View allAll Photos Tagged NewBuild
It was really good to have the original Wellpark Gates renovated and refitted.
'Bute Ironworks' did a great job.
The slab is broen where the footers are located for the support beams. They have been bolted in place. The hole will be cemented flush with the floor.
Original-Lehmziegel im Reichsmaß (Bezeichnung aus dem Kaiserreich). Diese Ziegel werden dringend für die Sanierung historischer Gebäude benötigt.
Newbuild. Damen Shoalbuster 3209 HARDINXVELD YN 571712, IMO 9688867, MMSI 244790875. Saturday 22nd November 2014. She had carried out a test sailing just 4 days prior to this photograph.
Project name: Neonatal Intensive Care Unit
|| Location: Royal United Hospital, Bath
|| Description: The new Neo-Natal Intensive Care Unit at Bath's Royal United Hospital is an innovative project intended to be at the forefront of the development of neo-natal intensive care across the UK. The proposal consists of a single storey new-build extension and the refurbishment of the space occupied by the existing NICU facility. The new-build element accommodates the clinical, support and reception functions as a discreet but contemporary intervention between two existing buildings. The refurbished element comprises staff and parents’ facilities.
A pioneering holistic and therapeutic approach towards the new building will create a new low carbon unit allowing the staff to practice new methods of care for premature and sick babies.
|| Architect: Feilden Clegg Bradley Studios
|| Developer/Client: Royal United Hospital
|| Main Contractor: Vinci Construction Ltd
|| Project manager: Provelio Ltd
|| Quantity Surveyor: Edmond Shipway
|| Structural Engineer: Buro Happold
|| Mechanical & electrical engineer: Buro Happold
|| Project Value: £3 million
Old classroom at Thandanani Crèche.
As part of SEIS Thandanani Crèche will be receiving:
1. Additional building – Kitchen, office, pantry/storage facility
2. Repairs: Floor and roof repaired, and doors painted
3. Fencing - the facility needed fencing.
4. Health & Safety: Fire extinguisher, first aid box, safety signage, and a fenced waste pit added.
5. Toilet facility: toilets were added to the facility
All work at the centre was concluded February 2019.
Old classroom at Thandanani Crèche.
As part of SEIS Thandanani Crèche will be receiving:
1. Additional building – Kitchen, office, pantry/storage facility
2. Repairs: Floor and roof repaired, and doors painted
3. Fencing - the facility needed fencing.
4. Health & Safety: Fire extinguisher, first aid box, safety signage, and a fenced waste pit added.
5. Toilet facility: toilets were added to the facility
All work at the centre was concluded February 2019.