New Village at Patchogue elevation on Building 1 is nearly complete, the siding and roofing details, along with the start of brick veneer, are substantially complete. Building 2 is nearing the same progress as Building 5 whereby roofing sheathing is capping the building. Buildings 2 and 5 are ready for roofing. Buildings 3 has started the installation of 2nd floor panels along with the rise of masonry shafts at stairs and elevators. Building 4 has completed the last of the structural elevated slabs on the projects and panels are laid out and ready for installation.

 

Site Sewer and storm drainage is largely completed. Subsurface vaults are set at all 6 locations and make way for the redirection of power and communication services.

 

Interior trades are completing roughing at plumbing, electric, fire sprinkler and HVAC while sheetrock, and interior finishes follow behind.

 

Progressive accomplishments will be evident within the next month or two where Buildings 3 and 4 will present vertical accomplishment in the framed state. Additionally, the project will soon have external sidewalk, asphalt and curb definitions within the project site layout. LIPA will be moving toward providing a form of permanent power and interior spaces will be achieving a more refined finish.

 

The latest craze.

Located in a prominent position on the Park Road, and opposite the Metrolink station, Nelson House offers easy access across Altrincham, Salford Quays and central Manchester.

 

Magnus are pleased to announce that there is just one office of 1152 sq ft (10 – 15 person office) currently left at Nelson House

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

 

Hahaha

It's nice to know my coworkers haven't been completely beaten down.

The Howard Hughes Center...Where Amenity Meets Creativity.

The New Village project is reaching another important milestone at the Building 1 structure, whereby roofing, windows and trim details are under way and expected to be completed by mid July. Building 5 is moving through a second level of wood frames panels and trusses atop the podium concrete deck. Building 2 is nearing the same progress as Building 5 where a second level of panels and trusses is moving West toward Building 3. At Buildings 2 & 3, a tremendous milestone marks the completion of the structural concrete deck that not only ties the buildings together, but also provides for the superstructure that supports utilities and the future crossover at Havens and Jennings. Building 3 also presents the completion of much of its West masonry wall where a “green screen” will provide the buildings siding and beauty. Building 4 has emerged from the soil with the footings, piers and frost walls. Columns at Building 3 and 4 are erected to support the final elevated decks for the project. Site Sewer is in place with much of the building storm connections in place. Subsurface vaults are set to make way for the eventual removal of overhead power lines and installation of underground power to the surrounding buildings.

Adam flicks a field goal.

Spent all of yesterday/last night cleaning and reorganizing my home office. This is what it looked like 2 years ago.Thought I'd take new pics with natural light and a better camera ;)

New Village at Patchogue elevation on Building 1 is nearly complete, the siding and roofing details, along with the start of brick veneer, are substantially complete. Building 2 is nearing the same progress as Building 5 whereby roofing sheathing is capping the building. Buildings 2 and 5 are ready for roofing. Buildings 3 has started the installation of 2nd floor panels along with the rise of masonry shafts at stairs and elevators. Building 4 has completed the last of the structural elevated slabs on the projects and panels are laid out and ready for installation.

 

Site Sewer and storm drainage is largely completed. Subsurface vaults are set at all 6 locations and make way for the redirection of power and communication services.

 

Interior trades are completing roughing at plumbing, electric, fire sprinkler and HVAC while sheetrock, and interior finishes follow behind.

 

Progressive accomplishments will be evident within the next month or two where Buildings 3 and 4 will present vertical accomplishment in the framed state. Additionally, the project will soon have external sidewalk, asphalt and curb definitions within the project site layout. LIPA will be moving toward providing a form of permanent power and interior spaces will be achieving a more refined finish.

 

Located in a prominent position on the Park Road, and opposite the Metrolink station, Nelson House offers easy access across Altrincham, Salford Quays and central Manchester.

 

Magnus are pleased to announce that there is just one office of 1152 sq ft (10 – 15 person office) currently left at Nelson House

Located in a prominent position on the Park Road, and opposite the Metrolink station, Nelson House offers easy access across Altrincham, Salford Quays and central Manchester.

 

Magnus are pleased to announce that there is just one office of 1152 sq ft (10 – 15 person office) currently left at Nelson House

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

 

Looking for a service office other then apbc building? We have an extensive list available in our network. Located within the CBD or at the fringe. If conventional office space is more suitable for your business requirement, we have vacant units all over

Singapore ready for a seamless transition . Do kindly contact Stanley Wong @ 90691184 for more details and availability.

New Village is strategically located at the “Four Corners” of the Village. New Village is a 4.87 acre mixed-use, multi-modal, residential redevelopment bounded by Main Street to the south, North Ocean Avenue to the east, Lake Street to the north and a parcel to the west of Havens Avenue. The site, sitting on a total of 3.28 acres of private land, consists of six parcels surrounding by a 1.68 acre Village parking lot. The project includes reshaping the existing Village property boundary while maintaining the overall acreage and parking count.

The entire project includes 291 residential apartment units and 36,149 square feet of restaurant and retail space. Additionally, the project will have a total of 509 parking spaces screened from the street beneath the residential buildings and in surface lots.

During this phase of construction on New Village:

 

- All roofing operations were completed.

- Progression of cementitious siding

- Masonry veneer work at Building #5 was in progress

- Interior drywall operations at Buildings #1 and #2

- Finishes being installed at Building #1

 

For more about this project visit www.tritecrealestate.com

Welcome to my office.

In addition go providing a drop in space for virtual office space users; one of the big things with our office is to create a sense of community for both virtual office clients, home based businesses and in house office space clients. The benefits of networking and mutual support between clients is really amazing. Beyond even just the networking is that many home based businesses miss out on the interactions of a traditional office, so having a central place to network really can give the best of both worlds.

 

www.pbcoffices.com/locations/sanjose.html

Spent all of yesterday/last night cleaning and reorganizing my home office. This is what it looked like 2 years ago.Thought I'd take new pics with natural light and a better camera ;)

I'm the devil, or I'm wearing a scary hockey mask from Kingdom of Loathing that has horns. The Office Space reference is nice.

Your business place, your business partner. Offices, training and conference rooms by the hour, day, week and longer. Corporate Office Centers provides instant, turnkey workplace solutions with flexible terms for your business and budget. Professional reception services. Downtown Los Angeles - 445 Figeuroa - Union Bank Building

Bizhub 28 is a new launch just less then 5 mins away from Kembangan MRT, located along Senang Crescent in the Chai Chee area. This FREEHOLD B2 factory comes with facilities such as pool, gym and BBQ Pit. Every unit comes with loft and an aircon corridor.

 

If this new industrial development does not suit your business requirement and you are still looking for Office space, Commercial or Industrial property in Singapore.We have a massive database available. Kindly contact Stanley Wong at 90691184 or www.officeboy.com for more details. We also have a team specializing in the buy/sell or rent of residential property such as HDB, condo,landed property, executive condominiums and townhouses. We will meet all your requirements on office relocation with an ease of mind.

Playing w/ my new lens at work... yes I have a red swingline stapler, and it rocks.

 

Couldn't decide which stapler shot I liked better.

3CDC has outgrown their current office space and will be moving into this building at the northwest corner of 12th and Walnut. This photo is a handheld HDR that actually turned out fairly decent.

my office desk on a typical monday morning

Shared space available in boutique, suburban coworking environment with stunning light/views of Chicago's skyline. Space options included private offices for 1-3 persons, dedicated desks and/or open coworking seating with daily storage. Space features shared use of conference room, phone rooms, high-speed wifi, printing, copying, scanning, fitness studio, changing rooms, spa-like shower and fully-equipped kitchen. Pricing is as follows: Day Pass - $20.00/day; Coworking Membership - $175.00/10 days month, $300.00/unlimited monthly; Dedicated Desk - $425.00/month; Private Office - $750.00/month (seats 1-3).

Our attempt to recreate an Office Space moment. (For the record, that's not me in the picture. It's my Co-worker, Jerry)

Shipping and drying area

Stephen Root and Gary Cole in person at the AFI

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

During this phase of construction on New Village:

 

- All roofing operations were completed.

- Progression of cementitious siding

- Masonry veneer work at Building #5 was in progress

- Interior drywall operations at Buildings #1 and #2

- Finishes being installed at Building #1

 

For more about this project visit www.tritecrealestate.com

1 2 ••• 30 31 33 35 36 ••• 79 80