View allAll Photos Tagged Layout,
My final DT reveal for Creative Scrappers, using sketch #213.
erinblegen.blogspot.com/2012/06/my-final-creative-scrappe...
The layout is far from finished. But today 9/26/2008 I decided to work on the the Scenic Ridge Layout. I made the foundations & sidewalks for the buildings and painted the street to simulate an asphalt paved road. It has been awhile since I've worked on this layout. And there will be more to come. I am going to finish it. No matter how long it takes. Cause that is the fun in building a layout.
The layout is far from finished. But today 9/26/2008 I decided to work on the the Scenic Ridge Layout. I made the foundations & sidewalks for the buildings and painted the street to simulate an asphalt paved road. It has been awhile since I've worked on this layout. And there will be more to come. I am going to finish it. No matter how long it takes. Cause that is the fun in building a layout. ( Update - This layout is not around any more. It is now gone in other words it is now in some landfill. Garbage
A layout for a client. Her son plays hockey and we are doing a book showcasing his hockey memories.
The title was designed and cut by me. See profile for shop info.
sou bem novo aqui no flickr , então esse é meu primeirissimo layout , eu fiz em tons roxo porque amo essa cor , e Pll é uma das minha serie preferida então comentem *,*
Possible Layout for my Charm Pack quilt along, I am not totally sold yet. Did you see my Abby cat trying to sneak in the shot?
Como definido em reunião dos graffiteiros no dia 12 de fevereiro (Mercado das Borboletas) o grupo formado por Denis Leroy, Sergin Anjo, Rey, Warley Bombi fizeram juntos o layout do fundo para o painel do evento do fim de semana. (Parabéns galera ficou fino!).
Fica aqui nossa indicativa, cheguem ao local as 8h (teremos café da manhã aos participantes). Quem ainda não confirmou cadastro fique atento e confirme logo!
Informações: intervencaograffiti.blogspot.com/
BoogieBoardArray2-for-web
Took these shots at Kewalo's break. This guy was pretty fun to watch.
Converted with UFRaw. Laid out and processed with GIMP 2.6.6 and G'MIC toolbox.
This layout was wedged into a bedroom along with my bed. It set 18" off the floor so as not to block the window. The control panel was built from an old cabinet door. Buildings are mostly Plasticville, probably from even earlier layouts. Design is from a Kalmbach layouts book. Note the dancing ballerinas on the station roof.
Estudo de layout para o site - Criei todos os leyouts do novo site da marca de surf curitibana Shortnes Surfwear - www.shortnes.com.br - vai pro ar ano que vem
Kanawha Valley Railroad Assn. HO layout in the front room. 1950s Charleston WV. I want to ride my bicycle!
Novo layout para empresa de churrasqueiras X-Grill do grupo Metaluppi, feito para a empresa Sites MÃdia.