View allAll Photos Tagged NewBuild

Oooh nice. Wouldn't see that in Docklands.

Straight out of the camera look at the new builds going up near my house.

The wotsname tanks to deal with the flood/pop up lake that usually sits in the front left corner of the shot each winter have been buried (those green lids at eight o'clock) so that should see that particular water feature dealt with.

So far, apart from two new entrances cut through the Cornish Hedges, they appear to be leaving all the boundaries as they are. I hope so anyway, and can see no reason to remove them in any case.

They aren't half packed in close to each other though those houses - delightful.

New BAM/PFA building site tour, August 26, 2014. Photo: Peter Cavagnaro

BAM/PFA celebrated the mid-point of construction on its new downtown building with a public ceremony and block party on Addison Street on July 17, 2014. Over 500 people attended to show their support by signing one the last steel beams to be put in place. Photo: Peter Cavagnaro

FOLK President Carolyn Humphrey and husband Wilson provided a substantial donation for the Quiet Room.

Zooming in with the iPhone isn't the greatest.

Well, actually more of a charity store. I think this is to replace the rented space down the road.

 

Auto Smart Fix, and cropped.

The walls go up behind the stage November 2009

These three photographs were taken on 19th January 2009 and are from the Morchard Bishop side of the tree and junction.

Best viewed in large format

BAM/PFA celebrated the mid-point of construction on its new downtown building with a public ceremony and block party on Addison Street on July 17, 2014. Over 500 people attended to show their support by signing one the last steel beams to be put in place. Photo: Peter Cavagnaro

The dark brown will be in the main walkway, and the lighter brown will be under the adult collections.

Walls going up behind the stage in November 2009

As part of SEIS Thandanani Crèche will be receiving:

1. Additional building – Kitchen, office, pantry/storage facility

2. Repairs: Floor and roof repaired, and doors painted

3. Fencing - the facility needed fencing.

4. Health & Safety: Fire extinguisher, first aid box, safety signage, and a fenced waste pit added.

5. Toilet facility: toilets were added to the facility

 

All work at the centre was concluded February 2019.

 

1 2 ••• 50 51 53 55 56 ••• 79 80