View allAll Photos Tagged officespaces
This March at New Village the following major construction items were underway:
Building #1 and #2 – Courtyard Planter construction on exterior and on interior doing paint touch ups, final inspections and cleaning in advance of April 1 Tenant Move In.
Building #5 – Painting, Tile, Flooring installation and completion of exterior brick façade
Building #3 – Drywall and spackle operations, painting and floor tile, brick façade installation and siding installation
Building #4 – Mechanical, Electrical and Plumbing Rough In, Exterior siding installation
Sitework – finishing curb and sidewalk installations and brick paver installation has started. Preparations being made for final level of asphalt paving.
www.propworld.in/officespace/commercial-office-space-leas...
Prop World -9911004272- Find IT and commercial office space in Noida on rent,rented property for sale in noida,commercial office space for lease team of professionals from the industry specializing in office space rentals.
TRITEC acquired 135 Engineers Road, a 65,000 square foot industrial building and converted it to 55,000 sf of office space in the in the Hauppauge Industrial Park. This photograph features the Avnet Suite and was taken by Steve Geraci of Reflex Photo.
The building was developed constructed and is currently managed by TRITEC a limited amount of space is still available.
The New Village at Patchogue project has progressed nicely beyond 90% of all subgrade structural features and about 60% of the elevated structural post-tension slab work is completed or in progress. Building 1 spearheads the vertical rise with two levels currently framed and Masonry construction rising above the wood framing. Building 2 will under way with its first floor of wood framing by the end of April 2013. Mechanical, Electrical and Plumbing trades have been coordinating with ongoing structural components in all buildings as the system installation needs progress, and installation of roughed out systems in sub grade and framed units is well under way.
External site improvements are partially placed while the installation of a major portion of subgrade sewer, power, communication and drainage systems that will serve the project are scheduled to commence shortly. By the end of May, the last section of connecting structural slab is expected at the crossover to Havens Avenue opposite Jennings and will complete the footprint for vertical construction at buildings 1, 2, 3 and 5. Building 4 is scheduled to start excavation at West side of the site (on Main Street) to make way for the foundation at the last structure in the project.
Photo by Matt Koroulis,
Camera: Pentax ZX-60,
Film: Kodak Tmax 400 Black & White 35mm,
Developed and scanned at Panda Lab in Seattle.
Man destroys computer. Screen shot from a video which originated sometime in the 1990's. See this hilarious video on my blog: jesseddy.com/blog/?p=73
New Village at Patchogue elevation on Building 1 is nearly complete, the siding and roofing details, along with the start of brick veneer, are substantially complete. Building 2 is nearing the same progress as Building 5 whereby roofing sheathing is capping the building. Buildings 2 and 5 are ready for roofing. Buildings 3 has started the installation of 2nd floor panels along with the rise of masonry shafts at stairs and elevators. Building 4 has completed the last of the structural elevated slabs on the projects and panels are laid out and ready for installation.
Site Sewer and storm drainage is largely completed. Subsurface vaults are set at all 6 locations and make way for the redirection of power and communication services.
Interior trades are completing roughing at plumbing, electric, fire sprinkler and HVAC while sheetrock, and interior finishes follow behind.
Progressive accomplishments will be evident within the next month or two where Buildings 3 and 4 will present vertical accomplishment in the framed state. Additionally, the project will soon have external sidewalk, asphalt and curb definitions within the project site layout. LIPA will be moving toward providing a form of permanent power and interior spaces will be achieving a more refined finish.
New Village at Patchogue project has almost completed construction of all structures in their vertical rise. Roof trusses are topping off Buildings 3 and 4 to the West while Buildings 2, 1, and 5 are fully roofed. Siding systems at Buildings 2 and 1 are very far along with trim details at Decks being completed. The building elevations present many different features and with much in place, the true charm of the buildings is becoming evident.
Exterior site features are being prepared to accommodate parking lot, sidewalk and landscape features and interior features are becoming a primary focus in the move toward completed buildings.
Exterior Brick and Stone are commencing at Building 5 while these features are nearing completion already at Buildings 1 and 2.
The interior of Building 1 is being trimmed, painted and tiled with cabinetry and floorcovering features moving forward as well. Building 2 is currently being sheetrocked and similar progress is soon to follow at Building 5.
Opeted office space for your start up at prestige jindal city for more information visit @ www.prestigejindal.indiahomes.estate/
Looking for a service office other then 55 market street? We have an extensive list available in our network. Located within the CBD or at the fringe. If conventional office space is more suitable for your business requirement, we have vacant units all over
Singapore ready for a seamless transition . Do kindly contact Stanley Wong @ 90691184 for more details and availability.
www.propworld.in/officespace/commercial-office-space-leas...
Prop World -9911004272- Find IT and commercial office space in Noida on rent,rented property for sale in noida,commercial office space for lease team of professionals from the industry specializing in office space rentals.
This March at New Village the following major construction items were underway:
Building #1 and #2 – Courtyard Planter construction on exterior and on interior doing paint touch ups, final inspections and cleaning in advance of April 1 Tenant Move In.
Building #5 – Painting, Tile, Flooring installation and completion of exterior brick façade
Building #3 – Drywall and spackle operations, painting and floor tile, brick façade installation and siding installation
Building #4 – Mechanical, Electrical and Plumbing Rough In, Exterior siding installation
Sitework – finishing curb and sidewalk installations and brick paver installation has started. Preparations being made for final level of asphalt paving.
This aerial photograph represents construction progress for the New Village project, a 291 unit mixed-use development, as of December 14, of 2012. The phase of the project includes the site and concrete foundation development progressing at Buildings 3, 5, and 1 which are the Westerly most and Easterly most portions of the structure. Structural mat slabs, ramps and perimeter foundation walls are progressing at the Building's 5 and 1 located along the East side of the site. The entire mat slab and perimeter foundation is complete at Building 3 along the West side of the site and the post tension elevated slab is 80 % complete at the same Building. The sub grade structure is being excavated for Building 2 (at center of site) and the subsurface waterproofing membrane is being installed at spread footing locations. Additional scope that is progressing at this time includes the Mechanical, Electrical and Plumbing scope that is being installed within and below slabs.
Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.
Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.
Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.
Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.
Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.
Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.
Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.
#Entrepreneurs and #startup #businessowners do like to have #shared_officespace in Mumbai. Now you can get #Coworkingspace under hourly #officerental in Mumbai.
Visit www.themosaic.in/price-and-benefites.html to know of #coworkingpackages in detail.
This March at New Village the following major construction items were underway:
Building #1 and #2 – Courtyard Planter construction on exterior and on interior doing paint touch ups, final inspections and cleaning in advance of April 1 Tenant Move In.
Building #5 – Painting, Tile, Flooring installation and completion of exterior brick façade
Building #3 – Drywall and spackle operations, painting and floor tile, brick façade installation and siding installation
Building #4 – Mechanical, Electrical and Plumbing Rough In, Exterior siding installation
Sitework – finishing curb and sidewalk installations and brick paver installation has started. Preparations being made for final level of asphalt paving.
This aerial photograph represents construction progress for the New Village project, a 291 unit mixed-use development, as of December 14, of 2012. The phase of the project includes the site and concrete foundation development progressing at Buildings 3, 5, and 1 which are the Westerly most and Easterly most portions of the structure. Structural mat slabs, ramps and perimeter foundation walls are progressing at the Building's 5 and 1 located along the East side of the site. The entire mat slab and perimeter foundation is complete at Building 3 along the West side of the site and the post tension elevated slab is 80 % complete at the same Building. The sub grade structure is being excavated for Building 2 (at center of site) and the subsurface waterproofing membrane is being installed at spread footing locations. Additional scope that is progressing at this time includes the Mechanical, Electrical and Plumbing scope that is being installed within and below slabs.
New Village at Patchogue elevation on Building 1 is nearly complete, the siding and roofing details, along with the start of brick veneer, are substantially complete. Building 2 is nearing the same progress as Building 5 whereby roofing sheathing is capping the building. Buildings 2 and 5 are ready for roofing. Buildings 3 has started the installation of 2nd floor panels along with the rise of masonry shafts at stairs and elevators. Building 4 has completed the last of the structural elevated slabs on the projects and panels are laid out and ready for installation.
Site Sewer and storm drainage is largely completed. Subsurface vaults are set at all 6 locations and make way for the redirection of power and communication services.
Interior trades are completing roughing at plumbing, electric, fire sprinkler and HVAC while sheetrock, and interior finishes follow behind.
Progressive accomplishments will be evident within the next month or two where Buildings 3 and 4 will present vertical accomplishment in the framed state. Additionally, the project will soon have external sidewalk, asphalt and curb definitions within the project site layout. LIPA will be moving toward providing a form of permanent power and interior spaces will be achieving a more refined finish.
New Village at Patchogue elevation on Building 1 is nearly complete, the siding and roofing details, along with the start of brick veneer, are substantially complete. Building 2 is nearing the same progress as Building 5 whereby roofing sheathing is capping the building. Buildings 2 and 5 are ready for roofing. Buildings 3 has started the installation of 2nd floor panels along with the rise of masonry shafts at stairs and elevators. Building 4 has completed the last of the structural elevated slabs on the projects and panels are laid out and ready for installation.
Site Sewer and storm drainage is largely completed. Subsurface vaults are set at all 6 locations and make way for the redirection of power and communication services.
Interior trades are completing roughing at plumbing, electric, fire sprinkler and HVAC while sheetrock, and interior finishes follow behind.
Progressive accomplishments will be evident within the next month or two where Buildings 3 and 4 will present vertical accomplishment in the framed state. Additionally, the project will soon have external sidewalk, asphalt and curb definitions within the project site layout. LIPA will be moving toward providing a form of permanent power and interior spaces will be achieving a more refined finish.
Spent all of yesterday/last night cleaning and reorganizing my home office. This is what it looked like 2 years ago.Thought I'd take new pics with natural light and a better camera ;)