Work continues in High Street Randwick.on the terminal stop for the Randwick Branch of the line.

 

Only short lengths of track remain to be laid, the platform canopy is well under way as are the electrics and a full complement of spanpoles now line the street.

100% isn't a bad score!

 

By my reckoning teams from Sydney Light Rail have now completed laying the tracks in Devonshire Street between Chalmers and Randle Streets and South Dowling Street.

 

The teams are now tidying up and commencing the task of re-laying the road surface and sorting out the kerb and guttering. No doubt spanpoles and overhead will follow.

100% isn't a bad score!

 

By my reckoning teams from Sydney Light Rail have now completed laying the tracks in Devonshire Street between Chalmers and Randle Streets and South Dowling Street.

 

The teams are now tidying up and commencing the task of re-laying the road surface and sorting out the kerb and guttering. No doubt spanpoles and overhead will follow.

Esdras Jaimes Fotografías /Derechos Reservados

200 meters beyond Lang Road outward towards Randwick a work group installs a crossover.

studio work @ Terra Design - Gura Humorului - 21.11.2009

It's a few weeks since we visited the future Lilyfield Depot site. The trip was worthwhile with activity on all fronts.

100% isn't a bad score!

 

By my reckoning teams from Sydney Light Rail have now completed laying the tracks in Devonshire Street between Chalmers and Randle Streets and South Dowling Street.

 

The teams are now tidying up and commencing the task of re-laying the road surface and sorting out the kerb and guttering. No doubt spanpoles and overhead will follow.

Business meeting in a modern office.

Ensemble immobilier comprenant 5 immeubles pour 300 logements ainsi que 75 commerces de petites et moyennes surfaces.

 

Pays : France 🇫🇷

Région : Grand Est (Alsace)

Département : Bas-Rhin (67)

Ville : Strasbourg (67000)

Quartier : Neudorf

Adresse : 1, avenue du Rhin

Fonction : Commerces et activités / Logements

 

Construction : 2005 → 2008

• Architectes : BIK Architecture / Chapman Taylor / Mérat Workteam

• Gros œuvre : Bouygues Construction / Eiffage Construction Alsace Franche-Comté

PC n° 67 482 03 V0289 délivré le 19 février 2004

 

Niveaux : R+6

Hauteur : 20.50 m

SHON : 3 459 m²

Surface du terrain : 28 879 m²

200 meters beyond Lang Road outward towards Randwick a work group installs a crossover.

Workteam

Modelo: Pily Monción

Dirección: Merary Marizan

Iluminación: Luis Santana

Fotografía: Manus Starlin

Confident manager is explaining the correct way of analysis to his colleagues in the office pointing at the monitor

Parti planifier

Business people in office working on desktop computer

Workteam

Modelo: Pily Monción

Dirección: Merary Marizan

Iluminación: Luis Santana

Fotografía: Manus Starlin

Workteam

Modelo: Pily Monción

Dirección: Merary Marizan

Iluminación: Luis Santana

Fotografía: Manus Starlin

Image of smart business people looking at their leader while he explaining something on whiteboard during seminar

A walk down George Street Sydney shows the extent of recent 'finishing works' with a team laying pavers between the tracks and on footpaths disturbed during construction.

Workteam

Modelo: Pily Monción

Dirección: Merary Marizan

Iluminación: Luis Santana

Fotografía: Manus Starlin

Workteam

Modelo: Pily Monción

Dirección: Merary Marizan

Iluminación: Luis Santana

Fotografía: Manus Starlin

Image of smart business people looking at their leader while he explaining something on whiteboard during seminar

A walk down George Street Sydney shows the extent of recent 'finishing works' with a team laying pavers between the tracks and on footpaths disturbed during construction.

100% isn't a bad score!

 

By my reckoning teams from Sydney Light Rail have now completed laying the tracks in Devonshire Street between Chalmers and Randle Streets and South Dowling Street.

 

The teams are now tidying up and commencing the task of re-laying the road surface and sorting out the kerb and guttering. No doubt spanpoles and overhead will follow.

Image of smart business people looking at their leader while he explaining something on whiteboard during seminar

Workteam

Modelo: Pily Monción

Dirección: Merary Marizan

Iluminación: Luis Santana

Fotografía: Manus Starlin

Work continues in High Street Randwick.on the terminal stop for the Randwick Branch of the line.

 

Only short lengths of track remain to be laid, the platform canopy is well under way as are the electrics and a full complement of spanpoles now line the street.

100% isn't a bad score!

 

By my reckoning teams from Sydney Light Rail have now completed laying the tracks in Devonshire Street between Chalmers and Randle Streets and South Dowling Street.

 

The teams are now tidying up and commencing the task of re-laying the road surface and sorting out the kerb and guttering. No doubt spanpoles and overhead will follow.

A team of engineers | Image source: Pagecloud.com

Wansey Road highlights!

 

The lads were having lunch when I arrived at Wansey Road today. I'm very impressed with the bronze cladding, and the job being done applying it. Sensational!

Inside Quip.com headquarters in San Francisco, California on July 29, 2013. Photography by David Paul Morris

A concrete pour at Circular Quay

 

The plans show that a scissors crossing will be installed between George and Pitt Streets in Alfred Street, immediately to the west of the Circular Quay terminal of the CBD & South East light rail line. To this end a "lean' concrete pour was conducted on 30 April 2018, I was there to witness some of the action!

 

Lean concrete is a mix where the amount of cement is lower than the amount of liquid present in the strata. This makes it ideal as a base layer where other kinds of concrete are placed on top. It is good for providing a flat bottom in uneven or dirt terrain.

 

The workteam has sprung into action.

Portrait of confident people sitting in a line in front of monitors and looking at camera

Work continues in High Street Randwick.on the terminal stop for the Randwick Branch of the line.

 

Only short lengths of track remain to be laid, the platform canopy is well under way as are the electrics and a full complement of spanpoles now line the street.

Inside Quip.com headquarters in San Francisco, California on July 29, 2013. Photography by David Paul Morris

Work continues in High Street Randwick.on the terminal stop for the Randwick Branch of the line.

 

Only short lengths of track remain to be laid, the platform canopy is well under way as are the electrics and a full complement of spanpoles now line the street.

Inside Quip.com headquarters in San Francisco, California on July 29, 2013. Photography by David Paul Morris

Workteam

Modelo: Pily Monción

Dirección: Merary Marizan

Iluminación: Luis Santana

Fotografía: Manus Starlin

Above view of executive business group sitting at desk in office and busy working

Workteam

Modelo: Pily Monción

Dirección: Merary Marizan

Iluminación: Luis Santana

Fotografía: Manus Starlin

Portrait of confident people sitting in a line in front of monitors and looking at camera

Medical staff working in front of a grey laptop while sitting at the desk

2 4 5 6 7 ••• 29 30