View allAll Photos Tagged wheelloader

A look at the Finning Stand Z5 at Hillhead 2016

Travaux de renouvellement du site propre du trolley à Nancy dans le cadre des aménagements pour la ligne 1 du trolley.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Ouest

Adresse : avenue du XXᵉ Corps

Construction du pôle d'échange multimodal Howald et la réalisation de la deuxième voie du tram à Hesperange.

 

Pays : Luxembourg 🇱🇺

Ville : Hesperange

Quartier : Howald

Adresse : rue des Scillas

Fonction : Transport

 

Construction : 2015 → 2026

When you buy a Volvo, you get a highly reliable and productive wheel loader complete with features to promote efficiency.

 

Visit the Volvo Construction Equipment, North America website for more information on

Wheel Loaders.

my son got from his grandmother for christmas. he put it together last night and i took the picture this morning and emailed it to the family so she could see...aint technology grand? :)

Pictures of the Cat 972M wheel loader in action at Smiths Bletchington quarry.

A1 Asphalting T388 Kenworth moving a Cat IT Wheel Loader.

I have followed this project at Nigg Bay Aberdeen Scotland for over 2 years now, visiting regularly to capture its progress, I post some of my photos to Flickr for other members interested in construction and shipping to peruse and enjoy.

  

Aberdeen South Harbour 2019.

  

Aberdeen Harbour Expansion Project Approval Announced

Commencement of a £350 million project to expand facilities at Aberdeen Harbour, which was recently granted planning consent in the form of Marine Licenses and a Harbour Revision Order by the Scottish Government, was yesterday sanctioned by Aberdeen Harbour Board. The construction contract with its preferred bidder, Dragados UK is due to be formalised at a signing ceremony today (20th December).

 

“We are delighted that, after six years of detailed planning and extensive consultation with our many stakeholders and the regulatory authorities, we are now in a position to approve commencement of construction”, stated Colin Parker, Chief Executive of Aberdeen Harbour Board.

 

Following a detailed engagement process, Aberdeen Harbour Board, in partnership with Dragados UK, a main contractor, will develop facilities over the next three years that will represent a step change in the marine support capabilities in Scotland. These will transform the port’s ability to accommodate the trend for larger vessels we are witnessing across a whole range of industries.

 

The expansion will afford existing customers the opportunity to diversify and expand their interests, whilst attracting new customers and markets to the port, including up-scaled decommissioning activity, a more significant share of the available cruise vessel fleet and larger more cost-effective commercial vessels”.

 

Alistair Mackenzie, Chairman of Aberdeen Harbour Board added, “Aberdeen Harbour has been in existence for almost 900 years. Its longevity can be attributed to its ability to adapt to changing trading requirements and being forward-thinking in delivering new and improved facilities to support its customers, while at the same time attracting new business.

 

This major new chapter in the port’s history continues this approach and underpins the Trust Port ethos of viewing future generations as key stakeholders. We believe that the infrastructure developed in Nigg Bay will encourage and support the continued prosperity of the city and region that the harbour serves and make a significant national economic contribution”.

 

The development, which is a Scottish Government National Planning Framework (3) Project and is scheduled to be completed by 2020, was welcomed by the Minister for Transport and the Islands, Humza Yousaf, who said: “This is excellent news for Aberdeen and the Scottish maritime industry, as the signing of the construction contract means this nationally significant project can now get underway in earnest.

 

The significant investment will bring jobs and business to Aberdeen, supporting the local and national economy. The historic harbour will be transformed to accommodate larger vessels, opening up potential new revenue streams and offering customers world-class marine support facilities.

 

These are exciting times for Aberdeen Harbour. I wish everyone involved in the project every success and I very much look forward to following the expansion as it progresses.”

 

Dragados UK were named as the Board’s preferred bidder in September this year, and the company announced that they plan to commence construction on site in early 2017.

 

The new facilities will include 1,400 metres of new quay, with a water depth of up to 10.5 metres and will create an additional 125,000 square metres of lay-down area. An independent study, commissioned by Scottish Enterprise, estimates that the development will generate an additional £1 billion per annum to the economy by 2035, and will create an additional 7,000 equivalent jobs.

 

Funding arrangements for the project incorporated commercial borrowing from the European Investment Bank, and funding from the Aberdeen City & Region Deal. Support for the project’s feasibility study was also received from Scottish Enterprise and from the 2013 Annual Programme Call of the European Commission’s Trans-European Transport Network (TEN-T) Programme.

 

Jonathan Taylor, Vice President of the European Investment Bank also commented: “Continued investment at Europe’s leading ports is essential to improve infrastructure and to cater for ever-changing shipping needs. The European Investment Bank is pleased to support the transformational Nigg Bay development that will significantly increase quayside space, allow deep-water access for larger vessels and ensure Aberdeen’s continued strong contribution to the Scottish economy.”

 

I have followed this project at Nigg Bay Aberdeen Scotland for over 2 years now, visiting regularly to capture its progress, I post some of my photos to Flickr for other members interested in construction and shipping to peruse and enjoy.

  

Aberdeen South Harbour 2019.

  

Aberdeen Harbour Expansion Project Approval Announced

Commencement of a £350 million project to expand facilities at Aberdeen Harbour, which was recently granted planning consent in the form of Marine Licenses and a Harbour Revision Order by the Scottish Government, was yesterday sanctioned by Aberdeen Harbour Board. The construction contract with its preferred bidder, Dragados UK is due to be formalised at a signing ceremony today (20th December).

 

“We are delighted that, after six years of detailed planning and extensive consultation with our many stakeholders and the regulatory authorities, we are now in a position to approve commencement of construction”, stated Colin Parker, Chief Executive of Aberdeen Harbour Board.

 

Following a detailed engagement process, Aberdeen Harbour Board, in partnership with Dragados UK, a main contractor, will develop facilities over the next three years that will represent a step change in the marine support capabilities in Scotland. These will transform the port’s ability to accommodate the trend for larger vessels we are witnessing across a whole range of industries.

 

The expansion will afford existing customers the opportunity to diversify and expand their interests, whilst attracting new customers and markets to the port, including up-scaled decommissioning activity, a more significant share of the available cruise vessel fleet and larger more cost-effective commercial vessels”.

 

Alistair Mackenzie, Chairman of Aberdeen Harbour Board added, “Aberdeen Harbour has been in existence for almost 900 years. Its longevity can be attributed to its ability to adapt to changing trading requirements and being forward-thinking in delivering new and improved facilities to support its customers, while at the same time attracting new business.

 

This major new chapter in the port’s history continues this approach and underpins the Trust Port ethos of viewing future generations as key stakeholders. We believe that the infrastructure developed in Nigg Bay will encourage and support the continued prosperity of the city and region that the harbour serves and make a significant national economic contribution”.

 

The development, which is a Scottish Government National Planning Framework (3) Project and is scheduled to be completed by 2020, was welcomed by the Minister for Transport and the Islands, Humza Yousaf, who said: “This is excellent news for Aberdeen and the Scottish maritime industry, as the signing of the construction contract means this nationally significant project can now get underway in earnest.

 

The significant investment will bring jobs and business to Aberdeen, supporting the local and national economy. The historic harbour will be transformed to accommodate larger vessels, opening up potential new revenue streams and offering customers world-class marine support facilities.

 

These are exciting times for Aberdeen Harbour. I wish everyone involved in the project every success and I very much look forward to following the expansion as it progresses.”

 

Dragados UK were named as the Board’s preferred bidder in September this year, and the company announced that they plan to commence construction on site in early 2017.

 

The new facilities will include 1,400 metres of new quay, with a water depth of up to 10.5 metres and will create an additional 125,000 square metres of lay-down area. An independent study, commissioned by Scottish Enterprise, estimates that the development will generate an additional £1 billion per annum to the economy by 2035, and will create an additional 7,000 equivalent jobs.

 

Funding arrangements for the project incorporated commercial borrowing from the European Investment Bank, and funding from the Aberdeen City & Region Deal. Support for the project’s feasibility study was also received from Scottish Enterprise and from the 2013 Annual Programme Call of the European Commission’s Trans-European Transport Network (TEN-T) Programme.

 

Jonathan Taylor, Vice President of the European Investment Bank also commented: “Continued investment at Europe’s leading ports is essential to improve infrastructure and to cater for ever-changing shipping needs. The European Investment Bank is pleased to support the transformational Nigg Bay development that will significantly increase quayside space, allow deep-water access for larger vessels and ensure Aberdeen’s continued strong contribution to the Scottish economy.”

 

Photo © Tristan Savatier - All Rights Reserved - License this photo on www.loupiote.com/4732553130

Share this photo on: facebooktwittermore...

 

Komatsu WA 250 Front Loader

 

If you like this photo, follow me on instagram (tristan_sf) and don't hesitate to leave a comment or email me.

Der türkische Baumaschinenhersteller Hidromek stellte auf der Intermat 2015 in Paris erstmals einen knickgelenkten Radlader vor. Angetrieben wird er von einem Sechszylinder-Reihenmotor der MTU-Baureihe 1100 mit einer Leistung von 280 Kilowatt. Die Serienproduktion des Radladers soll im Jahr 2016 beginnen.

 

Turkish construction vehicle manufacturer Hidromek has presented its first articulated wheel loader at Intermat 2015 in Paris. The vehicle is powered by an MTU engine of Series 1100. The six cylinder in-line engine has a power output of 280 kW. Serial production of the vehicle is set to start in 2016.

First introduced at the 2000 MINExpo in Las Vegas as the LeTourneau L-2350 it is the world's largest wheel loader. Joy Global took over LeTourneau and the machine became the P&H L-2350. In the meantime Komatsu Mining is the new owner, thus the new designation WE2350 to distinguish the LeTourneau derived products from the Komatsu wheel loaders that bear the WA designation.

 

At 270 tonnes, the wheel loader carries a 41 cubic meter bucket and features a Diesel electric drivetrain with a 2300 horsepower engine and four electric wheel hub motors. It is designed to center load ultra-class haulers of up to 400 ton (363 tonne) payload.

 

My model at a scale of 1/28.5 is fully remote controlled via bluetooth and the Brick Controller 2 app using two SBricks. The following functions are powered:

 

- All-wheel drive: one Power Functions XL motor per axle

- Steering: one Power Functions M motor and two large linear actuators

- Loader boom assembly: one Power Functions XL motor and two XL linear actuators (from CaDa because they come in black)

- Bucket: one Power Functions L motor and two large linear actuators

- Work and tail lights, using three pairs of Power Functions LEDs

 

Power comes from a Power Functions battery box hidden in the radiator compartment.

 

Furthermore, the model sports the following features:

 

- Oscillating rear axle

- Deployable acces stairs

- Openable cab doors

- Extendable work platform on the inverter cabinet

- Deployable ladder on the right service platform

 

The challenge with this model was that it features huge wheels, being the largest tires on any machine in the real world. To overcome this hurdle, I used brick-built wheels with a diameter of around 18 studs and a width of eight studs. The 22-sided brick cylinder is reinforced by a layer of rubber connectors, at the same time ensuring a smoother ride. The original design to these wheels comes from Milan of Eurobricks.

When you buy a Volvo, you get a highly reliable and productive wheel loader complete with features to promote efficiency.

 

Visit the Volvo Construction Equipment, North America website for more information on

Wheel Loaders.

The Wilson Gdynia (IMO 9056064) is seen here discharing bulk cargo at the Euroports Terminal

Installing new log deck for canter line in saw mill (had to flip it over first). Eastern White Pine log yard.

When you buy a Volvo, you get a highly reliable and productive wheel loader complete with features to promote efficiency.

 

Visit the Volvo Construction Equipment, North America website for more information on

Wheel Loaders.

When you buy a Volvo, you get a highly reliable and productive wheel loader complete with features to promote efficiency.

 

Visit the Volvo Construction Equipment, North America website for more information on

Wheel Loaders.

When you buy a Volvo, you get a highly reliable and productive wheel loader complete with features to promote efficiency.

 

Visit the Volvo Construction Equipment, North America website for more information on

Wheel Loaders.

I have followed this project at Nigg Bay Aberdeen Scotland for over 2 years now, visiting regularly to capture its progress, I post some of my photos to Flickr for other members interested in construction and shipping to peruse and enjoy.

  

Aberdeen South Harbour 2019.

  

Aberdeen Harbour Expansion Project Approval Announced

Commencement of a £350 million project to expand facilities at Aberdeen Harbour, which was recently granted planning consent in the form of Marine Licenses and a Harbour Revision Order by the Scottish Government, was yesterday sanctioned by Aberdeen Harbour Board. The construction contract with its preferred bidder, Dragados UK is due to be formalised at a signing ceremony today (20th December).

 

“We are delighted that, after six years of detailed planning and extensive consultation with our many stakeholders and the regulatory authorities, we are now in a position to approve commencement of construction”, stated Colin Parker, Chief Executive of Aberdeen Harbour Board.

 

Following a detailed engagement process, Aberdeen Harbour Board, in partnership with Dragados UK, a main contractor, will develop facilities over the next three years that will represent a step change in the marine support capabilities in Scotland. These will transform the port’s ability to accommodate the trend for larger vessels we are witnessing across a whole range of industries.

 

The expansion will afford existing customers the opportunity to diversify and expand their interests, whilst attracting new customers and markets to the port, including up-scaled decommissioning activity, a more significant share of the available cruise vessel fleet and larger more cost-effective commercial vessels”.

 

Alistair Mackenzie, Chairman of Aberdeen Harbour Board added, “Aberdeen Harbour has been in existence for almost 900 years. Its longevity can be attributed to its ability to adapt to changing trading requirements and being forward-thinking in delivering new and improved facilities to support its customers, while at the same time attracting new business.

 

This major new chapter in the port’s history continues this approach and underpins the Trust Port ethos of viewing future generations as key stakeholders. We believe that the infrastructure developed in Nigg Bay will encourage and support the continued prosperity of the city and region that the harbour serves and make a significant national economic contribution”.

 

The development, which is a Scottish Government National Planning Framework (3) Project and is scheduled to be completed by 2020, was welcomed by the Minister for Transport and the Islands, Humza Yousaf, who said: “This is excellent news for Aberdeen and the Scottish maritime industry, as the signing of the construction contract means this nationally significant project can now get underway in earnest.

 

The significant investment will bring jobs and business to Aberdeen, supporting the local and national economy. The historic harbour will be transformed to accommodate larger vessels, opening up potential new revenue streams and offering customers world-class marine support facilities.

 

These are exciting times for Aberdeen Harbour. I wish everyone involved in the project every success and I very much look forward to following the expansion as it progresses.”

 

Dragados UK were named as the Board’s preferred bidder in September this year, and the company announced that they plan to commence construction on site in early 2017.

 

The new facilities will include 1,400 metres of new quay, with a water depth of up to 10.5 metres and will create an additional 125,000 square metres of lay-down area. An independent study, commissioned by Scottish Enterprise, estimates that the development will generate an additional £1 billion per annum to the economy by 2035, and will create an additional 7,000 equivalent jobs.

 

Funding arrangements for the project incorporated commercial borrowing from the European Investment Bank, and funding from the Aberdeen City & Region Deal. Support for the project’s feasibility study was also received from Scottish Enterprise and from the 2013 Annual Programme Call of the European Commission’s Trans-European Transport Network (TEN-T) Programme.

 

Jonathan Taylor, Vice President of the European Investment Bank also commented: “Continued investment at Europe’s leading ports is essential to improve infrastructure and to cater for ever-changing shipping needs. The European Investment Bank is pleased to support the transformational Nigg Bay development that will significantly increase quayside space, allow deep-water access for larger vessels and ensure Aberdeen’s continued strong contribution to the Scottish economy.”

 

I have followed this project at Nigg Bay Aberdeen Scotland for over 2 years now, visiting regularly to capture its progress, I post some of my photos to Flickr for other members interested in construction and shipping to peruse and enjoy.

  

Aberdeen South Harbour 2019.

  

Aberdeen Harbour Expansion Project Approval Announced

Commencement of a £350 million project to expand facilities at Aberdeen Harbour, which was recently granted planning consent in the form of Marine Licenses and a Harbour Revision Order by the Scottish Government, was yesterday sanctioned by Aberdeen Harbour Board. The construction contract with its preferred bidder, Dragados UK is due to be formalised at a signing ceremony today (20th December).

 

“We are delighted that, after six years of detailed planning and extensive consultation with our many stakeholders and the regulatory authorities, we are now in a position to approve commencement of construction”, stated Colin Parker, Chief Executive of Aberdeen Harbour Board.

 

Following a detailed engagement process, Aberdeen Harbour Board, in partnership with Dragados UK, a main contractor, will develop facilities over the next three years that will represent a step change in the marine support capabilities in Scotland. These will transform the port’s ability to accommodate the trend for larger vessels we are witnessing across a whole range of industries.

 

The expansion will afford existing customers the opportunity to diversify and expand their interests, whilst attracting new customers and markets to the port, including up-scaled decommissioning activity, a more significant share of the available cruise vessel fleet and larger more cost-effective commercial vessels”.

 

Alistair Mackenzie, Chairman of Aberdeen Harbour Board added, “Aberdeen Harbour has been in existence for almost 900 years. Its longevity can be attributed to its ability to adapt to changing trading requirements and being forward-thinking in delivering new and improved facilities to support its customers, while at the same time attracting new business.

 

This major new chapter in the port’s history continues this approach and underpins the Trust Port ethos of viewing future generations as key stakeholders. We believe that the infrastructure developed in Nigg Bay will encourage and support the continued prosperity of the city and region that the harbour serves and make a significant national economic contribution”.

 

The development, which is a Scottish Government National Planning Framework (3) Project and is scheduled to be completed by 2020, was welcomed by the Minister for Transport and the Islands, Humza Yousaf, who said: “This is excellent news for Aberdeen and the Scottish maritime industry, as the signing of the construction contract means this nationally significant project can now get underway in earnest.

 

The significant investment will bring jobs and business to Aberdeen, supporting the local and national economy. The historic harbour will be transformed to accommodate larger vessels, opening up potential new revenue streams and offering customers world-class marine support facilities.

 

These are exciting times for Aberdeen Harbour. I wish everyone involved in the project every success and I very much look forward to following the expansion as it progresses.”

 

Dragados UK were named as the Board’s preferred bidder in September this year, and the company announced that they plan to commence construction on site in early 2017.

 

The new facilities will include 1,400 metres of new quay, with a water depth of up to 10.5 metres and will create an additional 125,000 square metres of lay-down area. An independent study, commissioned by Scottish Enterprise, estimates that the development will generate an additional £1 billion per annum to the economy by 2035, and will create an additional 7,000 equivalent jobs.

 

Funding arrangements for the project incorporated commercial borrowing from the European Investment Bank, and funding from the Aberdeen City & Region Deal. Support for the project’s feasibility study was also received from Scottish Enterprise and from the 2013 Annual Programme Call of the European Commission’s Trans-European Transport Network (TEN-T) Programme.

 

Jonathan Taylor, Vice President of the European Investment Bank also commented: “Continued investment at Europe’s leading ports is essential to improve infrastructure and to cater for ever-changing shipping needs. The European Investment Bank is pleased to support the transformational Nigg Bay development that will significantly increase quayside space, allow deep-water access for larger vessels and ensure Aberdeen’s continued strong contribution to the Scottish economy.”

 

This loader is for sale by Big Iron, Inc in Jacksonville, FL. Detailed pictures of this loader are provided in this set.

 

www.bigiron4sale.com

1 2 ••• 30 31 33 35 36 ••• 79 80