View allAll Photos Tagged AdultLearning

Ladder to the roof - new rooflights are being fitted.

Steel framework for the library extension has been erected (new staff workroom at the back)

Two new rooms created on the 1st floor for the new toilets.

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

Shelving underway but lots more boxes to unpack!

Photo: Susan Allen/ Stockton University

The walls of the extension are going up around the steel frame in the courtyard. This is the curved wall of the cafe room.

Looking from the stairs down to the break-out area on the 1st floor; partition built and awaiting glazing

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

Lovely view from the window next to the lift

Photo: Susan Allen/ Stockton University

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

View down the stairs to the main reception.

Pre-construction Phase: first floor. This adult learning room will be converted into toilets for people using the building, to replace those currently located on the ground floor.

Here you can see that most of the furniture has been removed, the condition of the floor is being investigated and holes have been made in the plaster to test for asbestos.

New roof lights vastly improve the quality of light in the studio.

New carpet laid in the office on the top floor

Handrail installed along the new ramp to the fire exit.

Teenage area and the window where our competition winners' photographs will become graphical designs

1 2 ••• 33 34 36 38 39 ••• 49 50