View allAll Photos Tagged BuildingConstruction

June 20, 2021 - The construction cranes are for The Peninsula which is being developed by the Columbus Downtown Development Corporation. For more information on the project: ttps://www.columbusddc.com/scioto-peninsula/

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

Mechanical installations inside the UMass Boston ISC – December 2012

Construction crews continue buttoning up the exterior of UMass Boston’s Integrated Sciences Complex. Inside, the mechanical, electrical and plumbing systems are coming together.

This is the official project sign for the Integrated Sciences (ISC) complex on the UMass Boston campus.

This photo displays the new electrical switchgear control panels inside the recently constructted building at the UMass Boston.

Mechanical installations inside the UMass Boston ISC – December 2012

Construction crews continue buttoning up the exterior of UMass Boston’s Integrated Sciences Complex. Inside, the mechanical, electrical and plumbing systems are coming together.

 

I had been mocking the tree for its unshapeliness for months before I finally got around to taking a picture of it.

 

-----------------------

 

In Grand Rapids, Michigan, on September 30th, 2017, on the west side of Stocking Avenue Northwest, north of Bridge Street Northwest.

 

-----------------------

 

Getty Thesaurus of Geographic Names terms:

• Grand Rapids (7014126)

• Kent (county) (1002540)

 

Art & Architecture Thesaurus terms:

• construction sites (300312090)

• sidewalks (300003893)

• streetscapes (300249570)

• trees (300132410)

• urban landscapes (300132447)

 

Wikidata items:

• ornamental tree (Q33249028)

• September 30 (Q2881)

• September 2017 (Q23994855)

 

Library of Congress Subject Headings:

• Trees in cities (sh85137261)

My temp assignment just finished this week. I worked in the building to the right, but only on the 4th floor, so I didn't have the spectacular view I had from the assignment I had in May, down by LACMA.

Source: livinghistories.newcastle.edu.au/nodes/view/49376

 

This image was scanned from a photograph in the University's historical photographic collection held by Cultural Collections at the University of Newcastle, NSW, Australia.

 

If you have any information about this photograph, or would like a higher resolution copy, please contact us.

  

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

Hier das Bohrgerät ATLAS XI von Franki bei einem Haubauprojekt in Berlin.

 

Ein Video mit dem Bohrgerät auf mein YouTube Kanal: youtu.be/GslnpBaoJt0

-------------------------------------------------------------------------------

 

Here, the Rotary drilling rig ATLAS XI from Franki at a house construction site in Berlin.

 

A Video with this rotary drilling rig on my YouTube Channel: youtu.be/GslnpBaoJt0

Indianapolis Colts new home, Lucas Oil Stadium. It is also the site for Super Bowl 46, on February 5, 2012. Not ready for football yet.

Before taking this shot, I found this couple are at odd.

 

You can see from their body language here.

 

About the weather, It also begin to rain. In fact is part sun shine & part raining.

 

You can see the pantoon near the ferry is wet.

Stockholm, Sweden - October, 23th, 2016. Stockholm Tunnelbana Subway interior with escalator and modern art exhibition. Paintings and artworks at Kungstradgarden metro station.

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

Mechanical installations inside the UMass Boston ISC – December 2012

Construction crews continue buttoning up the exterior of UMass Boston’s Integrated Sciences Complex. Inside, the mechanical, electrical and plumbing systems are coming together.

 

The new electrical switchgear equipment

moves through the doorway into the new building on the UMass Boston campus.

 

the Otsego County Courthouse in Cooperstown, New York, designed by architect Archimedes Russell (1840-1915); completed in 1880, the architectural style is Victorian Gothic combining the used of brick and stone

Mechanical installations inside the UMass Boston ISC – December 2012

Construction crews continue buttoning up the exterior of UMass Boston’s Integrated Sciences Complex. Inside, the mechanical, electrical and plumbing systems are coming together.

 

April 28, 2022 - Eye Film Museum designed by Delugan Meissl Associated Architects opened in 2011. "EYE Film Institute Netherlands is situated on a prime location at the bend of the river IJ, opposite the historical part of the city and the Central Station. The building is conceived as a highly tense and dynamic geometric solid.

 

The light is reflected in multiple ways by smooth, crystalline surfaces, thus subjecting the building’s appearance to permanent optical changes during the course of the day. Movement and light manifest themselves clearly as essential parameters for the film as a medium in the architectural production. The entrance into the building is characterised by continuous spatial concentration and directed visual relations. Spatial development, light incidence, and materiality define the path that leads from the southern glass front and the museum shop into the heart of the building.

 

The room widens successively, before unfolding its full dimensions as an architectural and functional focus. The interior’s architectural formulation defines the foyer and arena as central divisors which integrate all path relations into the overall functional concept.

Whereas on the south side the building’s shell opens fully onto the adjacent river, terrace-like steps extrapolate the partly allocated, partly alterable functional zones as well as the interior’s character and atmosphere, by allowing access to the exhibition level, to the projection rooms and restaurant. Flowing transitions between the single functional areas underline the distinctive continuity and the dynamic of the room flow, thus transforming the usage into a physiologically tangible sequence of constantly changing spatial impressions.

 

Movement and light generate standpoint-dependent, variegated atmospheric connections which oscillate between extrovert landscape reference and introverted spatial concentration. Accompanied by these variable perceptions, the perambulation of the building resembles a movie sequence with changeable visual effects." Text from the following website: www.dmaa.at/work/eye-film-institute

Canary Wharf under construction.

Mechanical installations inside the UMass Boston ISC – December 2012

Construction crews continue buttoning up the exterior of UMass Boston’s Integrated Sciences Complex. Inside, the mechanical, electrical and plumbing systems are coming together.

 

01 Mar 1973, Haiphong, Vietnam --- A Vietnamese family between a field of debris of war-destroyed houses in Haiphong in North Vietnam, photographed in March 1973. The man works on the provisional reconstruction of the house. The United States of America flew about 2,000 air attacks on cities and targets in North Vietnam during the "Christmas bombings" in 1972. The peace agreement was signed on the 27th of January in 1973 in Paris. Photo: Werner Schulze --- Image by © Werner Schulze/dpa/Corbis

Red construction crane on a site near Toorak and St Kilda Roads intersection, Melbourne, Australia.

Travaux de renouvellement du site propre du trolley à Nancy dans le cadre des aménagements pour la ligne 1 du trolley.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Ouest

Adresse : avenue du XXᵉ Corps

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Interior of new library as it was being fitted out. The library opened 22nd May 1994

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Despite winter storms, construction work marches on at the University of Massachusetts Boston campus. Crews continue to work on the roof, the framing, conduit, ductwork and piping in the Integrated Science Complex. The mock Senate chambers begin to take shape at the Edward M. Kennedy Institute.

 

The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.

Interior of new library as it was being fitted out. The library opened 22nd May 1994

 

Staff tea room

1 2 ••• 17 18 20 22 23 ••• 79 80