Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.
Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.
Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.
Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.
Terminal 21 under construction near the Asoke Skytrain station in Sukhumvit Road, Bangkok, in December 2010. Terminal 21 will be a 9-storey shopping centre that includes an SF Cinema, a supermarket, a 20-storey serviced apartment complex, 145,000 square meters of office space and 40,000 square meters of retail space. Each floor of the mall will be themed on a different city or region of the world. The bottom floor will be the Caribbean, then Rome, Paris, Tokyo, London, Istanbul, San Francisco (which occupies two floors) and Los Angeles. Bangkok already has some of the most spectacular shopping malls in the world (Siam Paragon being one of the biggest in Asia).
31 West Main Street is in the heart of Patchogue’s downtown revitalization, the building has stood in the Village for more than a century and has been restored beyond its original glory by TRITEC.
Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings, many of these features have returned in the revitalization..
Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the jewel of Main St and is at a prime location in the heart of the New Village project.
The development, construction and the current management of the property are all done by TRITEC
This is the mystery new grocer in the Willow Place Shopping Center at 5430 West Broad St, Richmond, VA.
This store opened in 1993 as a Food Lion and closed in 2017. In 2022, construction started on this building to be built as "Grocer at Willow Place" (and shopping the shopping center owner would not disclose the tenant). The tenant still has not been officially disclosed, however the current buildout definitely resembles an Amazon Fresh grocery store. Being the trend with other Amazon Fresh grocery stores under construction, this one has never been completed after Amazon halted the construction of all stores that were being built.
From Sharper Image, to The Shoe Dept., to Casual Corner, to Cache, this section of the lifestyle center has seen numerous retailers, both regional and national, inauspiciously attempt to operate successful stores in the open air shopping center.
Christchurch's Re:START Mall on my walk around the city to catch up on events. February 7, 2015 Christchurch New Zealand.
Re:START is an outdoor retail space consisting of temporary buildings made from shipping containers. Opened in October 2011, Re:START has been steadily growing to approximately 40 retailers, a number of food caravans and a market on the weekend.
For More Info on the ReStart Mall: www.christchurchnz.com/destinations/christchurch/restart-...
a pair of vintage, circa 1988 McGuire chairs with double dragon turquoise-and-white cushions. The teal blue ceramic table with camel's leg base is from Marseilles circa 1917.
You can find a large number of full-resolution photos under a Creative Commons license on my official website: nenadstojkovicart.com/albums
The W57 tetrahedron building at 625 West 57th Street, designed by Bjarke Ingels Group (BIG), offers 709 residential rental units and 45,000 square feet of commercial retail space (scheduled to open in early 2016)
Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.
Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.
Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.
Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.
Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.
Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.
Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.
Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.
Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.
Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.
Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.
Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.
Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.
Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.
Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.
Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.
Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.
The New Village at Patchogue project has progressed nicely beyond 90% of all subgrade structural features and about 60% of the elevated structural post-tension slab work is completed or in progress. Building 1 spearheads the vertical rise with two levels currently framed and Masonry construction rising above the wood framing. Building 2 will under way with its first floor of wood framing by the end of April 2013. Mechanical, Electrical and Plumbing trades have been coordinating with ongoing structural components in all buildings as the system installation needs progress, and installation of roughed out systems in sub grade and framed units is well under way.
External site improvements are partially placed while the installation of a major portion of subgrade sewer, power, communication and drainage systems that will serve the project are scheduled to commence shortly. By the end of May, the last section of connecting structural slab is expected at the crossover to Havens Avenue opposite Jennings and will complete the footprint for vertical construction at buildings 1, 2, 3 and 5. Building 4 is scheduled to start excavation at West side of the site (on Main Street) to make way for the foundation at the last structure in the project.
The W57 tetrahedron building at 625 West 57th Street, designed by Bjarke Ingels Group (BIG), offers 709 residential rental units and 45,000 square feet of commercial retail space (scheduled to open in early 2016)
The W57 tetrahedron building at 625 West 57th Street, designed by Bjarke Ingels Group (BIG), offers 709 residential rental units and 45,000 square feet of commercial retail space (scheduled to open in early 2016)
Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.
Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.
Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.