View allAll Photos Tagged Add
In some cases I would be inclined to remove the person from the background, but in this case I thought it added to the story. A caption is perhaps "Time to run, I've been spotted." Anyway, here it is.
Belgium.
National Botanic Garden in Meise (Brussels)
Please no invites to mandatory comment/award groups unless requested by me
To admins of of those groups: I will just click OK add it if you take no notice and invite me anyway.
my most interesting on black: www.fluidr.com/photos/lindadevolder/interesting
This picture appears in the gallery Things I found on Flickr that I like (22)
[New release - [ADD] Azalea Set
Exclusive for this r ound of Cosmopolitan Event (December 07 / 2025)DD] Azalea Set
There base colours have dried overnight, now it is time for add a bit of detail. I want to keep this to a minimum though, especially on the parts that have been re-imagined with little physical evidence. This includes most of the lower front wall, the building was redeveloped in the 1920s as a car salesroom.
~Little Foxy B.~ Kwan Skin (Blogger Pack)
۩ The shape was designed by me for my next shape sales I present to you my first created Evo X model.
i havnt been in a photographing mood since uni...just the doll stuff. i moved house a few weeks ago and its just super inspiring this old piano is in my own living room....prepare to see more from my house of awesomness!
Another characteristic Buda building previously the HQ of the Hungarian Postal Service built on the clasp of the XIX and XX century. Shot from a moving car.
#building #architecture #hungary #travelphotography #streetphotography #outofthephone
A commercial forest seen through the ‘eyes’ of a 3D laser scanning system developed by the ESA-supported Treemetrics company.
The trees of planet Earth – recently estimated to number three trillion in total – are both environmental and economic resources, and require careful stewardship.
“We estimate 20% of global forest resources are currently going to waste as they are harvested,” explains Enda Keene, CEO of Irish company Treemetrics.
“What Treemetrics aims to deliver is more wood from fewer trees, through a complete end-to-end forest management system. It combines forest mapping, assessment and valuing with decision-making tools for harvest planning as well as real-time monitoring of the cutting and collecting process.”
Treemetrics developed a project in collaboration with ESA’s Advanced Research in Telecommunications Systems (ARTES) programme’s Integrated Applications Promotion to integrate satellite communications into its system, enabling managers to monitor their equipment and track harvesting as it happens, even from remote forest locations.
The company can perform forest mapping through aerial and drone photography and ‘laser radar’ lidar, as well as satellite Earth observation – using missions including ESA’s Sentinel-1 and Sentinel-2.
These maps are given a third dimension through ‘ground truthing’. Laser scanners perform a 360-degree survey at regular intervals to measure the straightness and health of trees – accurately estimating their quality as logs in advance of them being logged.
Mr Keene adds: “We are very grateful for the great technical, financial and business planning support we received through ESA’s IAP, which enabled the creation of a world class product for the global forest industry.”
The company’s customers to date include state forest agencies in 26 countries, as well as private forest owners and government agencies.
Credit: Treemetrics
57601 has got a few cameras clicking as it stands at York one end of the 1Z27 0702 Grimsby - Edinburgh charter with 57314 0n the rear .
10 11 18
Well, not really a sunset. The sun has been added to the image with the help of Photoshop's artificial intelligence. The ship and the waves are real. The photo was taken on the beach at Yport, a popular holiday destination on France's Channel coast. It was around midday, but dense high fog created a rather dim, diffuse lighting.
Here is a link to the photo without additions:
www.flickr.com/gp/bernd_thaller/6s0449Z75x
I'm not sure I want to make changes like this more often. In any case, it no longer corresponds to my own memory of this scene. But I'm still impressed with how Photoshop rendered the sun along with atmospheric effects and waves on the horizon.
Re-edited to add more depth to the image and remove the border.
Red deer stag against the rising sun. I love how he seems to be materialising out of the morning mist.
This image was featured on BBC Autumnwatch, and was picked out as the favourite.
Do you know how to add stars to an empty night sky in Photoshop? Do you have a full sized Milky Way image to use in such cases? On my blog I've created a quick tutorial with step-by-step instructions on adding stars to skies and I've included a free, full-sized Milky Way photo for you to use
www.throughstrangelenses.com/2013/06/11/tutorial-adding-s...
Adding traction by farrier’s assistant—Drill-Tech is a combination of a filler material, usually brass, and very hard metal (drill tech is made of crushed up metal drills) that when heated along with the shoe, permanently bonds. This, combined with the weight of horse and rider, provides a non-slip surface on hard uniform surfaces such as limestone, concrete or pavement.
just to say hello and i'm sorry for my absence, one upload a week is utter crap but at the moment time isn't on my side, hate to upload before catching up, anyways wishing you all a happy Thursday ..♥....
Lorde~ Yellow Flicker Beat (from The Hunger Games)
tiny drops glisten-
across a gossamer web.......
vanish with the sun
WiP this may change as i think on it
ANSH scavenger17
Take a nature shot and write a haiku to go with it.
Hi Everyone,
I'm Esther'90: www.flickr.com/photos/30495723@N02/ , I had to start a new account. So you can follow me here from now, I'll upload new and old pictures as well.
Website: www.esztervaly.format.com/
Instagram: www.instagram.com/valyesz/
Facebook: www.facebook.com/esztervaly
Behance:https://www.behance.net/valyeszter
Tumblr: esztervaly.tumblr.com/New Tumblr: esztervaly.tumblr.com/
The 25 de Abril Bridge is a suspension bridge connecting the city of Lisbon, capital of Portugal, to the municipality of Almada on the left (south) bank of the Tagus river. It has a total length of 2,277 metres, making it the 46th longest suspension bridge in the world.
From its inauguration in 6 August 1966 up to 1974, the bridge was named Salazar Bridge (Ponte Salazar), after Portuguese Prime Minister António de Oliveira Salazar, who ordered its construction. After the Carnation Revolution, which overthrew the remnants of Salazar's regime, the bridge was renamed for April 25, the date of the revolution. It is also commonly called the Tagus River Bridge.
Later changes had to be made due to the rapid increase in population. In the 1990s, a fifth car lane was added, and in 1999, a lower deck, used as a railway track, which was planned since the beginning, was finally built. Today, the upper deck carries six car lanes while the lower deck carries a double track railway, electrified at 25 kV AC.
From the late 19th century, there had been proposals to build a bridge across the Tagus. In 1929, the idea advanced when the Portuguese engineer and entrepreneur, António Bello, requested a government concession for a railway crossing between Lisbon and Montijo (where the Vasco da Gama Bridge, the second bridge serving Lisbon, was later built in 1998). As a result, the Minister of Public Works, Duarte Pacheco, created a commission in 1933 to analyse the request. The commission reported in 1934, and proposed building a road and rail bridge. Bids were obtained, but the proposal was subsequently put aside in favor of a bridge crossing the river at Vila Franca de Xira, 35 kilometres north of Lisbon.
In 1953, a new government commission started work and, in 1958, recommended building the bridge, choosing the southern anchor point adjacent to the recently built monument to Christ the King (Cristo-Rei). In 1959, the international invitation to tender for the project received four bids. In 1960, the winner was announced as a consortium headed by the United States Steel Export Company, which had also submitted a bid in 1935. The American School of Lisbon was founded largely to educate the children of the American engineers brought to Portugal to work on the construction of the bridge.
Construction began on 5 November 1962. Forty-five months later, six months ahead of schedule, the bridge was inaugurated on 6 August 1966. Presiding at the ceremony was the President of Portugal, Admiral Américo Thomaz. Also present were the Prime-Minister, António de Oliveira Salazar, and the Patriarch of Lisbon, Cardinal Manuel Gonçalves Cerejeira. The bridge was named Salazar Bridge (Ponte Salazar), after Prime Minister Salazar.
United States Steel International Inc., based in New York, was prime contractor for the bridge. Morrison-Knudsen of Portugal Ltd., an American firm based in Boise, Idaho, was U.S. Steel's principal associate. Morrison-Knudsen had previously worked on the San Francisco Bay Bridge. The bridge was designed by Steinman, Boynton, Gronquist and London of New York, and Tudor Engineering Company of San Francisco. The steel was imported from the US. Four workers lost their lives, out of a total of 3,000 who worked on the site. Construction took a total of 2,185,000 man-hours of work. The total cost of the bridge came to 2.2 billion Portuguese escudos, or US$32 million (US$225 million in 2011 adjusted for inflation).
Soon after the Carnation Revolution in 1974, the bridge was renamed the 25 de Abril Bridge, the day the revolution had occurred. A symbol of those times was captured on film, with citizens removing the large brass letters spelling "Salazar" from one of the main pillars of the bridge and painting a provisional "25 de Abril" in its place.
The upper platform, running 70 m above water, had four car lanes, two in each direction, with a dividing guardrail. On 23 July 1990, the guardrail was removed and a fifth, reversible lane was created. On 6 November 1998, the side walls were extended and reinforced to make space for the present six lanes. Cars crossing the bridge make a peculiar hum because the two inner lanes are made of metallic grating rather than asphalt to minimize aerodynamic forces by means of pressure equalization.
Since 30 June 1999, the lower platform has carried a double track railway. To accommodate that, the bridge underwent extensive structural reinforcements, including a second set of main cables, placed above the original set, and the main towers were increased in height. The railway had been part of the initial design, but was eliminated for economy, so the initial structure was lightened. The original builder American Bridge Company was called again for the job, performing the first aerial spinning of additional main cables on a loaded, fully operational suspension bridge.
Traffic soon increased well beyond predictions, and has remained at maximum capacity despite the enlargement from four to six lanes, the addition of the railway, and the building of a second bridge serving Lisbon, the Vasco da Gama Bridge. A third bridge has been on and off government plans for some time, but the idea has been dropped presently, due to Portugal's budget constraints.