View allAll Photos Tagged workinprocess

thanks for documenting our activity with autistic sarah

Solly was disassembled, resassembled, then disassembled and reassembled again while Kelly was leveling this area.

casting objects for milan design week

Kelly built a level area to hang a hammock in next year and ringed the hostas to retain water. Always really dry back here.

Kelly needs to re-evaluate the drainage back here - all still under construction

1 2 ••• 7 8 10 12 13 ••• 17 18