Manager Newbuilding Martijn Berends (l) en Managing Director Newbuilding & Brokerage Jari van Niejenhuis (r).
His Majesty the King of Spain Juan Carlos I and Her Majesty Queen Sofia officially inaugurated IESE's new Barcelona campus today. IESE has opened its new facilities, which cover an area of 30,000 square meters.
Carmet Tug Company's newbuild, Multirole Easyworker 2080 "CT Barnston", does some anchor handling and chain work at Woodside Ferry Terminal as the tide ebbs.
Local lads doing amazing work yet again!
The weather went from raining to cloudy to sunny and back to raining so on and so forth. Typical lol
You can see how much the tide drops during the series of photos. In such a short amount of time, the time drops dramatically and at such a speed as it usually does on high springs.
Hebridean Isles RORO ferry of CalMac being assisted back into the river after losing her steering twice whilst on sea trials in the background
Source of info: PDF from their website
CT Barnston multirole/multicat workboat
IMO: 9967938
MMSI: 232043206
Call Sign: MLZU5
Registered owner: CARMET TUG CO LTD
Vessel type: Easyworker 2080
Built: Groeneveldt Marine Construction B.V. 2022, Hendrik-Ido-Ambacht, Netherlands
Classification: Bureau Veritas, MCA Workboat Code Cat 2/60
Length: 20.08 meters
Beam: 8.00 meters
Draft: 1.60 meters
Gross tonnage: 70.60
Bollard pull: 15.0 tons
Speed: 9.0 knots
Main engines: 2 x Volvo Penta D 16 MH IMO 3
Total power: 1200 bhp
Gearboxes: Twin Disc MGX 516 DC
Propellers: 2 x 4 blade fixed pitch in nozzles @ 1350 mm
Generator sets: 1 x John Deere 135kVA and 1 x John Deere 65kVA
Electrical system: 24v DC and 220/415V connections
Fuel: 16,000 litres
Water: 7,000 litres
Deck crane: Fassi F800 RA (15,770kg @ 4.25m)
Deck winch: 18t SWL 8m/min
Tugger winch: 5t SWL, 9m/min
Deck capacity: 60 tonnes
The walls are up - timber framing, with the depth to be filled with slabs of compressed wool for insulation.
Construction work at Thandanani Crèche.
As part of SEIS Thandanani Crèche will be receiving:
1. Additional building – Kitchen, office, pantry/storage facility
2. Repairs: Floor and roof repaired, and doors painted
3. Fencing - the facility needed fencing.
4. Health & Safety: Fire extinguisher, first aid box, safety signage, and a fenced waste pit added.
5. Toilet facility: toilets were added to the facility
All work at the centre was concluded February 2019.
This photos show the 'bridge' which runs across on the 1st floor above the main entrance area outside the restaurant
It was taken from roughly the same place as this image: www.flickr.com/photos/mikehillman1983/7467128622/in/set-7...
This glue-lam and timber frame eco house sits on a hillside and enjoys panoramic views across the Allen Valley. The home takes the form of three pitched-roof structures organised as a horseshoe, crating a private walled garden in the centre.
The restaurant with clips in place for the underfloor heaing pipework - pipework yet to be laid before the concrete screed is poured.
Harry Zarek describing the lay of the land to the Compugen Executive Team.
Michael Charter, VP Software, Harry Zarek, President, David Austin, CFO, Andrew Stewart, VP Client Services
and what it looked like before (link to Facebook) www.facebook.com/greenerleith/posts/amazing-photo-of-what...
#twentyseven #greenwichhighroad #greenwich #newlondonarchitecture #architecture #newbuild #regeneration #homes #housing #london shared with pixbuf.com
This is the part of the new UCSD CSE building that faces the engineering mall. I'm not sure it's really the main entrance, though. The rooms in the part that looks like a tower are labs, and the areas to the left are faculty offices.
Swire Shipping has deployed its first 2,750TEU newbuild, MV Lae Chief, on its newly upgraded North Asia Express (NAX) service, November 2020
Photo credit: Swire Shipping
Ground floor - utilities and boiler room.
1st floor - formal guest room, day guest bathroom, kitchen and study.
2nd floor - master bedroom and two guest bedrooms with ensuite facilities
Construction worker at Thandanani Crèche.
As part of SEIS Thandanani Crèche will be receiving:
1. Additional building – Kitchen, office, pantry/storage facility
2. Repairs: Floor and roof repaired, and doors painted
3. Fencing - the facility needed fencing.
4. Health & Safety: Fire extinguisher, first aid box, safety signage, and a fenced waste pit added.
5. Toilet facility: toilets were added to the facility
All work at the centre was concluded February 2019.