View allAll Photos Tagged officespace

The New Village project is reaching another important milestone at the Building 1 structure, whereby roofing, windows and trim details are under way and expected to be completed by mid July. Building 5 is moving through a second level of wood frames panels and trusses atop the podium concrete deck. Building 2 is nearing the same progress as Building 5 where a second level of panels and trusses is moving West toward Building 3. At Buildings 2 & 3, a tremendous milestone marks the completion of the structural concrete deck that not only ties the buildings together, but also provides for the superstructure that supports utilities and the future crossover at Havens and Jennings. Building 3 also presents the completion of much of its West masonry wall where a “green screen” will provide the buildings siding and beauty. Building 4 has emerged from the soil with the footings, piers and frost walls. Columns at Building 3 and 4 are erected to support the final elevated decks for the project. Site Sewer is in place with much of the building storm connections in place. Subsurface vaults are set to make way for the eventual removal of overhead power lines and installation of underground power to the surrounding buildings.

The New Village project is reaching another important milestone at the Building 1 structure, whereby roofing, windows and trim details are under way and expected to be completed by mid July. Building 5 is moving through a second level of wood frames panels and trusses atop the podium concrete deck. Building 2 is nearing the same progress as Building 5 where a second level of panels and trusses is moving West toward Building 3. At Buildings 2 & 3, a tremendous milestone marks the completion of the structural concrete deck that not only ties the buildings together, but also provides for the superstructure that supports utilities and the future crossover at Havens and Jennings. Building 3 also presents the completion of much of its West masonry wall where a “green screen” will provide the buildings siding and beauty. Building 4 has emerged from the soil with the footings, piers and frost walls. Columns at Building 3 and 4 are erected to support the final elevated decks for the project. Site Sewer is in place with much of the building storm connections in place. Subsurface vaults are set to make way for the eventual removal of overhead power lines and installation of underground power to the surrounding buildings.

During this phase of construction on New Village:

 

- All roofing operations were completed.

- Progression of cementitious siding

- Masonry veneer work at Building #5 was in progress

- Interior drywall operations at Buildings #1 and #2

- Finishes being installed at Building #1

 

For more about this project visit www.tritecrealestate.com

New Village at Patchogue project has almost completed construction of all structures in their vertical rise. Roof trusses are topping off Buildings 3 and 4 to the West while Buildings 2, 1, and 5 are fully roofed. Siding systems at Buildings 2 and 1 are very far along with trim details at Decks being completed. The building elevations present many different features and with much in place, the true charm of the buildings is becoming evident.

 

Exterior site features are being prepared to accommodate parking lot, sidewalk and landscape features and interior features are becoming a primary focus in the move toward completed buildings.

 

Exterior Brick and Stone are commencing at Building 5 while these features are nearing completion already at Buildings 1 and 2.

 

The interior of Building 1 is being trimmed, painted and tiled with cabinetry and floorcovering features moving forward as well. Building 2 is currently being sheetrocked and similar progress is soon to follow at Building 5.

 

It is bring your cat(s) to work day. They are not pleased.

The New Village at Patchogue project has emerged into the spring with accomplished milestones that include the completion of the Building 5 elevated structural post-tension slab and the breaking of ground for foundation at Building 4. These two structures will begin the vertical rise along Main Street and will place all of the five buildings in active progress. Building 1 is the Northeast building at the corner of Lake and No. Ocean and is topping out it framed units at the third floor. Building 2 has erected its initial section of the first floor and masonry structures have been completed as some of the stair and elevator shafts. Concrete systems are progressing toward completion of the main structural post-tension slab at the Building 2 & 3 connection and wood systems will follow along that same path. Mechanical, Electrical and Plumbing systems are roughing at framed units.

 

External site work will move toward the installation of sub grade structures and utility distribution conduits to make way for the services that support the project.

 

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

Teachers Federal Credit Union chose to open a branch at 31 West Main Street in the heart of TRITEC’s New Village Development

 

The space designed by Joseph T. Matthews Architects and constructed by TRITEC Building Company, Inc. The branch is beautifully appointed incorporating, white wainscoting, wall covering and original brick accents from the 1800’s.

 

When 31 West Main Street was purchased by TRITEC as part of TRITEC's redevelopment in Patchogue the building was indisrepair and in need of major renovations. TRITEC restored the building back to it’s original character replacing the third floor and replicating the original cornice built in 1897. TRITEC has been blending the elements of the original structure into the current design and functionality of the building for our new tenants.

Nice Office Suite for Rent; split level; two private offices, reception area, vaulted ceiling, private restroom, private decks for each office, nice wooded location, call (360) 556-7703 for inquiries to sublet or assume lease.

During this phase of construction on New Village:

 

- All roofing operations were completed.

- Progression of cementitious siding

- Masonry veneer work at Building #5 was in progress

- Interior drywall operations at Buildings #1 and #2

- Finishes being installed at Building #1

 

For more about this project visit www.tritecrealestate.com

Gavin, part of the research team, creating something out of nothing.

Interior Shot of office space available to rent at 22-24 Cumberland Street, Macclesfield

www.propworld.in/officespace/commercial-office-space-leas...

Prop World -9911004272- Find IT and commercial office space in Noida on rent,rented property for sale in noida,commercial office space for lease team of professionals from the industry specializing in office space rentals.

Move-in condition corner office suite available in boutique, 40th Street property conveniently located steps from Seventh Avenue in the heart of Manhattan's rising Times Square South/Fashion District neighborhood. Space features exposed ceiling, hardwood floors, southern/eastern light/views and is configured with windowed corner office, conference room, open bullpen. Space measures 2,000 sf and asking rent is $35.00/sf, $5,833/month.

These are photos of the C3 Co-Working space at the Cambridge Innovation Center in Cambridge, MA.

Building Construction – Office Space

Photos of the larger office (available for rent as of December 1st, 2010) at The Network Hub, 422 Richards Street, Third Floor, downtown Vancouver.

Doug at work at his next creation.

Welcome to my office.

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

Full time, part time or as you need it office space for rent. Full time office for rental packages come furnished equipped and staff. Virtual office programs allow you to rent office space as you need it and only when you need it. Keep your fixed overhead as low as possible for as long as possible. Great for professionals and solo-preneurs. Learn more at www.virtualofficestaff.com or call 973-509-4632

  

I'm officially changing my name to Milton

During this phase of construction on New Village:

 

- All roofing operations were completed.

- Progression of cementitious siding

- Masonry veneer work at Building #5 was in progress

- Interior drywall operations at Buildings #1 and #2

- Finishes being installed at Building #1

 

For more about this project visit www.tritecrealestate.com

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

Foto Marcel Braire

 

A conference room with a seating capacity of 15.

Get Best Office Space and Coworking Space in Bangalore for Rent. Share Office Solutions Provide Virtual office,Coworking space, Office space for Rent Near me.

Best Office Space for Rent in Bangalore, Ulsoor and Indiranagar. Share Office Solutions Provides Top Quality Office for Rent in Your Budget, Book Visit Today

call us on +91 9739966778 / +91 9008133998

 

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

Spent all of yesterday/last night cleaning and reorganizing my home office. This is what it looked like 2 years ago.Thought I'd take new pics with natural light and a better camera ;)

 

My Mook! (made by My Grey Sky)

I once had this depressing view when I worked in a NYC law firm. I quickly found the EXIT.

1 2 ••• 31 32 34 36 37 ••• 79 80