers, both fork lifts and pallet trucks were covered with protective materials to prevent any damage to the cargo.
After all Mud Skips, Cargo Baskets and Gas Racks were loaded the CEA team lashed and secured them in place. Wooden chocks and stoppers were installed to further ensure no movement while transportation and shipping.
All necessary supporting documents were provided inside each container. A third party inspection team checked all loaded cargo and sealed the containers with the appropriate shipping tags. The containers were loaded on to flatbed trailers and transported to port to await shipping.
EQUIPMENT USED
Reach stacker
3.5t Manitou forklift
15t Mitsubishi forklift
Manitou telehandler
Pallet trucks
Isuzu DECA 360 prime movers
Flatbed trailers
CEA were employed to pack and lash 77 units of Mud Skips, Cargo Baskets and Gas Racks into 14, 40ft HC containers, the cargo received was too wide to fit in to the containers in the conventional way and would have to be turned on its side. CEA would ready the containers for load out and transport them to port where the cargo would be shipped to Nigeria to be used in the offshore Oil & Gas sector.
PROCEDURE
Two wooden beams were placed on the floor in each of the containers, the cargo, on its side would be placed on these to ensure no damage occurred to the panels during loading, transportation and unloading. Lifting slings that would be used upon arrival in Nigeria were attached to each piece of cargo before packing.
A CEA reach stacker lifted each of the containers and placed them on to their sides upon wooden blocks. CEA fabricated specialised roller units to facilitate the loading, two units were placed underneath the front section to support the cargo while being loaded by forklift from the rear.
Mantiou 3.5 t forklift’s and 5 t pallet trucks loaded the cargo into the containers, both fork lifts and pallet trucks were covered with protective materials to prevent any damage to the cargo.
After all Mud Skips, Cargo Baskets and Gas Racks were loaded the CEA team lashed and secured them in place. Wooden chocks and stoppers were installed to further ensure no movement while transportation and shipping.
All necessary supporting documents were provided inside each container. A third party inspection team checked all loaded cargo and sealed the containers with the appropriate shipping tags. The containers were loaded on to flatbed trailers and transported to port to await shipping.
EQUIPMENT USED
Reach stacker
3.5t Manitou forklift
15t Mitsubishi forklift
Manitou telehandler
Pallet trucks
Isuzu DECA 360 prime movers
Flatbed trailers