View allAll Photos Tagged officespaces

Residents of Galveston Island are presented with a lifestyle that most people dream about, but are rarely lucky enough to experience in their lifetime.

 

With the perfect blend of vibrant energy and quaint charm, downtown Galveston is an ideal setting for those looking to live or work in a historic district that’s accessible, walk-able, and part of history

 

On any given weekend, it's not unusual to see live musical performances in the park, food and wine tastings, nature exhibits or evening ghost tours along the city streets, but it's the true beauty of the Victorian architecture that has been impeccably preserved by Mitchell Historic Properties that gives this area the unique character and ambiance it has become known for today.

 

Recognized for their quality workmanship and the stellar appearance of their buildings, Mitchell Historic Properties has proudly owned and operated commercial and residential properties in downtown Galveston for over 30 years, including one fourth of the buildings in The Strand National Historic Landmark District and Pier 21 along Galveston’s historic harbor.

 

From retail spaces that date as far back as the 1850's, to apartments or lofts with architectural detail that can only be found in historic buildings, Mitchell Historic Properties has what you need.

 

New Village is strategically located at the “Four Corners” of the Village. New Village is a 4.87 acre mixed-use, multi-modal, residential redevelopment bounded by Main Street to the south, North Ocean Avenue to the east, Lake Street to the north and a parcel to the west of Havens Avenue. The site, sitting on a total of 3.28 acres of private land, consists of six parcels surrounding by a 1.68 acre Village parking lot. The project includes reshaping the existing Village property boundary while maintaining the overall acreage and parking count.

The entire project includes 291 residential apartment units and 36,149 square feet of restaurant and retail space. Additionally, the project will have a total of 509 parking spaces screened from the street beneath the residential buildings and in surface lots.

Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.

Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.

 

Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.

 

Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.

Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.

 

Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.

 

Pretty cool prism effect in the office.

Public computer

fast, secure internet

telephone for local or inhouse calls

listing of area shops, and resturants

beverage service including starbucks coffee, pepsi, and coke products, and filtered water

microwave

comfortable seating in front of small plasma

www.youroffice.com/ballantyne

Welcome to my office.

New Village is strategically located at the “Four Corners” of the Village. New Village is a 4.87 acre mixed-use, multi-modal, residential redevelopment bounded by Main Street to the south, North Ocean Avenue to the east, Lake Street to the north and a parcel to the west of Havens Avenue. The site, sitting on a total of 3.28 acres of private land, consists of six parcels surrounding by a 1.68 acre Village parking lot. The project includes reshaping the existing Village property boundary while maintaining the overall acreage and parking count.

The entire project includes 291 residential apartment units and 36,149 square feet of restaurant and retail space. Additionally, the project will have a total of 509 parking spaces screened from the street beneath the residential buildings and in surface lots.

Painting on the walls is one of the new activities I got to experience during a recent visit w/my friends at iFractal.

 

Although I don't work at iFractal, I sometimes wish I did. The atmosphere there is nothing short of a creative oasis. In a corporate world so focused on bottom lines and nearly tone-deaf when it comes to nurturing and retaining talent, Frank, Sarah and the entire crew preach the gospel of smart HR management -- and they practice what they preach.

 

*this photo was taken by the folks at iFractal

 

2

*scratches head*

Public computer

fast, secure internet

telephone for local or inhouse calls

listing of area shops, and resturants

beverage service including starbucks coffee, pepsi, and coke products, and filtered water

microwave

comfortable seating in front of small plasma

 

www.youroffice.com/ballantyne

Another shot of my red Swingline stapler.

www.searchofficespace.com/usa/office-space/7th-avenue-exe...

 

Office Space for rent, Executive Suites to Rent and Serviced Offices - these are the main operation fields of Search Office Space in 7th Avenue, New York.

New Village at Patchogue project has almost completed construction of all structures in their vertical rise. Roof trusses are topping off Buildings 3 and 4 to the West while Buildings 2, 1, and 5 are fully roofed. Siding systems at Buildings 2 and 1 are very far along with trim details at Decks being completed. The building elevations present many different features and with much in place, the true charm of the buildings is becoming evident.

 

Exterior site features are being prepared to accommodate parking lot, sidewalk and landscape features and interior features are becoming a primary focus in the move toward completed buildings.

 

Exterior Brick and Stone are commencing at Building 5 while these features are nearing completion already at Buildings 1 and 2.

 

The interior of Building 1 is being trimmed, painted and tiled with cabinetry and floorcovering features moving forward as well. Building 2 is currently being sheetrocked and similar progress is soon to follow at Building 5.

 

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

 

New Village at Patchogue project has almost completed construction of all structures in their vertical rise. Roof trusses are topping off Buildings 3 and 4 to the West while Buildings 2, 1, and 5 are fully roofed. Siding systems at Buildings 2 and 1 are very far along with trim details at Decks being completed. The building elevations present many different features and with much in place, the true charm of the buildings is becoming evident.

 

Exterior site features are being prepared to accommodate parking lot, sidewalk and landscape features and interior features are becoming a primary focus in the move toward completed buildings.

 

Exterior Brick and Stone are commencing at Building 5 while these features are nearing completion already at Buildings 1 and 2.

 

The interior of Building 1 is being trimmed, painted and tiled with cabinetry and floorcovering features moving forward as well. Building 2 is currently being sheetrocked and similar progress is soon to follow at Building 5.

 

Fully-furnished, properly equipped for the needs of your company, and managed by KMC and partner facilities.

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

 

Future Growth of #coworking spaces in India. #coworkingplace will become the work culture of India. HOW? Visit to know more. goo.gl/cgSY3p

Looking for #coworking_officespace in Mumbai, India? Mosaic offers you the best #amenities you can avail at your #sharedofficespace with Mosaic.

Check the best amenities Mosaic offers under affordable hourly #officerental... www.themosaic.in/price-and-benefites.html

 

Employees from numerous office spaces here at Lingfield Point, Darlington, take full advantage of a rare sunny English day.

In downtown Washington's East End, The Tower Companies and The Lenkin Company turned 1050 K Street—a former parking lot near the old DC Convention Center site—into the beginning of a neighborhood renaissance.

 

This 11-story, 136,000 square-foot LEED Gold boutique office building features the latest techniques in sustainable design—triple-scrubbed indoor air, 100renewable power from wind energy, recaptured runoff and ground water, hi-tech thermal floor-to-floor glass windows that maximize natural light, KONE EcoDisk elevator traction system and a rooftop garden.

 

1050 K Street, Washington DC, Architect: Hickok Cole

Movie posters line the walls visualize remind us of what we're working on, listing the company's current projects as "Coming Soon" and recently completed initiatives as "Now Showing."

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

 

This photo is the desktop after drawing the initial sketch, marking up the lines on the original 4X8' plywood, cutting straight edges, jigsawing curves, applying edge banding, and some sanding!

New Village at Patchogue elevation on Building 1 is nearly complete, the siding and roofing details, along with the start of brick veneer, are substantially complete. Building 2 is nearing the same progress as Building 5 whereby roofing sheathing is capping the building. Buildings 2 and 5 are ready for roofing. Buildings 3 has started the installation of 2nd floor panels along with the rise of masonry shafts at stairs and elevators. Building 4 has completed the last of the structural elevated slabs on the projects and panels are laid out and ready for installation.

 

Site Sewer and storm drainage is largely completed. Subsurface vaults are set at all 6 locations and make way for the redirection of power and communication services.

 

Interior trades are completing roughing at plumbing, electric, fire sprinkler and HVAC while sheetrock, and interior finishes follow behind.

 

Progressive accomplishments will be evident within the next month or two where Buildings 3 and 4 will present vertical accomplishment in the framed state. Additionally, the project will soon have external sidewalk, asphalt and curb definitions within the project site layout. LIPA will be moving toward providing a form of permanent power and interior spaces will be achieving a more refined finish.

 

New Village at Patchogue project has almost completed construction of all structures in their vertical rise. Roof trusses are topping off Buildings 3 and 4 to the West while Buildings 2, 1, and 5 are fully roofed. Siding systems at Buildings 2 and 1 are very far along with trim details at Decks being completed. The building elevations present many different features and with much in place, the true charm of the buildings is becoming evident.

 

Exterior site features are being prepared to accommodate parking lot, sidewalk and landscape features and interior features are becoming a primary focus in the move toward completed buildings.

 

Exterior Brick and Stone are commencing at Building 5 while these features are nearing completion already at Buildings 1 and 2.

 

The interior of Building 1 is being trimmed, painted and tiled with cabinetry and floorcovering features moving forward as well. Building 2 is currently being sheetrocked and similar progress is soon to follow at Building 5.

 

Turnkey Production Office Space Suites from 4 Production Space.

 

Located in Santa Monica, CA.

 

We rent by the day, week, month, or year.

 

Suite D has Private Entrance, Large Open Workspace (can accomodate 5-6 people), A/C, T3 Wi-Fi, Security Alarm with Personal Code, Printer, Fax, Phones and Industrial High Speed Color Copier.

 

Office Space as low as $32/day!

See www.4-ProductionSpace.com for details.

Movie posters line the walls visualize remind us of what we're working on, listing the company's current projects as "Coming Soon" and recently completed initiatives as "Now Showing."

 

Employee names get the credit on each poster.

This March at New Village the following major construction items were underway:

 

Building #1 and #2 – Courtyard Planter construction on exterior and on interior doing paint touch ups, final inspections and cleaning in advance of April 1 Tenant Move In.

 

Building #5 – Painting, Tile, Flooring installation and completion of exterior brick façade

 

Building #3 – Drywall and spackle operations, painting and floor tile, brick façade installation and siding installation

 

Building #4 – Mechanical, Electrical and Plumbing Rough In, Exterior siding installation

 

Sitework – finishing curb and sidewalk installations and brick paver installation has started. Preparations being made for final level of asphalt paving.

 

Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.

 

Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.

 

Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.

 

Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.

 

1 2 ••• 23 24 26 28 29 ••• 79 80