View allAll Photos Tagged officespace

Small office suite available in boutique loft building conveniently located on Broadway in heart of Manhattan's SoHo neighborhood. Space features exposed ceilings, hardwood floors, eastern light/views and is configured with one (1) windowed office, open bullpen. Space measures 1,700 sf and asking rent is $50.00/sf, $7,083/month.

West Valley Building #2, Photo 4

 

Freeport West has commercial office space, commercial warehousing, and shipping locations in West Valley City, Utah.

 

Location:

2475 S 3200 W

West Valley City, Utah

 

Classification:

Warehousing / Shipping

 

Divisible Size (sq.ft.):

44,507

Max. Contiguous Space Available (sq.ft.):

367,874

 

Min. Divisible Space (sq.ft.):

44,507

 

Office Area (sq.ft.):

10,658

 

Click for more information about West Valley Building #2's distribution warehouse space.

 

Freeport West has been developing, leasing and managing commercial industrial space and warehouse distribution centers since 1963. Our diverse inventory includes properties that can be used for industrial, manufacturing, distribution, shipping, warehouse distribution centers, storage (dry space, refrigerated space or cold storage), showroom, office, flex space and even food grade facilities. We are also Certified Commercial Investment Members (CCIM) of the CCIM Institute.

TRITEC acquired 135 Engineers Road, a 65,000 square foot industrial building and converted it to 55,000 sf of office space in the in the Hauppauge Industrial Park. This photograph features the Avnet Suite and was taken by Steve Geraci of Reflex Photo.

 

The building was developed constructed and is currently managed by TRITEC a limited amount of space is still available.

 

I won this red Swingline stapler at a retro-showing of Office Space at a local theater about 5 years ago. I get a smile every time I need to staple somthing.

The Woolen Mill; Kingston, Ontario.

During this phase of construction we are working on:

- Completion of cementitious siding at Building #3

- Progression of cementitious siding at Building #4

- Masonry veneer work at Building #5 is nearing completion on South elevation and progressing on East Elevation

- Interior drywall operations at Buildings #5

- Finishes being installed at Building #2

- Main Utility Connections taking place

- Exterior courtyard planter walls being installed at Building #1

- Archways at N. Ocean being finished

A picture of Hege's new printer (bought it for her as a birthday pressent). Hege working in the background. The printer is a mean machine. It has built in wireless network, so all the computers in the appartment can access it. The built in memory card reader shows up as an external drive on the connected computers. You can scan to any computer in the network. It has IR and bluetooth, so you can print directly from a cellphone.

 

The print quality is just amazing.

A coworker gave me Milton's stapler for Christmas. The bust (minus the hat and sunglasses) was in my office when I moved into the new job; the back says it's Kate Greenaway, but everyone at work calls her The Contessa.

I could tell by the large number of people drifting into the multipurpose room, there'd be leftovers free for the picking this afternoon. The well-groomed predominately young women were there to attend a meeting of a governmental public affairs spokesperson professional organization.

 

Sure enough, about the time I finished up my frozen chicken marsala entree, two four wheel buggies emerged loaded down with still-warm leftovers. I had already eaten, so I just went for the vicarious thrill. I ran upstairs and got my camera.

During this phase of construction on New Village:

 

- All roofing operations were completed.

- Progression of cementitious siding

- Masonry veneer work at Building #5 was in progress

- Interior drywall operations at Buildings #1 and #2

- Finishes being installed at Building #1

 

For more about this project visit www.tritecrealestate.com

Photos of the larger office (available for rent as of December 1st, 2010) at The Network Hub, 422 Richards Street, Third Floor, downtown Vancouver.

These are photos of the C3 Co-Working space at the Cambridge Innovation Center in Cambridge, MA.

Light, bright loft space available in value property on West 30th Street in Chelsea/Penn Plaza submarket. Space features five (5) windows, hardwood floors, exposed ceilings and is configured as "white box". Space measures 1,000 sf and asking rent is $33.00/sf, $2,750/month.

Get out of your office to relax, network with other members, catch up on the market on our 60 inch TV, and have a free cup of coffee.

 

Contact:

David Jakubowski

45 Rockefeller Plaza

at 630 Fifth Avenue

20th Floor

New York, NY 10111

212.918.4832

 

david@rgbc.com

www.rgbc.com

For all of those who think their office space is to small or their computer too slow. This may add some perspective. This office was underground in the Mather Mine Ishpeming, MI.

A larger view of the office space

Greg founder of Tip Network working at the place that has the cheapest rent, Starbucks.

Location, location, location. Where you rent office space can make or break your business. Our office space for rent is furnished, equipped and staffed. Great for professionals and solo-preneurs – focus on what raises revenue and leave the rest to us. Learn more at www.virtualofficestaff.com or call 973-509-4632

  

In case you haven't watched Office Space, this clip will give you an idea what's going on here.

 

www.youtube.com/watch?v=AQzIg0CPW5Q

The New Village at Patchogue project has progressed nicely beyond 90% of all subgrade structural features and about 60% of the elevated structural post-tension slab work is completed or in progress. Building 1 spearheads the vertical rise with two levels currently framed and Masonry construction rising above the wood framing. Building 2 will under way with its first floor of wood framing by the end of April 2013. Mechanical, Electrical and Plumbing trades have been coordinating with ongoing structural components in all buildings as the system installation needs progress, and installation of roughed out systems in sub grade and framed units is well under way.

 

External site improvements are partially placed while the installation of a major portion of subgrade sewer, power, communication and drainage systems that will serve the project are scheduled to commence shortly. By the end of May, the last section of connecting structural slab is expected at the crossover to Havens Avenue opposite Jennings and will complete the footprint for vertical construction at buildings 1, 2, 3 and 5. Building 4 is scheduled to start excavation at West side of the site (on Main Street) to make way for the foundation at the last structure in the project.

 

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

During this phase of construction we are working on:

- Completion of cementitious siding at Building #3

- Progression of cementitious siding at Building #4

- Masonry veneer work at Building #5 is nearing completion on South elevation and progressing on East Elevation

- Interior drywall operations at Buildings #5

- Finishes being installed at Building #2

- Main Utility Connections taking place

- Exterior courtyard planter walls being installed at Building #1

- Archways at N. Ocean being finished

Photos of the larger office (available for rent as of December 1st, 2010) at The Network Hub, 422 Richards Street, Third Floor, downtown Vancouver.

copperstoneclubbiz.com Land O Lakes FL office, conference, meeting rooms for rent daily to full time..

i couldn't resist. the afternoon sunlight made a lovely pattern on the carpet.

Before the big collapse there were many big projects going on in Iceland. One of it was this skyscraper which now stands empty near downtown Reykjavik. There are lot of new building like this around Reykjavik, empty or half finished. Anyone in need of office space?

 

Reykjavik, Iceland. June 2009.

These are photos of the C3 Co-Working space at the Cambridge Innovation Center in Cambridge, MA.

Yes, our people are those types that actually enjoy what they do.

Everything you need for shootin’; a beer and some hand lotion.

Teachers Federal Credit Union chose to open a branch at 31 West Main Street in the heart of TRITEC’s New Village Development

 

The space designed by Joseph T. Matthews Architects and constructed by TRITEC Building Company, Inc. The branch is beautifully appointed incorporating, white wainscoting, wall covering and original brick accents from the 1800’s.

 

When 31 West Main Street was purchased by TRITEC as part of TRITEC's redevelopment in Patchogue the building was indisrepair and in need of major renovations. TRITEC restored the building back to it’s original character replacing the third floor and replicating the original cornice built in 1897. TRITEC has been blending the elements of the original structure into the current design and functionality of the building for our new tenants.

Photos of the larger office (available for rent as of December 1st, 2010) at The Network Hub, 422 Richards Street, Third Floor, downtown Vancouver.

1 2 ••• 34 35 37 39 40 ••• 79 80