View allAll Photos Tagged NewBuild

On Thursday, October 8, 2010, Dean of Business Steve Reinemund announced to the Schools' Board of Visitors that Michael A.J. Farrell and Mary Flynn Farrell told of their commitment to take the lead in support of the new Wake Forest University Schools of Business building. The Farrell's $10 million pledge is the largest cash commitment ever by living individuals to the University and the largest commitment to the Schools of Business to date.

newbuild at Thoma-Sea shipbuilding in Lockport,Louisiana

The light was great for a wander around the village this morning. Everything's better in the sunshine, and autumn's getting a good grip now.

 

iBri Photography • Facebook • Instagram • Twitter

(L to R) Jerry Eversole, Rhoda Goldberg, Mike Sullivan, and Rhea Brown Lawson.

We close the 35 Leroy Avenue building in two weeks. Thus begins the move to our new home...1441 Post Road. Mark January 10th on your calendars...that's our Grand Opening!

On Thursday, October 8, 2010, Dean of Business Steve Reinemund announced to the Schools' Board of Visitors that Michael A.J. Farrell and Mary Flynn Farrell told of their commitment to take the lead in support of the new Wake Forest University Schools of Business building. The Farrell's $10 million pledge is the largest cash commitment ever by living individuals to the University and the largest commitment to the Schools of Business to date.

East facing perspective

render is Havana 15.

New BAM/PFA building site tour, August 26, 2014. Photo: Peter Cavagnaro

Swire Shipping, in March 2020, announced the entry into service of its first 2400TEU newbuild vessel, MV Changsha.

 

Photo credit: Swire Shipping

BAM/PFA celebrated the mid-point of construction on its new downtown building with a public ceremony and block party on Addison Street on July 17, 2014. Over 500 people attended to show their support by signing one the last steel beams to be put in place. Photo: Peter Cavagnaro

Photo of the New Build at the Robert Gordon University Campus in Garthdee taken 4th Dec 2011.

 

www4.rgu.ac.uk/campusdev/masterplan/

www.mocacleveland.org/newbuilding.php

 

Currently under construction, MOCA's new building will be located at the intersection of Euclid Avenue and Mayfield Road. The new MOCA is a flagship project of Cleveland’s emerging Uptown district, a major urban-revitalization project undertaken by Case Western Reserve University; developer MRN, Ltd.; and other institutions in the University Circle neighborhood. The Museum will serve as a catalyst for creativity and growth in the area—which is home to one of the country’s largest concentrations of cultural, educational, and medical institutions—with greatly expanded educational and public programs, as well as imaginative collaborations with neighboring organizations and cultural partners.

Designed by the internationally acclaimed firm Foreign Office Architects (FOA), London. The nearly 34,000-square-foot, four-story structure is FOA’s first major building in the United States, and its first museum.

The Church of Ireland Centre, Newbuildings, Co Derry

 

Part of the Church of Ireland (Anglican) Diocese of Derry and Raphoe, belonging to the Glendermott and Newbuildings grouping.

Images of the Georgetown Building at Education City

Check Out Justin Smith Architects New Office In West Bridgford. A Fantastic Company Who We Have Been Working With Recently ‪#‎Nottingham‬ ‪#‎Derby‬ ‪#‎WestBridgford‬ ‪#‎NewBuild‬ ‪#‎Plans‬ ‪#‎Architect‬ ‪#‎Drawing‬

Newbuildings flute band

Project name: Lawn House

 

|| Location: Burbage, Leicestershire

 

|| Description: A Code Level 6 ecohouse in Burbage, Leicestershire. Lawn House is the first private development in the UK to be built using prefabricated brick and block cavity walls and features a range of cutting edge sustainable heating and energy solutions.

 

|| Architect: Penny Shankar

|| Main Contractor: Irvine Whitlock

|| Project manager: Fred Badowski

|| Sub contractor(s): Hanson

   

Wokingham Scenes New build on what was the Towns Cricket Pitch and Tenis Courts

Manager Newbuilding Martijn Berends (l) en Managing Director Newbuilding & Brokerage Jari van Niejenhuis (r).

The blue section is Sandy's office, while the red wall will be the back of the Circ Desk.

His Majesty the King of Spain Juan Carlos I and Her Majesty Queen Sofia officially inaugurated IESE's new Barcelona campus today. IESE has opened its new facilities, which cover an area of 30,000 square meters.

Images of the Georgetown Building at Education City

Images of the Georgetown Building at Education City

Carmet Tug Company's newbuild, Multirole Easyworker 2080 "CT Barnston", does some anchor handling and chain work at Woodside Ferry Terminal as the tide ebbs.

 

Local lads doing amazing work yet again!

 

carmettugs.co.uk/

 

The weather went from raining to cloudy to sunny and back to raining so on and so forth. Typical lol

 

You can see how much the tide drops during the series of photos. In such a short amount of time, the time drops dramatically and at such a speed as it usually does on high springs.

 

Hebridean Isles RORO ferry of CalMac being assisted back into the river after losing her steering twice whilst on sea trials in the background

 

Source of info: PDF from their website

 

CT Barnston multirole/multicat workboat

 

IMO: 9967938

 

MMSI: 232043206

 

Call Sign: MLZU5

 

Registered owner: CARMET TUG CO LTD

 

Vessel type: Easyworker 2080

 

Built: Groeneveldt Marine Construction B.V. 2022, Hendrik-Ido-Ambacht, Netherlands

 

Classification: Bureau Veritas, MCA Workboat Code Cat 2/60

 

Length: 20.08 meters

 

Beam: 8.00 meters

 

Draft: 1.60 meters

 

Gross tonnage: 70.60

 

Bollard pull: 15.0 tons

 

Speed: 9.0 knots

 

Main engines: 2 x Volvo Penta D 16 MH IMO 3

 

Total power: 1200 bhp

 

Gearboxes: Twin Disc MGX 516 DC

 

Propellers: 2 x 4 blade fixed pitch in nozzles @ 1350 mm

 

Generator sets: 1 x John Deere 135kVA and 1 x John Deere 65kVA

 

Electrical system: 24v DC and 220/415V connections

 

Fuel: 16,000 litres

 

Water: 7,000 litres

 

Deck crane: Fassi F800 RA (15,770kg @ 4.25m)

 

Deck winch: 18t SWL 8m/min

 

Tugger winch: 5t SWL, 9m/min

 

Deck capacity: 60 tonnes

1 2 ••• 36 37 39 41 42 ••• 79 80