View allAll Photos Tagged NewBuild
Construction at Thandanani Crèche.
As part of SEIS Thandanani Crèche will be receiving:
1. Additional building – Kitchen, office, pantry/storage facility
2. Repairs: Floor and roof repaired, and doors painted
3. Fencing - the facility needed fencing.
4. Health & Safety: Fire extinguisher, first aid box, safety signage, and a fenced waste pit added.
5. Toilet facility: toilets were added to the facility
All work at the centre was concluded February 2019.
Newbuilding at HDW GmbH in Kiel (now with NSB funnel) 2009/05/06
NSB Niederelbe GmbH, Buxtehude
*2009 HDW GmbH, Kiel (# HDW 418) - first of two ships for NSB
L: 228.62m B: 32.22m D: 12.00m
GT: 36,087 TDW: 42,600mt 3,400 TEU
31,640 kW 23.25kn
Construction worker at Thandanani Crèche.
As part of SEIS Thandanani Crèche will be receiving:
1. Additional building – Kitchen, office, pantry/storage facility
2. Repairs: Floor and roof repaired, and doors painted
3. Fencing - the facility needed fencing.
4. Health & Safety: Fire extinguisher, first aid box, safety signage, and a fenced waste pit added.
5. Toilet facility: toilets were added to the facility
All work at the centre was concluded February 2019.
New toilets at Sibusisweni Crèche.
This centre is receiving repairs to its fence, roof, toilets, jungle gym and waste pit, as well as a filing cabinet.
One many building taken over and rebuilt or changing of use on the seafront Photographer Ernest Storey
New toilets at Zamani Crèche, which is conditionally registered and awaiting a new PCR certificate for full registration.
As part of SEIS the centre received an additional classroom, a toilet facility, fencing, fire extinguisher installed, waste pit, fixed leaks in the roof, signage
On the left is a perhaps 50 years old building, in Castle Peak Road, Shamshuipo, Kowloon, Hong Kong. On the right is a new building, one year old.
The warehouse is the size of three football fields--lots of room to store the food we distribute to our 535 partner agencies.