The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.
Mechanical installations inside the UMass Boston ISC – December 2012
Construction crews continue buttoning up the exterior of UMass Boston’s Integrated Sciences Complex. Inside, the mechanical, electrical and plumbing systems are coming together.
Mechanical installations inside the UMass Boston ISC – December 2012
Construction crews continue buttoning up the exterior of UMass Boston’s Integrated Sciences Complex. Inside, the mechanical, electrical and plumbing systems are coming together.
Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.
February 14, 2021 - "The Peninsula in Downtown Columbus. Something that started as a dream. Grew into an idea. And is soon to become Columbus, Ohio’s next great neighborhood.
Already on its way to becoming a lush, urban oasis, The Peninsula will have something for everyone: miles of waterfront views and pathways, acres and acres of parks and community greenspaces, conveniently connected bike trails, easy access to Scioto River canoeing and kayaking, and close proximity to Downtown’s most popular places, happenings, and events. Phase One is also bringing thoroughly modern office spaces, a premier hotel, resort-style residential living, and exceptional shopping and dining experiences.
The Peninsula is more than a place. It’s a walkable, bikeable community. It’s a unique live-work-play lifestyle centered around culture, rooted in common interests, and infused with creativity. It’s a neighborhood that brings together the best of all worlds – just around the bend of the Scioto River. "
Previous text from the following website:
Mechanical installations inside the UMass Boston ISC – December 2012
Construction crews continue buttoning up the exterior of UMass Boston’s Integrated Sciences Complex. Inside, the mechanical, electrical and plumbing systems are coming together.
01 Mar 1973, Haiphong, Vietnam --- A Vietnamese family in the middle of war-destroyed buildings in the harbour city Haiphong in North Vietnam, photographed in March 1973. The United States of America flew about 2,000 air attacks on cities and targets in North Vietnam during the "Christmas bombings" in 1972. The peace agreement was signed on the 27th of January in 1973 in Paris. Photo: Werner Schulze --- Image by © Werner Schulze/dpa/Corbis
Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.
20 Sep 1932, Manhattan, New York City, New York State, USA --- Construction workers eat their lunches atop a steel beam 800 feet above ground, at the building site of the RCA Building in Rockefeller Center. --- Image by © Bettmann/CORBIS
Mechanical installations inside the UMass Boston ISC – December 2012
Construction crews continue buttoning up the exterior of UMass Boston’s Integrated Sciences Complex. Inside, the mechanical, electrical and plumbing systems are coming together.
The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.
The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.
20 Sep 1932, Manhattan, New York City, New York State, USA --- Construction workers eat their lunches atop a steel beam 800 feet above ground, at the building site of the RCA Building in Rockefeller Center. --- Image by © Bettmann/CORBIS
01 Mar 1973, Hanoi, Vietnam --- A young Vietnamese laughs into the camera between the steel girders of the Long Bien bridge, which spans the Red River in Hanoi with a length of 1,683 metres. Workers start to reconstruct it, photographed in March 1973. The railway bridge of strategic importance from the beginning of the 20th century was destroyed several times in US air raids during Vietnam War. The United States of America flew about 2,000 air attacks on cities and targets in North Vietnam during the "Christmas bombings" in 1972. The peace agreement was signed on the 27th of January in 1973 in Paris. Photo: Werner Schulze --- Image by © Werner Schulze/dpa/Corbis
Stockholm, Sweden - October, 23th, 2016. Radhuset metro station, situated at blue metro line, uses organic architecture which leaves the bedrock exposed. Stockholm Tunnelbana Subway interior.
A bit of what I do for a living. The modern building behind the former bank, that is. A mixed retail and residential development consisting of 3, 4 and 5 storey blocks of 119 number "affordable" apartments over a retail unit and basement car park. This is a reinforced concrete and timber framed structure on piled foundations. The scheme was complicated by a large underground culvert running below the site and the whole thing replacing a former bowling alley - sorry Mike!
Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.
Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.
The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.
April 29, 2022 - Eye Film Museum designed by Delugan Meissl Associated Architects opened in 2011. "EYE Film Institute Netherlands is situated on a prime location at the bend of the river IJ, opposite the historical part of the city and the Central Station. The building is conceived as a highly tense and dynamic geometric solid.
The light is reflected in multiple ways by smooth, crystalline surfaces, thus subjecting the building’s appearance to permanent optical changes during the course of the day. Movement and light manifest themselves clearly as essential parameters for the film as a medium in the architectural production. The entrance into the building is characterised by continuous spatial concentration and directed visual relations. Spatial development, light incidence, and materiality define the path that leads from the southern glass front and the museum shop into the heart of the building.
The room widens successively, before unfolding its full dimensions as an architectural and functional focus. The interior’s architectural formulation defines the foyer and arena as central divisors which integrate all path relations into the overall functional concept.
Whereas on the south side the building’s shell opens fully onto the adjacent river, terrace-like steps extrapolate the partly allocated, partly alterable functional zones as well as the interior’s character and atmosphere, by allowing access to the exhibition level, to the projection rooms and restaurant. Flowing transitions between the single functional areas underline the distinctive continuity and the dynamic of the room flow, thus transforming the usage into a physiologically tangible sequence of constantly changing spatial impressions.
Movement and light generate standpoint-dependent, variegated atmospheric connections which oscillate between extrovert landscape reference and introverted spatial concentration. Accompanied by these variable perceptions, the perambulation of the building resembles a movie sequence with changeable visual effects." Text from the following website: www.dmaa.at/work/eye-film-institute
Is 1st thing in the morning, these transit buses between terminal & Planes are parked.
I can recalled that during the 80's, the airport is rather old. So do the Buses as well.
The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.
The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.
June 11, 2022 - I am taking part in the Columbus Creative Photography Group Meetup today. We met at the North Market and walked over to the Columbus Arts Festival which is occurring this weekend along the Scioto River. Columbus, Ohio
June 11, 2022 - I am taking part in the Columbus Creative Photography Group Meetup today. We met at the North Market and walked over to the Columbus Arts Festival which is occurring this weekend along the Scioto River. Columbus, Ohio
Construction marches on at UMass Boston campus – February 2013
Despite winter storms, construction work marches on at the University of Massachusetts Boston campus. Crews continue to work on the roof, the framing, conduit, ductwork and piping in the Integrated Science Complex. The mock Senate chambers begin to take shape at the Edward M. Kennedy Institute.
Mechanical installations inside the UMass Boston ISC – December 2012
Construction crews continue buttoning up the exterior of UMass Boston’s Integrated Sciences Complex. Inside, the mechanical, electrical and plumbing systems are coming together.
Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.
Structural building information modeling services complete pre-construction model of the building.
Hire BIM expert at $12/hr only.
Visit us at: www.cadserviceslondon.com/structure-bim-services.php
Kindly send us your queries at: info@cadserviceslondon.com
The concrete slabs are being poured on both wings of the Integrated Sciences Complex. They are six and a quarter inch thick. Concrete placements will continue, and preparations for drywall and fireproofing are under way.
The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.
In Lansing Charter Township, Michigan, on March 18th, 2017, a "Homewood Suites by Hilton" hotel under construction, as viewed from the west side of Towne Centre Boulevard, north of Showtime Drive.
-----------------------
Getty Thesaurus of Geographic Names terms:
• Ingham (county) (1002502)
Art & Architecture Thesaurus terms:
• building paper (300014150)
• construction (assembling) (300054608)
• fog (300055374)
• hotels (public accommodations) (300007166)
• snow (precipitation) (300055381)
• urban landscapes (300132447)
• vacant lots (300122264)
• winter (300133101)
• yellow (color) (300127794)
Wikidata items:
• Homewood Suites by Hilton (Q5890701)
• Lansing – East Lansing metropolitan area (Q6487493)
• Lansing Township (Q6029779)
• March 18 (Q2422)
• March 2017 (Q23994849)
Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.
Crews continue to do ground improvement work to reinforce the soil under future utility, sidewalk and other hardscape areas at the Integrated Sciences Complex. Concrete pile caps are being installed in the service and supply tunnel construction area and other reinforcing steel and concrete work continues on the ISC foundation.
Finishing the roof at at the site of the old Charles Street Jail, being converted into a hotel and conference center.