View allAll Photos Tagged path
These are the images I look forword to when I start my walks in the woods.Just looking down this path and not taking it is peacefull enough for me. But then I wonder what nature holds for me rite around the next corner. I just can't get enough sites like this.
Ian Sprague, et al.
Terracotta bricks (tiles), 1978–79
Fitzroy Gardens, cnr Landsdowne St & Cathedral Pl (Melway ref. 2G, B2)
People’s Path originates from a community art project, providing a metaphorical means by which the community can take ownership of a public space. This work comprises approximately 10,000 standard terracotta bricks set in the three concentric circles surrounding a raised garden bed, with plantings of palms and ivy. The exposed face of each brick features a hand-etched drawing. The associated plaque advises that the ‘tiles’ were made by the people of Victoria on the opening day of the Arts Victoria 78 Craft Festival. The path was opened by the Hon. R.J. Hamer, then premier and arts minister, on the 18 February 1979.
Photograph by Louis Porter
The Bridle Path
The path was hacked out of the rock by a working party in 1851. The Bridle Path soon became the main access way for families of pioneers bringing household goods and personal belongings over the Hills. The horses had to be led by the bridle to the Summit - thus the name Bridle Path.
Come walk with me, just turn your step and see the view this way
The flowers rise with ecstasy and scent the warming day
The birds would nestle in your hand and eat a crumb for tea
Such magic lies before us if you would walk with me.
Tokoname Pottery Path ("Yakimono Sanpomichi") is a path which started as a natural tour of the various points of interest in Tokoname in about 1972.
Skipton, Yorkshire, December 31st 2010.
Nikon F90 with Nikkor 28-80mm f3.5-5.6 lens on Rollei Retro 100 stand developed in Rodinal 1:100 for 70mins
On Monday, Jan. 27, the Port Authority of New York and New Jersey officials at the Hoboken Terminal provided details of the planned PATH Hoboken station closure beginning at 11:59 p.m. Thursday, Jan. 30, and lasting through 5 a.m. Monday, Feb. 24.
The closure, which was announced in October 2024, will allow for critical repairs across track and switch infrastructure while also enabling extensive station renovation work. A wide array of travel alternatives will be available, including free shuttle buses, cross-honored ferry service, supplemental NJ TRANSIT 126 bus service to the Midtown Bus Terminal, and supplemental Hudson-Bergen Light Rail service. NJ TRANSIT and NY Waterway service at Hoboken Terminal will continue operating.
The speakers at the media briefing included:
- Clarelle DeGraffe, PATH director and general manager
- Donald Liloia, senior vice president, NY Waterway
- Joseph Lucci, managing partner, Charter Linkz (at podium)
Credit: PANYNJ
Thames Path Walk, 28th May 2007: Greenwich Peninsula - it would have been much funnier if one of them had fallen in !