View allAll Photos Tagged Bridges_and_Tunnel
Quantity surveying is of paramount importance to deliver the efficiency of projects. Reinforce quantity surveyors and training Pvt. Ltd has trained and placed more than 10000 students. Reinforce quantity surveyors and training is providing 100% live project training to civil engineers in India as well as abroad. We offered professional certification courses on Quantity surveying, Billing engineering, Planning engineering with Primavera P6 and MSP. Quantity surveying and billing engineering are best options for students to choose as a fresher to get the practical knowledge of structural and architectural drawings. Quantity surveying includes the preparation of Bar Bending Schedule (BBS) on Excel, Drawing take off, knowledge of work order procedures. Quantity surveying course of Level 1 consists of full estimation of buildings and roads course in Delhi, Mumbai and Bangalore. Reinforce QST. is one of the Best institute for quantity surveying in India providing live project training to civil engineers on Quantity surveying and billing engineering. Construction Industry is one of the booming industries in the world since 1980s. Under the construction industry, there are so many types of professional and non professional workers are working as, Architectures, Quantity Surveyors, Project Managers, Accountant, Technical Officers, Supervisors and Labours etc. There is a large requirement of Quantity surveyors in gulf countries reinforce quantity surveyors is preparing the students as per the industry demands to avail job in MNC’s easily in India as well as abroad . The track placement record of Reinforce Quantity surveying as made it. Top rated institute in India
Visit us- www.reinforceqst.com/
Plot 3A, Ground Floor, Westend Marg, Saiyad ul Ajaib, Near Saket Metro Station Gate 2, New Delhi 110030
Email: reinforcequantity1021@gmail.com Phone: +91- 9810832621
#Billing #Engineering #Billing_engineering #Project_planning #Reinforce #Quantity #surveyors #Surveying #Civil_engineers Project_planning_management #Buildings #Estimation #Estimation_of_roads #Bridges_and_Tunnel #Quantity_Surveyors
You tube- www.youtube.com/watch?v=zUSy1NaygKE&t=7s
Face book- www.facebook.com/reinforceqst
Twitter- twitter.com/reinforce_qstpl
LinkedIn- www.linkedin.com/in/reinforce-qst-private-limted-company-...
Views from the Chesapeake Bay Bridge and Tunnel during the remnants of Tropical Storm Karen. (October 2013)
The Senses- Sight
One of the most interesting elements in photograpy is different perspective. This long tunnel located in Central Park pulls the viewer in, making them want to see what's at the other end. May pictures are interesting to look at but this image makes the viewer want to see more, which makes it fitting in the Sight category.
Amy Quinton
BCIT Broadcast Online Journalism Student
Diaries of Gerard "G.I." Sawyer from April 1968 - "G.I." Sawyer,designed many of Washington's landmark bridges and tunnels as the District's chief bridge engineer, including the Dupont Circle tunnel and the never-built three-sisters bridge.
2018 marks 50 years since Washington, D.C., and many other urban areas around the nation exploded in civil disturbances in the wake of the assassination of the Reverend Dr. Martin Luther King, Jr. But as noted at the 2017 D.C. History Conference, D.C. in 1968 was about much more than the civil disturbances.
The workshop serves as an introduction to resources relating to many aspects of life in Washington, D.C. in 1968, including local activist movements, experiments in community-advised policing, and developments in art and architecture.
Time's Up Environmental Organization and Visual Resistance helped start memorializing with stencils and ghost bikes. This, in turn, put pressure on the city to redesign a lot of the streets, especially around bridges and tunnels which were especially dangerous. This campaign spread nationally.
Views from the Chesapeake Bay Bridge and Tunnel during the remnants of Tropical Storm Karen. (October 2013)
Time's Up Environmental Organization helped start memorializing with stencils and ghost bikes. This, in turn, put pressure on the city to redesign a lot of the streets, especially around bridges and tunnels which were especially dangerous. This campaign spread nationally.
The journey on the Konkan railway, with its bridges and tunnels, is as fantastic as the places the train goes to – Goa, Mangalore and Kerala.
Time's Up Environmental Organization and Visual Resistance helped start memorializing with stencils and ghost bikes. This, in turn, put pressure on the city to redesign a lot of the streets, especially around bridges and tunnels which were especially dangerous. This campaign spread nationally.