View allAll Photos Tagged onflickr

I'm taking a picture of the Basketball Arena over this womans head. She's taking a picture of the Velodrome over my head.

 

The Basketball Arena has 12,000 seats for Olympic basketball and the semi-finals and finals of the Olympic handball, and 10,000 for Paralympic wheelchair basketball and wheelchair rugby. The arena was also used as a holding area for athletes during the Opening and Closing Ceremonies of the games. Concept designs by Wilkinson Eyre Architects were agreed in June 2008 and a planning application was submitted in November 2008. It is a temporary venue, and the largest built for any Games. The possibility of subsequently deconstructing the arena and transporting it to Rio de Janeiro for the 2016 Summer Olympics was discussed, though the plan has been shelved due to doubts from some Brazilian officials about its feasibility.

 

The Olympic Park, in London, United Kingdom, is a sporting complex built for the 2012 Summer Olympics and the 2012 Summer Paralympics, situated to the east of the city adjacent to the Stratford City development. It contains the athletes' Olympic Village and several of the sporting venues including the Olympic Stadium and London Aquatics Centre, besides the London Olympics Media Centre. The park is overlooked by the ArcelorMittal Orbit, an observation tower and Britain's largest piece of public art. After the Olympics, the park is to be known as Queen Elizabeth Olympic Park, to commemorate the Diamond Jubilee of Elizabeth II, though it will not be an official Royal Park of London.

 

London's Olympic and Paralympic bid proposed that there would be four indoor arenas in the park in addition to the main venues, but the revised master plan published in 2006 reduced this to three, with the volleyball events moved to the Earls Court Exhibition Centre. The fencing arena was also cancelled, with the fencing events taking place at ExCeL London. The remaining indoor arenas are the Basketball Arena and the Copper Box, in addition to the Water Polo Arena, the Aquatics Centre, and the Velopark. The final design of the park was approved by the Olympic Delivery Authority and its planning-decisions committee.

The stone for the project was shipped piece by piece from India, where craftsmen had sculptured it into more than 500 designs including rosettes, leaves, feathers and lacy geometric patterns. The thousands of sections, ranging from five ounces to five tons, each with its own bar code, have been assembled like a giant jigsaw puzzle based on instructions for religious buildings written into scripture thousands of years old.

 

Although the engineers said they had not counted the number of pieces they used, a mandir in London that served as a model for the Lilburn building required more than 26,000 individual parts.

 

The price tag for the project, $19 million, has been kept down by the thousands of hours of volunteer labor donated by congregants of the BAPS Swaminarayan temple in Clarkston, Ga., who will move from a converted skating rink when the temple is completed in August. For more than two years homemakers and retirees have been polishing the stonework by hand and cooking for the construction workers. Hundreds of volunteers installed more than 50,000 plants for the landscaping.

  

Next one on February 1st, on 500px and the next one on flickr on February 15th.

I hope everyone has a Wonderful Day!

The stone for the project was shipped piece by piece from India, where craftsmen had sculptured it into more than 500 designs including rosettes, leaves, feathers and lacy geometric patterns. The thousands of sections, ranging from five ounces to five tons, each with its own bar code, have been assembled like a giant jigsaw puzzle based on instructions for religious buildings written into scripture thousands of years old.

 

Although the engineers said they had not counted the number of pieces they used, a mandir in London that served as a model for the Lilburn building required more than 26,000 individual parts.

 

The price tag for the project, $19 million, has been kept down by the thousands of hours of volunteer labor donated by congregants of the BAPS Swaminarayan temple in Clarkston, Ga., who will move from a converted skating rink when the temple is completed in August. For more than two years homemakers and retirees have been polishing the stonework by hand and cooking for the construction workers. Hundreds of volunteers installed more than 50,000 plants for the landscaping.

  

The stone for the project was shipped piece by piece from India, where craftsmen had sculptured it into more than 500 designs including rosettes, leaves, feathers and lacy geometric patterns. The thousands of sections, ranging from five ounces to five tons, each with its own bar code, have been assembled like a giant jigsaw puzzle based on instructions for religious buildings written into scripture thousands of years old.

 

Although the engineers said they had not counted the number of pieces they used, a mandir in London that served as a model for the Lilburn building required more than 26,000 individual parts.

 

The price tag for the project, $19 million, has been kept down by the thousands of hours of volunteer labor donated by congregants of the BAPS Swaminarayan temple in Clarkston, Ga., who will move from a converted skating rink when the temple is completed in August. For more than two years homemakers and retirees have been polishing the stonework by hand and cooking for the construction workers. Hundreds of volunteers installed more than 50,000 plants for the landscaping.

  

By the 1880s, when he published Worms (or The Formation of Vegetable Mould through the Action of Worms as the British Library would say), Darwin had become a huge celebrity. Worms was a bestseller, equalling The Origin of Species in terms of sales. And for many years after it could easily be found at a very low price second hand--think J. K . Rowling's Casual Vacancy.

 

That was in 1881. Back in the 1830s, sick from the pressure of destroying 2000 years of culture, Darwin was convalescing at his Uncle Jos's place (Jos Wedgewood II) near what is nowadays known as Newcastle-under-Lyme. Uncle Jos pointed how a layer of lime spread on the ground outside several years previously had moved nearly a centimetre under the ground (hence "Newcastle-under-Lyme"). Uncle Jos couldn't help himself, and made some joke about how God's powers worked in mysterious ways to aid the humble grower of vegetables.

 

Thus provoked, Darwin immediately set to work trying to find the most prosaic cause possible for this phenomena. He quickly settled on earthworms, and spent the next 50 years, on and off, observing how pieces of stone sank into the earth under the action of worms turing the soil.

 

This is one of his worm-stones, the remains of a Wedgewood kiln at Leith Hill Place. Darwin used to visit here to record how the earth around the stone had been moved by the little critters.

Anita was searching for allergy medicine, and we were told (by a fellow tourist?) that there is a pharmacy inside the Franciscan Monastery, a recommended attraction in its own right. Indeed, there was. The pharmacist, however, did not appreciate my desire to photograph the lovely ceiling and shelves of the dispensary. So James the Spy Camera went to work, and took a sneaky-shot through the window.

 

Perhaps it is secret because it's been in operation since 1317 and claims to be the oldest working pharmacy in Europe.

Artists often come up with one song or one album untitled. Now now, I'm not calling myself an artist but I'm still using my Untitled card and this shot is going to be it.

Mens 100 metre T44 final. Richard Browne wins the silver medal.

 

The Olympic Stadium in Olympic Park in Stratford, London, England was the centrepiece of the 2012 London Olympics, the last stop in the 2012 Olympics torch relay, and the venue of the athletic events as well as the opening and closing ceremonies. It was the central venue of the 2012 London Paralympics.

 

It is located at Marshgate Lane in London's Stratford district in the Lower Lea Valley. The stadium has a capacity of 80,000, making it the third-largest stadium in England behind Wembley Stadium and Twickenham Stadium.

 

The stadium's track and field arena is excavated out of the soft clay found on the site, around which is permanent seating for 25,000, built using concrete "rakers". The natural slope of the land is incorporated into the design, with warm-up and changing areas dug into a semi-basement position at the lower end. Spectators enter the stadium via a podium level, which is level with the top of the permanent seating bowl. A demountable lightweight steel and concrete upper tier is built up from this "bowl" to accommodate a further 55,000 spectators.

 

The stadium is made up of different tiers; during the games the stadium was able to hold 80,000 spectators. The base tier, which will be permanent and allow for 25,000 seats, is a sunken elliptical bowl that is made up of low-carbon-dioxide concrete; this contains 40 percent less embodied carbon than conventional concrete. The foundation of the base level is 5,000 piles reaching up to 20 metres deep. From there, there is a mixture of driven cast in situ piles, continuous flight auger piles, and vibro concrete columns. The second tier, which holds 55,000 seats, is 315 metres long, 256 metres wide, and 60 metres high. The stadium is built using nearly four times less steel, approximately 10,700 tons, in the structure than that of the Olympic Stadium in Beijing for the 2008 Olympics. In addition to the minimal use of steel, which makes it 75 percent lighter, the stadium also uses high-yield large diameter pipes which were surplus on completion of North Sea Gas pipeline projects, recycled granite, and many of the building products were transported using trains and barges rather than by lorry.

Elsa wanted to celebrate Nell's first birthday with a trip to the Brooklands Concorde (not suitable for under twos).

This is the shot for the month of August. I know I've been posting less and less on flickr but with Dawn of Bubbles and other stuff, I've been busy.

 

I'm still shooting regularly and I think I've been improving my post-processing recently. I'm feeling inspired about photography these days. I'm hoping to get some time in October to do some other photography work (purely about the photography).

 

Meanwhile, I've been testing 500px and I love their UI. I'm not switching to 500px exclusively though. I love flick. 500px is simple and sexy but it's lacking some important features.

The Basketball Arena has 12,000 seats for Olympic basketball and the semi-finals and finals of the Olympic handball, and 10,000 for Paralympic wheelchair basketball and wheelchair rugby. The arena was also used as a holding area for athletes during the Opening and Closing Ceremonies of the games. Concept designs by Wilkinson Eyre Architects were agreed in June 2008 and a planning application was submitted in November 2008. It is a temporary venue, and the largest built for any Games. The possibility of subsequently deconstructing the arena and transporting it to Rio de Janeiro for the 2016 Summer Olympics was discussed, though the plan has been shelved due to doubts from some Brazilian officials about its feasibility.

 

The Olympic Park, in London, United Kingdom, is a sporting complex built for the 2012 Summer Olympics and the 2012 Summer Paralympics, situated to the east of the city adjacent to the Stratford City development. It contains the athletes' Olympic Village and several of the sporting venues including the Olympic Stadium and London Aquatics Centre, besides the London Olympics Media Centre. The park is overlooked by the ArcelorMittal Orbit, an observation tower and Britain's largest piece of public art. After the Olympics, the park is to be known as Queen Elizabeth Olympic Park, to commemorate the Diamond Jubilee of Elizabeth II, though it will not be an official Royal Park of London.

 

London's Olympic and Paralympic bid proposed that there would be four indoor arenas in the park in addition to the main venues, but the revised master plan published in 2006 reduced this to three, with the volleyball events moved to the Earls Court Exhibition Centre. The fencing arena was also cancelled, with the fencing events taking place at ExCeL London. The remaining indoor arenas are the Basketball Arena and the Copper Box, in addition to the Water Polo Arena, the Aquatics Centre, and the Velopark. The final design of the park was approved by the Olympic Delivery Authority and its planning-decisions committee.

There's a slightly out of focus shot of Flavie's unfocused look. I thought it was fitting. It's also a good excuse for not having her eyes tack sharp.

Women's 200m - T53 final, won by Lisha Huang of China in 29.18 seconds.

 

The Olympic Stadium in Olympic Park in Stratford, London, England was the centrepiece of the 2012 London Olympics, the last stop in the 2012 Olympics torch relay, and the venue of the athletic events as well as the opening and closing ceremonies. It was the central venue of the 2012 London Paralympics.

 

It is located at Marshgate Lane in London's Stratford district in the Lower Lea Valley. The stadium has a capacity of 80,000, making it the third-largest stadium in England behind Wembley Stadium and Twickenham Stadium.

 

The stadium's track and field arena is excavated out of the soft clay found on the site, around which is permanent seating for 25,000, built using concrete "rakers". The natural slope of the land is incorporated into the design, with warm-up and changing areas dug into a semi-basement position at the lower end. Spectators enter the stadium via a podium level, which is level with the top of the permanent seating bowl. A demountable lightweight steel and concrete upper tier is built up from this "bowl" to accommodate a further 55,000 spectators.

 

The stadium is made up of different tiers; during the games the stadium was able to hold 80,000 spectators. The base tier, which will be permanent and allow for 25,000 seats, is a sunken elliptical bowl that is made up of low-carbon-dioxide concrete; this contains 40 percent less embodied carbon than conventional concrete. The foundation of the base level is 5,000 piles reaching up to 20 metres deep. From there, there is a mixture of driven cast in situ piles, continuous flight auger piles, and vibro concrete columns. The second tier, which holds 55,000 seats, is 315 metres long, 256 metres wide, and 60 metres high. The stadium is built using nearly four times less steel, approximately 10,700 tons, in the structure than that of the Olympic Stadium in Beijing for the 2008 Olympics. In addition to the minimal use of steel, which makes it 75 percent lighter, the stadium also uses high-yield large diameter pipes which were surplus on completion of North Sea Gas pipeline projects, recycled granite, and many of the building products were transported using trains and barges rather than by lorry.

In 1991 Morton purchased the North American Salt Company plant near Grantsville, Utah. Using 15,000 acres of evaporation ponds, Morton continues to produce and distribute varying grades of salt for human and livestock consumption, water softening, and deicing.

  

Women's 200m - T44 final, Great Britains Stef Reid.

 

The Olympic Stadium in Olympic Park in Stratford, London, England was the centrepiece of the 2012 London Olympics, the last stop in the 2012 Olympics torch relay, and the venue of the athletic events as well as the opening and closing ceremonies. It was the central venue of the 2012 London Paralympics.

 

It is located at Marshgate Lane in London's Stratford district in the Lower Lea Valley. The stadium has a capacity of 80,000, making it the third-largest stadium in England behind Wembley Stadium and Twickenham Stadium.

 

The stadium's track and field arena is excavated out of the soft clay found on the site, around which is permanent seating for 25,000, built using concrete "rakers". The natural slope of the land is incorporated into the design, with warm-up and changing areas dug into a semi-basement position at the lower end. Spectators enter the stadium via a podium level, which is level with the top of the permanent seating bowl. A demountable lightweight steel and concrete upper tier is built up from this "bowl" to accommodate a further 55,000 spectators.

 

The stadium is made up of different tiers; during the games the stadium was able to hold 80,000 spectators. The base tier, which will be permanent and allow for 25,000 seats, is a sunken elliptical bowl that is made up of low-carbon-dioxide concrete; this contains 40 percent less embodied carbon than conventional concrete. The foundation of the base level is 5,000 piles reaching up to 20 metres deep. From there, there is a mixture of driven cast in situ piles, continuous flight auger piles, and vibro concrete columns. The second tier, which holds 55,000 seats, is 315 metres long, 256 metres wide, and 60 metres high. The stadium is built using nearly four times less steel, approximately 10,700 tons, in the structure than that of the Olympic Stadium in Beijing for the 2008 Olympics. In addition to the minimal use of steel, which makes it 75 percent lighter, the stadium also uses high-yield large diameter pipes which were surplus on completion of North Sea Gas pipeline projects, recycled granite, and many of the building products were transported using trains and barges rather than by lorry.

The Basketball Arena has 12,000 seats for Olympic basketball and the semi-finals and finals of the Olympic handball, and 10,000 for Paralympic wheelchair basketball and wheelchair rugby. The arena was also used as a holding area for athletes during the Opening and Closing Ceremonies of the games. Concept designs by Wilkinson Eyre Architects were agreed in June 2008 and a planning application was submitted in November 2008. It is a temporary venue, and the largest built for any Games. The possibility of subsequently deconstructing the arena and transporting it to Rio de Janeiro for the 2016 Summer Olympics was discussed, though the plan has been shelved due to doubts from some Brazilian officials about its feasibility.

 

The Olympic Park, in London, United Kingdom, is a sporting complex built for the 2012 Summer Olympics and the 2012 Summer Paralympics, situated to the east of the city adjacent to the Stratford City development. It contains the athletes' Olympic Village and several of the sporting venues including the Olympic Stadium and London Aquatics Centre, besides the London Olympics Media Centre. The park is overlooked by the ArcelorMittal Orbit, an observation tower and Britain's largest piece of public art. After the Olympics, the park is to be known as Queen Elizabeth Olympic Park, to commemorate the Diamond Jubilee of Elizabeth II, though it will not be an official Royal Park of London.

 

London's Olympic and Paralympic bid proposed that there would be four indoor arenas in the park in addition to the main venues, but the revised master plan published in 2006 reduced this to three, with the volleyball events moved to the Earls Court Exhibition Centre. The fencing arena was also cancelled, with the fencing events taking place at ExCeL London. The remaining indoor arenas are the Basketball Arena and the Copper Box, in addition to the Water Polo Arena, the Aquatics Centre, and the Velopark. The final design of the park was approved by the Olympic Delivery Authority and its planning-decisions committee.

The London Velopark is a cycling centre in Leyton in east London. It was one of the permanent Olympic and Paralympic venues for the 2012 Summer Olympics. The Velopark is at the northern end of Olympic Park. It has a velodrome and BMX racing track, which have been used for the Games, as well as a one-mile (1.6 km) road course and a mountain bike track.

 

The Olympic Park, in London, United Kingdom, is a sporting complex built for the 2012 Summer Olympics and the 2012 Summer Paralympics, situated to the east of the city adjacent to the Stratford City development. It contains the athletes' Olympic Village and several of the sporting venues including the Olympic Stadium and London Aquatics Centre, besides the London Olympics Media Centre. The park is overlooked by the ArcelorMittal Orbit, an observation tower and Britain's largest piece of public art. After the Olympics, the park is to be known as Queen Elizabeth Olympic Park, to commemorate the Diamond Jubilee of Elizabeth II, though it will not be an official Royal Park of London.

 

London's Olympic and Paralympic bid proposed that there would be four indoor arenas in the park in addition to the main venues, but the revised master plan published in 2006 reduced this to three, with the volleyball events moved to the Earls Court Exhibition Centre. The fencing arena was also cancelled, with the fencing events taking place at ExCeL London. The remaining indoor arenas are the Basketball Arena and the Copper Box, in addition to the Water Polo Arena, the Aquatics Centre, and the Velopark. The final design of the park was approved by the Olympic Delivery Authority and its planning-decisions committee.

The London Aquatics Centre is an indoor facility with two 50-metre (160-foot) swimming pools and a 25-metre (82-foot) diving pool in Olympic Park at Stratford, London, it was one of the main venues of the 2012 Summer Olympics and the 2012 Summer Paralympics. The centre was used for the swimming, diving and synchronised swimming events. After significant modification the centre is due to open to the public in 2014. The steel roof weighs 3,200 tonnes. The three pools hold around 10 million litres (2.6 million gallons) of water. During the games the venue will have a capacity of 17,500. The two temporary "wings" will be removed post-games reducing the capacity to a regular 2,500, with an additional 1,000 seats available for major events. Of all the swimming venues built for the 2012 Summer Olympics, the Aquatics Centre is the only one that will remain afterwards, albeit in a downsized form.

No one is sitting down, everyone is awaiting the main event the Mens 100 metre T44 final.

 

The Olympic Stadium in Olympic Park in Stratford, London, England was the centrepiece of the 2012 London Olympics, the last stop in the 2012 Olympics torch relay, and the venue of the athletic events as well as the opening and closing ceremonies. It was the central venue of the 2012 London Paralympics.

 

It is located at Marshgate Lane in London's Stratford district in the Lower Lea Valley. The stadium has a capacity of 80,000, making it the third-largest stadium in England behind Wembley Stadium and Twickenham Stadium.

 

The stadium's track and field arena is excavated out of the soft clay found on the site, around which is permanent seating for 25,000, built using concrete "rakers". The natural slope of the land is incorporated into the design, with warm-up and changing areas dug into a semi-basement position at the lower end. Spectators enter the stadium via a podium level, which is level with the top of the permanent seating bowl. A demountable lightweight steel and concrete upper tier is built up from this "bowl" to accommodate a further 55,000 spectators.

 

The stadium is made up of different tiers; during the games the stadium was able to hold 80,000 spectators. The base tier, which will be permanent and allow for 25,000 seats, is a sunken elliptical bowl that is made up of low-carbon-dioxide concrete; this contains 40 percent less embodied carbon than conventional concrete. The foundation of the base level is 5,000 piles reaching up to 20 metres deep. From there, there is a mixture of driven cast in situ piles, continuous flight auger piles, and vibro concrete columns. The second tier, which holds 55,000 seats, is 315 metres long, 256 metres wide, and 60 metres high. The stadium is built using nearly four times less steel, approximately 10,700 tons, in the structure than that of the Olympic Stadium in Beijing for the 2008 Olympics. In addition to the minimal use of steel, which makes it 75 percent lighter, the stadium also uses high-yield large diameter pipes which were surplus on completion of North Sea Gas pipeline projects, recycled granite, and many of the building products were transported using trains and barges rather than by lorry.

I thought of using the same background as week 96 since it's nice and clean and allows for a contrast in the other elements between the two shots.

 

One contrast being that she's still a bit older now and the other being the difference in clothing (or seasons, if you will).

 

I still prefer week 96 but I still like the minimalist background and light setup required (only natural light from the window to the right...except that I have to be careful not to be too near the artificial light from the left that screws up my white balance).

Efesto's objective is to protect their wares for this reason Efesto's products are , always , packed . *EFESTO , also, remind that even this year will be at PROLIGHT+SOUND (#Frankfurt) which will be held April 4 to 7. #Efesto in Hall 3.0 at the stand A30 presents great news!!!*

It was loud in the Aquatics centre, really loud. These parent have come prepared with ear protectors for their baby though!

 

The London Aquatics Centre is an indoor facility with two 50-metre (160-foot) swimming pools and a 25-metre (82-foot) diving pool in Olympic Park at Stratford, London, it was one of the main venues of the 2012 Summer Olympics and the 2012 Summer Paralympics. The centre was used for the swimming, diving and synchronised swimming events. After significant modification the centre is due to open to the public in 2014. The steel roof weighs 3,200 tonnes. The three pools hold around 10 million litres (2.6 million gallons) of water. During the games the venue will have a capacity of 17,500. The two temporary "wings" will be removed post-games reducing the capacity to a regular 2,500, with an additional 1,000 seats available for major events. Of all the swimming venues built for the 2012 Summer Olympics, the Aquatics Centre is the only one that will remain afterwards, albeit in a downsized form.

This week is going to be the last photo of 52 weeks of Flavie. I started this as a side-project to my own 52 weeks but then, it became my main project for quite some time.

 

I really wanted to start a new photo project but I was having a hard time juggling with everything and I didn't feel like I had enough time to do that many things while keeping a certain quality to it. So, I simply decided to stop this project.

 

The goal is to allow me to concentrate on another project and get a little bit more creative with that one.

 

That said, I won't be completely stopping. This will get a sequel as 26 weeks of Flavie or 12 months of Flavie. I'm still undecided but my next shot will contain the details of the new incarnation.

 

Stay tuned.

The London Velopark is a cycling centre in Leyton in east London. It was one of the permanent Olympic and Paralympic venues for the 2012 Summer Olympics. The Velopark is at the northern end of Olympic Park. It has a velodrome and BMX racing track, which have been used for the Games, as well as a one-mile (1.6 km) road course and a mountain bike track.

 

The Olympic Park, in London, United Kingdom, is a sporting complex built for the 2012 Summer Olympics and the 2012 Summer Paralympics, situated to the east of the city adjacent to the Stratford City development. It contains the athletes' Olympic Village and several of the sporting venues including the Olympic Stadium and London Aquatics Centre, besides the London Olympics Media Centre. The park is overlooked by the ArcelorMittal Orbit, an observation tower and Britain's largest piece of public art. After the Olympics, the park is to be known as Queen Elizabeth Olympic Park, to commemorate the Diamond Jubilee of Elizabeth II, though it will not be an official Royal Park of London.

 

London's Olympic and Paralympic bid proposed that there would be four indoor arenas in the park in addition to the main venues, but the revised master plan published in 2006 reduced this to three, with the volleyball events moved to the Earls Court Exhibition Centre. The fencing arena was also cancelled, with the fencing events taking place at ExCeL London. The remaining indoor arenas are the Basketball Arena and the Copper Box, in addition to the Water Polo Arena, the Aquatics Centre, and the Velopark. The final design of the park was approved by the Olympic Delivery Authority and its planning-decisions committee.

Hemis gompa. Once every 12 years. Once is enouth for me...

The Olympic Park, in London, United Kingdom, is a sporting complex built for the 2012 Summer Olympics and the 2012 Summer Paralympics, situated to the east of the city adjacent to the Stratford City development. It contains the athletes' Olympic Village and several of the sporting venues including the Olympic Stadium and London Aquatics Centre, besides the London Olympics Media Centre. The park is overlooked by the ArcelorMittal Orbit, an observation tower and Britain's largest piece of public art. After the Olympics, the park is to be known as Queen Elizabeth Olympic Park, to commemorate the Diamond Jubilee of Elizabeth II, though it will not be an official Royal Park of London.

 

London's Olympic and Paralympic bid proposed that there would be four indoor arenas in the park in addition to the main venues, but the revised master plan published in 2006 reduced this to three, with the volleyball events moved to the Earls Court Exhibition Centre. The fencing arena was also cancelled, with the fencing events taking place at ExCeL London. The remaining indoor arenas are the Basketball Arena and the Copper Box, in addition to the Water Polo Arena, the Aquatics Centre, and the Velopark. The final design of the park was approved by the Olympic Delivery Authority and its planning-decisions committee.

Paralympic gold medalist Hannah Cockroft (left) and Melissa Nicholls complete a victory lap for the crowd, recieving a standing ovation and continuous applause.

 

The Olympic Stadium in Olympic Park in Stratford, London, England was the centrepiece of the 2012 London Olympics, the last stop in the 2012 Olympics torch relay, and the venue of the athletic events as well as the opening and closing ceremonies. It was the central venue of the 2012 London Paralympics.

 

It is located at Marshgate Lane in London's Stratford district in the Lower Lea Valley. The stadium has a capacity of 80,000, making it the third-largest stadium in England behind Wembley Stadium and Twickenham Stadium.

 

The stadium's track and field arena is excavated out of the soft clay found on the site, around which is permanent seating for 25,000, built using concrete "rakers". The natural slope of the land is incorporated into the design, with warm-up and changing areas dug into a semi-basement position at the lower end. Spectators enter the stadium via a podium level, which is level with the top of the permanent seating bowl. A demountable lightweight steel and concrete upper tier is built up from this "bowl" to accommodate a further 55,000 spectators.

 

The stadium is made up of different tiers; during the games the stadium was able to hold 80,000 spectators. The base tier, which will be permanent and allow for 25,000 seats, is a sunken elliptical bowl that is made up of low-carbon-dioxide concrete; this contains 40 percent less embodied carbon than conventional concrete. The foundation of the base level is 5,000 piles reaching up to 20 metres deep. From there, there is a mixture of driven cast in situ piles, continuous flight auger piles, and vibro concrete columns. The second tier, which holds 55,000 seats, is 315 metres long, 256 metres wide, and 60 metres high. The stadium is built using nearly four times less steel, approximately 10,700 tons, in the structure than that of the Olympic Stadium in Beijing for the 2008 Olympics. In addition to the minimal use of steel, which makes it 75 percent lighter, the stadium also uses high-yield large diameter pipes which were surplus on completion of North Sea Gas pipeline projects, recycled granite, and many of the building products were transported using trains and barges rather than by lorry.

This is the one for May. I decided to go with a simpler, safer type of shot. I'm getting old, it seems.

The stone for the project was shipped piece by piece from India, where craftsmen had sculptured it into more than 500 designs including rosettes, leaves, feathers and lacy geometric patterns. The thousands of sections, ranging from five ounces to five tons, each with its own bar code, have been assembled like a giant jigsaw puzzle based on instructions for religious buildings written into scripture thousands of years old.

 

Although the engineers said they had not counted the number of pieces they used, a mandir in London that served as a model for the Lilburn building required more than 26,000 individual parts.

 

The price tag for the project, $19 million, has been kept down by the thousands of hours of volunteer labor donated by congregants of the BAPS Swaminarayan temple in Clarkston, Ga., who will move from a converted skating rink when the temple is completed in August. For more than two years homemakers and retirees have been polishing the stonework by hand and cooking for the construction workers. Hundreds of volunteers installed more than 50,000 plants for the landscaping.

  

📷 sony cybershot dsc-t70

📍itapoá, sc

2013 won't go down in history as the best carolling shot but one has the be the worst for others to stand out, won't you say?

 

But really, I blame it on bad light.

1 2 ••• 17 18 20 22 23 ••• 79 80