New Village at Patchogue elevation on Building 1 is nearly complete, the siding and roofing details, along with the start of brick veneer, are substantially complete. Building 2 is nearing the same progress as Building 5 whereby roofing sheathing is capping the building. Buildings 2 and 5 are ready for roofing. Buildings 3 has started the installation of 2nd floor panels along with the rise of masonry shafts at stairs and elevators. Building 4 has completed the last of the structural elevated slabs on the projects and panels are laid out and ready for installation.

 

Site Sewer and storm drainage is largely completed. Subsurface vaults are set at all 6 locations and make way for the redirection of power and communication services.

 

Interior trades are completing roughing at plumbing, electric, fire sprinkler and HVAC while sheetrock, and interior finishes follow behind.

 

Progressive accomplishments will be evident within the next month or two where Buildings 3 and 4 will present vertical accomplishment in the framed state. Additionally, the project will soon have external sidewalk, asphalt and curb definitions within the project site layout. LIPA will be moving toward providing a form of permanent power and interior spaces will be achieving a more refined finish.

 

Located in a prominent position on the Park Road, and opposite the Metrolink station, Nelson House offers easy access across Altrincham, Salford Quays and central Manchester.

 

Magnus are pleased to announce that there is just one office of 1152 sq ft (10 – 15 person office) currently left at Nelson House

Located in a prominent position on the Park Road, and opposite the Metrolink station, Nelson House offers easy access across Altrincham, Salford Quays and central Manchester.

 

Magnus are pleased to announce that there is just one office of 1152 sq ft (10 – 15 person office) currently left at Nelson House

Looking for a service office other then apbc building? We have an extensive list available in our network. Located within the CBD or at the fringe. If conventional office space is more suitable for your business requirement, we have vacant units all over

Singapore ready for a seamless transition . Do kindly contact Stanley Wong @ 90691184 for more details and availability.

New Village is strategically located at the “Four Corners” of the Village. New Village is a 4.87 acre mixed-use, multi-modal, residential redevelopment bounded by Main Street to the south, North Ocean Avenue to the east, Lake Street to the north and a parcel to the west of Havens Avenue. The site, sitting on a total of 3.28 acres of private land, consists of six parcels surrounding by a 1.68 acre Village parking lot. The project includes reshaping the existing Village property boundary while maintaining the overall acreage and parking count.

The entire project includes 291 residential apartment units and 36,149 square feet of restaurant and retail space. Additionally, the project will have a total of 509 parking spaces screened from the street beneath the residential buildings and in surface lots.

During this phase of construction on New Village:

 

- All roofing operations were completed.

- Progression of cementitious siding

- Masonry veneer work at Building #5 was in progress

- Interior drywall operations at Buildings #1 and #2

- Finishes being installed at Building #1

 

For more about this project visit www.tritecrealestate.com

Welcome to my office.

Nieuwe kantoor units te huur bij Igluu Eindhoven. Kijk op igluu.nl

Foto Marcel Braire

 

#internationalquarter #stratford #westfield #olympicpark #london #architecture #construction

Spent all of yesterday/last night cleaning and reorganizing my home office. This is what it looked like 2 years ago.Thought I'd take new pics with natural light and a better camera ;)

Your business place, your business partner. Offices, training and conference rooms by the hour, day, week and longer. Corporate Office Centers provides instant, turnkey workplace solutions with flexible terms for your business and budget. Professional reception services. Downtown Los Angeles - 445 Figeuroa - Union Bank Building

Playing w/ my new lens at work... yes I have a red swingline stapler, and it rocks.

 

Couldn't decide which stapler shot I liked better.

3CDC has outgrown their current office space and will be moving into this building at the northwest corner of 12th and Walnut. This photo is a handheld HDR that actually turned out fairly decent.

my office desk on a typical monday morning

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

Shared space available in boutique, suburban coworking environment with stunning light/views of Chicago's skyline. Space options included private offices for 1-3 persons, dedicated desks and/or open coworking seating with daily storage. Space features shared use of conference room, phone rooms, high-speed wifi, printing, copying, scanning, fitness studio, changing rooms, spa-like shower and fully-equipped kitchen. Pricing is as follows: Day Pass - $20.00/day; Coworking Membership - $175.00/10 days month, $300.00/unlimited monthly; Dedicated Desk - $425.00/month; Private Office - $750.00/month (seats 1-3).

#internationalquarter #stratford #westfield #olympicpark #london #architecture #construction

Our attempt to recreate an Office Space moment. (For the record, that's not me in the picture. It's my Co-worker, Jerry)

Shipping and drying area

Stephen Root and Gary Cole in person at the AFI

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

During this phase of construction on New Village:

 

- All roofing operations were completed.

- Progression of cementitious siding

- Masonry veneer work at Building #5 was in progress

- Interior drywall operations at Buildings #1 and #2

- Finishes being installed at Building #1

 

For more about this project visit www.tritecrealestate.com

This what my computer sees right after I turn on the light in our office suite and right before I sit down. This image was taken with an iMac.

West Valley Building #2, Photo 3

 

Freeport West offers commercial property throughout the West Valley, Utah area.

 

Location:

2475 S 3200 W

West Valley City, Utah

 

Click for more information about West Valley Building #2's commercial industrial property.

 

Freeport West has been developing, leasing and managing commercial industrial space and warehouse distribution centers since 1963. Our diverse inventory includes properties that can be used for industrial, manufacturing, distribution, shipping, warehouse distribution centers, storage (dry space, refrigerated space or cold storage), showroom, office, flex space and even food grade facilities. We are also Certified Commercial Investment Members (CCIM) of the CCIM Institute.

During this phase of construction on New Village:

 

- All roofing operations were completed.

- Progression of cementitious siding

- Masonry veneer work at Building #5 was in progress

- Interior drywall operations at Buildings #1 and #2

- Finishes being installed at Building #1

 

For more about this project visit www.tritecrealestate.com

This is what happens when I work on Sundays.

 

I go a little bit crazy.

Property and Building

 

This office space is available for rent in a Bandra East residential building. It has a carpet area of 480 square feet. The commercial property is fully furnished and comes with four workstations, four cabins, air conditioners and its own private washroom. This Bandra residential building has a water storage facility. This property is conveniently located within walking distance of Bandra Station and has easy connectivity via road.

 

Bandra Area: Bandra, Khar, Santacruz, Kalina Vile Parle

 

The popularity of residing in Bandra and its surrounding areas makes it one of the best retail locations in Mumbai. As one of the most affluent locations in the city, it is home to many international brand stores, jewellers, night clubs, restaurants, cafes, gyms, salons, etc. If you are interested in opening a retail location in Mumbai, then Bandra, Khar, Santacruz, Kalina Vile Parle should be at the top of your list. The Bandra Area is not only residential and retail-driven, but there are also some of the most premium Mumbai offices spaces in this area. The smaller offices tend to be in Bandra West, Khar West and Santacruz West which usually top out at about 3,000 square feet. However, if your organization is looking for larger (5,000 to over 20,000 square feet) office space, we would recommend Vile Parle, Bandra East, Khar East, Santacruz East Kalina. In terms of connectivity, the Bandra Area is one of the most centrally located areas in Mumbai. To the north is Juhu, Andheri and Powai. To the south is the Sea Link Bridge that connects Bandra to South Mumbai via Worli. The Bandra Area is a short 15 minutes away from the domestic airport and 20-25 minutes away from the international airport.

The New Village project is reaching another important milestone at the Building 1 structure, whereby roofing, windows and trim details are under way and expected to be completed by mid July. Building 5 is moving through a second level of wood frames panels and trusses atop the podium concrete deck. Building 2 is nearing the same progress as Building 5 where a second level of panels and trusses is moving West toward Building 3. At Buildings 2 & 3, a tremendous milestone marks the completion of the structural concrete deck that not only ties the buildings together, but also provides for the superstructure that supports utilities and the future crossover at Havens and Jennings. Building 3 also presents the completion of much of its West masonry wall where a “green screen” will provide the buildings siding and beauty. Building 4 has emerged from the soil with the footings, piers and frost walls. Columns at Building 3 and 4 are erected to support the final elevated decks for the project. Site Sewer is in place with much of the building storm connections in place. Subsurface vaults are set to make way for the eventual removal of overhead power lines and installation of underground power to the surrounding buildings.

Get out of your office to relax, network with other members, catch up on the market on our 60 inch TV, and have a free cup of coffee.

 

Contact:

David Jakubowski

45 Rockefeller Plaza

at 630 Fifth Avenue

20th Floor

New York, NY 10111

212.918.4832

 

david@rgbc.com

www.rgbc.com

Kinna McInroe, Todd Duffey, and Diedrich Bader.

Ideationa and brainstorming in the office.

The New Village project is reaching another important milestone at the Building 1 structure, whereby roofing, windows and trim details are under way and expected to be completed by mid July. Building 5 is moving through a second level of wood frames panels and trusses atop the podium concrete deck. Building 2 is nearing the same progress as Building 5 where a second level of panels and trusses is moving West toward Building 3. At Buildings 2 & 3, a tremendous milestone marks the completion of the structural concrete deck that not only ties the buildings together, but also provides for the superstructure that supports utilities and the future crossover at Havens and Jennings. Building 3 also presents the completion of much of its West masonry wall where a “green screen” will provide the buildings siding and beauty. Building 4 has emerged from the soil with the footings, piers and frost walls. Columns at Building 3 and 4 are erected to support the final elevated decks for the project. Site Sewer is in place with much of the building storm connections in place. Subsurface vaults are set to make way for the eventual removal of overhead power lines and installation of underground power to the surrounding buildings.

The New Village project is reaching another important milestone at the Building 1 structure, whereby roofing, windows and trim details are under way and expected to be completed by mid July. Building 5 is moving through a second level of wood frames panels and trusses atop the podium concrete deck. Building 2 is nearing the same progress as Building 5 where a second level of panels and trusses is moving West toward Building 3. At Buildings 2 & 3, a tremendous milestone marks the completion of the structural concrete deck that not only ties the buildings together, but also provides for the superstructure that supports utilities and the future crossover at Havens and Jennings. Building 3 also presents the completion of much of its West masonry wall where a “green screen” will provide the buildings siding and beauty. Building 4 has emerged from the soil with the footings, piers and frost walls. Columns at Building 3 and 4 are erected to support the final elevated decks for the project. Site Sewer is in place with much of the building storm connections in place. Subsurface vaults are set to make way for the eventual removal of overhead power lines and installation of underground power to the surrounding buildings.

1 2 ••• 30 31 33 35 36 ••• 79 80