View allAll Photos Tagged NewBuild

Bit of earth to build back up. Floor level will be 1' above the top block.

It was really good to have the original Wellpark Gates renovated and refitted.

'Bute Ironworks' did a great job.

new building nearly finished, looks like landscaping is being done now

New BAM/PFA building site tour, August 26, 2014. Photo: Peter Cavagnaro

The slab is broen where the footers are located for the support beams. They have been bolted in place. The hole will be cemented flush with the floor.

Original-Lehmziegel im Reichsmaß (Bezeichnung aus dem Kaiserreich). Diese Ziegel werden dringend für die Sanierung historischer Gebäude benötigt.

Cribb's Causeway, South Gloucestershire

Corner cabinets begin to take shape.

Newbuild. Damen Shoalbuster 3209 HARDINXVELD YN 571712, IMO 9688867, MMSI 244790875. Saturday 22nd November 2014. She had carried out a test sailing just 4 days prior to this photograph.

Excavating the solum for the lower lounge

Project name: Neonatal Intensive Care Unit

 

|| Location: Royal United Hospital, Bath

 

|| Description: The new Neo-Natal Intensive Care Unit at Bath's Royal United Hospital is an innovative project intended to be at the forefront of the development of neo-natal intensive care across the UK. The proposal consists of a single storey new-build extension and the refurbishment of the space occupied by the existing NICU facility. The new-build element accommodates the clinical, support and reception functions as a discreet but contemporary intervention between two existing buildings. The refurbished element comprises staff and parents’ facilities.

A pioneering holistic and therapeutic approach towards the new building will create a new low carbon unit allowing the staff to practice new methods of care for premature and sick babies.

 

|| Architect: Feilden Clegg Bradley Studios

|| Developer/Client: Royal United Hospital

|| Main Contractor: Vinci Construction Ltd

|| Project manager: Provelio Ltd

|| Quantity Surveyor: Edmond Shipway

|| Structural Engineer: Buro Happold

|| Mechanical & electrical engineer: Buro Happold

|| Project Value: £3 million

   

over a 112 cube of concrete went in all pumped. Thats about 20 lorry loads.

Old classroom at Thandanani Crèche.

 

As part of SEIS Thandanani Crèche will be receiving:

1. Additional building – Kitchen, office, pantry/storage facility

2. Repairs: Floor and roof repaired, and doors painted

3. Fencing - the facility needed fencing.

4. Health & Safety: Fire extinguisher, first aid box, safety signage, and a fenced waste pit added.

5. Toilet facility: toilets were added to the facility

 

All work at the centre was concluded February 2019.

 

Old classroom at Thandanani Crèche.

 

As part of SEIS Thandanani Crèche will be receiving:

1. Additional building – Kitchen, office, pantry/storage facility

2. Repairs: Floor and roof repaired, and doors painted

3. Fencing - the facility needed fencing.

4. Health & Safety: Fire extinguisher, first aid box, safety signage, and a fenced waste pit added.

5. Toilet facility: toilets were added to the facility

 

All work at the centre was concluded February 2019.

 

Twee zangeressen zongen weer een bekende song.

New BAM/PFA building site tour, August 26, 2014. Photo: Peter Cavagnaro

... and I am looking after their soil and rubble until they need it back.

Some of the newest parts I'm planning on using for another Steampunk build.

 

19/06/11

 

www.neilshy.com

New BAM/PFA building site tour, August 26, 2014. Photo: Peter Cavagnaro

looking down from the second floor mezzanine towards the front entrance

1 2 ••• 56 57 59 61 62 ••• 79 80