View allAll Photos Tagged phasor
"Leaping, floating, flying down those endless stairs through the dark house; racing mindlessly out into the narrow, steep, and ancient street of steps and tottering houses; clattering down steps and over cobbles to the lower streets and the putrid canyon-walled river; panting across the great dark bridge to the broader, healthier streets and boulevards we know; all these are terrible impressions that linger with me. And I recall that there was no wind, and that the moon was out, and that all the lights of the city twinkled."
a Milksnake phase Variable Kingsnake (Lampropeltis mexicana thayeri)
32 triads (black-red-black),32 white stripes,26 inches long,1 year old
November 20/21
Toronto,
Mixed-use Development,
CIBC Square Phase II,
141 Bay St,
Ivanhoé Cambridge,
Hines,
50s,
Wilkinson Eyre Architects,
Adamson Associates Architect,
Wheeltrims off, replaced with the very early LS-spec wheel caps (from an ex-Vauxhall press car at the scrapyard...) badgeless grille, wing mirror caps painted fluorescent green and I experimented with painting the rear quarter black (sorry, MattLoaf.....)
Demolition continues at Station Square Mall at Burnaby's Metrotown. The home of Save-On Foods will be gone, two month shy of their opening day's 25th anniversary...
Phase II of our upgrade project is complete with the addition of the Shimano/Santana Sweet Sixteens.
A tale of disappointment, inspiration and grim determination to have the Phaser of my boyhood dreams
Lunar Phases
Werke u.a. von Kaija Saariaho, Miyuki Ito und Salvatore Sciarrino
mit Dante Montoya (Flöte), Maria Pache (Viola) und Lydie Römisch (Harfe)
am 28.06.2014 in der Klangwerkstatt Detmold.
Lizenz | license: CC BY-SA 4.0
A view of the IRT roadworks taking place on Otto Du Plessis Drive (R27) at the Diep River bridge, towards Sunset Beach and Table View.
With phase 1A of the IRT project on track for completion in the second quarter of 2010, the City of Cape Town has just announced that it has placed an order for Volvo IRT vehicles.