View allAll Photos Tagged sitework
Granada Village Shopping Center Redevelopment (Rite Aid Interior Construction - 2011-08-04) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Phase 2 DIning District Sitework Construction - 2012-02-24) - Granada Hills, CA. Urban One www.urbanone.com.
1] Siteworks had 4 guys working on front side of canopy grades. 148 yards of undercut was removed.
2] Southeastern pump and tank had 9 guys working on fuel lines.
3] M&J had 5 guys working on interior rough.
4] Doster had 6 guys working on FRP, hanging sheetrock, plywood and finishing.
5] Doster had 2 guys working on paint on roof screens.
6] CE holt had 3 guys working on setting roof top equipment and interior cooler doors.
7] Tino tile had 2 guys working on floor and wall tile.
Granada Village Shopping Center Redevelopment (Phase 1 Sitework Construction - 2011-05-12) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Phase 2 Sitework Construction - 2012-02-07) - Granada Hills, CA. Urban One www.urbanone.com.
1] Siteworks had 4 guys working on grading and hauling off their excess dirt.
2] Siteworks also had 4 guys working on backfill of water quailty box.
3] M&J had 5 guys working on interior rough.
4] Doster had 5 guys hanging and finishing sheetrock.
5] Tino tile had 3 guys working on floor and wall tile.
6] Air charlotte had A delivery of grills.
7] Mecklenburg plumbing had 2 guys working on urinals and water lines.
8] McGee brothers had 4 guys filling cells on knee wall.
Granada Village Shopping Center Redevelopment (Phase 2 Dining District Sitework Construction - 2012-02-28) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Building A1-A4 Rain Damage - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Building B Stein Mart Facade Construction - 2012-01-12) - Granada Hills, CA. Urban One www.urbanone.com.
SiteWorks are performances on campus that marked the culmination of a collaboration between Dance and Creative Placemaking Architecture students who have been developing site-specific works over the course of the spring semester. The SiteWork "move." was performed and installed at the Art-Sociology Building Atrium. Photos: Jelena Djakovic.
SiteWorks are performances on campus that marked the culmination of a collaboration between Dance and Creative Placemaking Architecture students who have been developing site-specific works over the course of the spring semester. The SiteWork "Burn - The Fire of 1912" was performed and installed at the Point of Failure. Photos: Jelena Dakovic.
uilding 1
Roof Trusses are 95% complete with sheathing 75% complete on the building.
Mechanical, Electrical, Plumbing rough in is underway on the 3rd and 4th floors and 50% complete.
Shingle and Flat Roof Installation is underway and 65% complete.
Building weather wrap is being installed and 90% complete.
Window Installation is underway and 75% complete.
Siding installation has started in the Courtyard.
Parking Garage Sprinkler systems is 75% complete.
Courtyard waterproofing prep is underway.
Building 2
Roof Sheathing is complete.
Mechanical, Electrical, Plumbing and Fire Sprinkler rough in is 40% complete at the 3rd floor and progressing up to the 4th floor.
Shingle and Flat Roof Installation is underway and 95% complete.
Building weather wrap is being installed and 95% complete.
Siding is underway on the South elevation and is 10% complete
Window Installation is underway and 85% complete.
Building 3
Wood framing has commenced.
Building 4
Foundation is 100% complete
Elevator shaft construction is complete
Underground Plumbing Rough is 65% complete
Underground Electrical Rough is 75% complete
Building 5
Foundation, underground utilities and slab is complete.
Progress pending framing start forecasted to start in November, 2018.
Building 6
Siding is complete.
Insulation is complete
Drywall installation is complete.
Site curbs are complete.
Painting is underway
Tile installation is underway.
Interior door and trim is underway.
Sitework
Curb formwork and installation is 90% complete on Mill Road
Starting to set building site to final subgrade
Pump station Wet Well foundation walls have been poured and wall formwork for balance of building is 95% complete
Damproofing and backfill has started.
Granada Village Shopping Center Redevelopment (Building A1-A4 Rain Damage - 2012-01-26) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Building A2 Roof Construction - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Petco Interior Construction - 2011-08-04) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Phase 1 Trash Enclosure Construction - 2012-01-25) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Pad L Facade Construction - 2012-02-24) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Phase 2 Dining District Sitework Construction - 2012-02-28) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (DWP Water Line Construction - 2012-02-10) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Building C1 HomeGoods Facade Construction - 2012-01-31) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Pad L Facade Construction - 2012-02-09) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Rite Aid Interior Construction - 2011-08-04) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Rite Aid Interior Construction - 2011-08-04) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Phase 1 Sitework Traffic Circle Construction - 2011-07-21) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Petco Facade Construction - 2011-08-04) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Phase 2 Infiltration Basin Sitework Construction - 2011-07-28) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Building A2 Facade Construction - 2012-02-28) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Building A1-A4 Rain Damage - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Building A1-A4 Rain Damage - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.
Granada Village Shopping Center Redevelopment (Phase 1 Sitework Construction - 2011-05-12) - Granada Hills, CA. Urban One www.urbanone.com.