Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.

Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.

 

Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.

 

New Village is strategically located at the “Four Corners” of the Village. New Village is a 4.87 acre mixed-use, multi-modal, residential redevelopment bounded by Main Street to the south, North Ocean Avenue to the east, Lake Street to the north and a parcel to the west of Havens Avenue. The site, sitting on a total of 3.28 acres of private land, consists of six parcels surrounding by a 1.68 acre Village parking lot. The project includes reshaping the existing Village property boundary while maintaining the overall acreage and parking count.

The entire project includes 291 residential apartment units and 36,149 square feet of restaurant and retail space. Additionally, the project will have a total of 509 parking spaces screened from the street beneath the residential buildings and in surface lots.

With its rich colors and architectural features, the interior construction of 21,500 square feet of office space for the People’s United Bank Long Island Regional Headquarters creates an elegant space. The space also features a fully automated boardroom and conference rooms with audio/visual systems as well as a 1,200 SF data center that is the hub for all bank operations and includes raised flooring, fully redundant HVAC systems, UPS and generator back up for electric and an FM200 Fire Suppression system.

 

The combination of the rich woods and the steel details creates an environment that is both warm and contemporary.

 

Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.

Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.

 

Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.

 

View of a serviced office Executive Offices Group's Charlest Street London office address.

took some time to clean the office today...

New Village at Patchogue elevation on Building 1 is nearly complete, the siding and roofing details, along with the start of brick veneer, are substantially complete. Building 2 is nearing the same progress as Building 5 whereby roofing sheathing is capping the building. Buildings 2 and 5 are ready for roofing. Buildings 3 has started the installation of 2nd floor panels along with the rise of masonry shafts at stairs and elevators. Building 4 has completed the last of the structural elevated slabs on the projects and panels are laid out and ready for installation.

 

Site Sewer and storm drainage is largely completed. Subsurface vaults are set at all 6 locations and make way for the redirection of power and communication services.

 

Interior trades are completing roughing at plumbing, electric, fire sprinkler and HVAC while sheetrock, and interior finishes follow behind.

 

Progressive accomplishments will be evident within the next month or two where Buildings 3 and 4 will present vertical accomplishment in the framed state. Additionally, the project will soon have external sidewalk, asphalt and curb definitions within the project site layout. LIPA will be moving toward providing a form of permanent power and interior spaces will be achieving a more refined finish.

 

THE MOSAIC redefines the concept of #coworking #officespace by offering a holistic lifestyle that incorporates aspects of #wellness in all its offerings, be it the ambience or the value added services. For more details visit www.themosaic.in

WTC is coming with new commercial project WTC CBD Noida which is located at Noida Sec-132. This commercial project offers retail shop area, office space, and work area. Investment in WTC CBD Noida is a good choice and earn 12% assured return on this commercial project.WTC group is the most trusty real estate organization. WTC CBD is located at an amazing location which is connected via Noida Expressway, FNG Expressway, Yamuna Expressway, and Greater Noida. The amenities are 24 hours electricity backup, swimming pool, gym, sports area,24 hour Security,24 hr maintenance, high-speed elevators, multiple parking and meeting hub, etc. Book now 9560090076.

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

New Village at Patchogue elevation on Building 1 is nearly complete, the siding and roofing details, along with the start of brick veneer, are substantially complete. Building 2 is nearing the same progress as Building 5 whereby roofing sheathing is capping the building. Buildings 2 and 5 are ready for roofing. Buildings 3 has started the installation of 2nd floor panels along with the rise of masonry shafts at stairs and elevators. Building 4 has completed the last of the structural elevated slabs on the projects and panels are laid out and ready for installation.

 

Site Sewer and storm drainage is largely completed. Subsurface vaults are set at all 6 locations and make way for the redirection of power and communication services.

 

Interior trades are completing roughing at plumbing, electric, fire sprinkler and HVAC while sheetrock, and interior finishes follow behind.

 

Progressive accomplishments will be evident within the next month or two where Buildings 3 and 4 will present vertical accomplishment in the framed state. Additionally, the project will soon have external sidewalk, asphalt and curb definitions within the project site layout. LIPA will be moving toward providing a form of permanent power and interior spaces will be achieving a more refined finish.

 

work station with tools for inhouse client use

copier, printer, faxer, scanner

mailboxes

lounge 1

 

www.youroffice.com/ballantyne

www.propworld.in/officespace/commercial-office-space-leas...

Prop World -9911004272- Find IT and commercial office space in Noida on rent,rented property for sale in noida,commercial office space for lease team of professionals from the industry specializing in office space rentals.

Lucky find at Target for some limited #Funko Pop figures to add to my collection. #Toothless #OfficeSpace

New Village is strategically located at the “Four Corners” of the Village. New Village is a 4.87 acre mixed-use, multi-modal, residential redevelopment bounded by Main Street to the south, North Ocean Avenue to the east, Lake Street to the north and a parcel to the west of Havens Avenue. The site, sitting on a total of 3.28 acres of private land, consists of six parcels surrounding by a 1.68 acre Village parking lot. The project includes reshaping the existing Village property boundary while maintaining the overall acreage and parking count.

The entire project includes 291 residential apartment units and 36,149 square feet of restaurant and retail space. Additionally, the project will have a total of 509 parking spaces screened from the street beneath the residential buildings and in surface lots.

 

for more information please visit www.newvillagepatchogue.com

This aerial photograph represents construction progress for the New Village project, a 291 unit mixed-use development, as of December 14, of 2012. The phase of the project includes the site and concrete foundation development progressing at Buildings 3, 5, and 1 which are the Westerly most and Easterly most portions of the structure. Structural mat slabs, ramps and perimeter foundation walls are progressing at the Building's 5 and 1 located along the East side of the site. The entire mat slab and perimeter foundation is complete at Building 3 along the West side of the site and the post tension elevated slab is 80 % complete at the same Building. The sub grade structure is being excavated for Building 2 (at center of site) and the subsurface waterproofing membrane is being installed at spread footing locations. Additional scope that is progressing at this time includes the Mechanical, Electrical and Plumbing scope that is being installed within and below slabs.

Interior Shot of office space available to rent at 22-24 Cumberland Street, Macclesfield

Attractive Lobby area

friendly receptionist to greet your clients

clients can enjoy beverages

comfortable seating

latest newspapers and magazines available

 

www.youroffice.com/ballantyne

Property and Building

 

There must be a reason you are looking at this office space for rent in Andheri East? It just may be that this office on rent in Andheri East will be your future corporate office in Andheri East? Well, if looking for the best office space in Andheri East, we would have you consider this particular office space for rent. It only helps that this office on rent in Andheri East is in a brand new commercial building. This particular office space in Andheri East is unfurnished so one can design and furnish it as per the business's needs where the office on rent in Andheri East has a carpet area of 19,630 square feet and a built up area of 35,700 square feet making it a very spacious office space in Mumbai, let alone Andheri East. The office space in Andheri East is accompanied with private washrooms and is combination of five floors – yes, one can really grow and have one’s corporate offices in Andheri East at this location. Let’s now discuss the other features/amenities of this commercial building in Andheri East, it has a glass facade exterior, full time security, air conditioning, two lifts, reserved car parking, visitor's car parking, power backup, a fire fighting system and water storage. Lastly, this office on rent in Andheri East is right near MIDC Road and Chakala Metro Station which will only make this office space in Andheri East a winner for your staff as we all know commuting in Mumbai is hard enough already!

 

Andheri

 

If looking for commercial office space or retail space in Mumbai, we would consider Andheri. Andheri is just north of Juhu. Like many other localities in Mumbai, the railway line divides Andheri into two parts: east and west.

 

Both Andheri West and Andheri East provide a wide assortment of office spaces. Andheri West is slightly more expensive, and the floor plates are slightly smaller, topping out at about 10,000 square feet. In Andheri East, one can find office floor plates of over 30,000 square feet. The benefits of Andheri are its close proximity to the airport, a large labor force (1.5M people live in Andheri alone) and less expensive rental prices compared to Bandra, Juhu and BKC to the south.

 

Andheri is increasingly becoming a commercial hub supporting a growing number of malls, shops, western restaurants, night clubs, showrooms, bars, gyms, spas, etc. Similar to the office space, retail space in Andheri is less expensive than its neighbors to the south. Within Andheri, the higher end shops and restaurants tend to be located in Andheri West where the prices are slightly more expensive than Andheri East.

 

In terms of connectivity, the international and domestic airports are located in Andheri East, making the commute one of the shortest in the City at 10-20 minutes. Given that the Mumbai Metro Line spans all of Andheri, employees can easily access their place of work. The metro has also made the commute shorter and easier for those residing in the central Mumbai suburbs. The arterial Western Express Highway passes through Andheri, making it well connected by road to Northern and Southern Mumbai suburbs.

Bob Porter: Looks like you've been missing a lot of work lately.

Peter Gibbons: I wouldn't say I've been *missing* it, Bob.

Stephen Root and Gary Cole in person at the AFI

This March at New Village the following major construction items were underway:

 

Building #1 and #2 – Courtyard Planter construction on exterior and on interior doing paint touch ups, final inspections and cleaning in advance of April 1 Tenant Move In.

 

Building #5 – Painting, Tile, Flooring installation and completion of exterior brick façade

 

Building #3 – Drywall and spackle operations, painting and floor tile, brick façade installation and siding installation

 

Building #4 – Mechanical, Electrical and Plumbing Rough In, Exterior siding installation

 

Sitework – finishing curb and sidewalk installations and brick paver installation has started. Preparations being made for final level of asphalt paving.

 

Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.

 

Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.

 

Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.

 

Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.

 

Wearing Mady's hat in the pirate ship.

✔ Total 8 Acres Project Land

✔ Plot Spaces in Multiple Sizes Ranging from 60 Sq.Yd. to 400 Sq.Yd.

✔ G+4 with Basement Construction Approved on the Site

✔ Ground + 4 storey shop cum offices

✔ Shop modules offer flexibility in sizes

✔ Along the Metro corridor

 

His time its exclusive selling point is the blend of both commercial as well as High street open Retail shop and offices.

 

Call Now:- +91-9311495526

The New Village at Patchogue project has emerged into the spring with accomplished milestones that include the completion of the Building 5 elevated structural post-tension slab and the breaking of ground for foundation at Building 4. These two structures will begin the vertical rise along Main Street and will place all of the five buildings in active progress. Building 1 is the Northeast building at the corner of Lake and No. Ocean and is topping out it framed units at the third floor. Building 2 has erected its initial section of the first floor and masonry structures have been completed as some of the stair and elevator shafts. Concrete systems are progressing toward completion of the main structural post-tension slab at the Building 2 & 3 connection and wood systems will follow along that same path. Mechanical, Electrical and Plumbing systems are roughing at framed units.

 

External site work will move toward the installation of sub grade structures and utility distribution conduits to make way for the services that support the project.

 

The New Village project is reaching another important milestone at the Building 1 structure, whereby roofing, windows and trim details are under way and expected to be completed by mid July. Building 5 is moving through a second level of wood frames panels and trusses atop the podium concrete deck. Building 2 is nearing the same progress as Building 5 where a second level of panels and trusses is moving West toward Building 3. At Buildings 2 & 3, a tremendous milestone marks the completion of the structural concrete deck that not only ties the buildings together, but also provides for the superstructure that supports utilities and the future crossover at Havens and Jennings. Building 3 also presents the completion of much of its West masonry wall where a “green screen” will provide the buildings siding and beauty. Building 4 has emerged from the soil with the footings, piers and frost walls. Columns at Building 3 and 4 are erected to support the final elevated decks for the project. Site Sewer is in place with much of the building storm connections in place. Subsurface vaults are set to make way for the eventual removal of overhead power lines and installation of underground power to the surrounding buildings.

Spent all of yesterday/last night cleaning and reorganizing my home office. This is what it looked like 2 years ago.Thought I'd take new pics with natural light and a better camera ;)

Interior Shot of office space available to rent at 22-24 Cumberland Street, Macclesfield

New Village at Patchogue project has almost completed construction of all structures in their vertical rise. Roof trusses are topping off Buildings 3 and 4 to the West while Buildings 2, 1, and 5 are fully roofed. Siding systems at Buildings 2 and 1 are very far along with trim details at Decks being completed. The building elevations present many different features and with much in place, the true charm of the buildings is becoming evident.

 

Exterior site features are being prepared to accommodate parking lot, sidewalk and landscape features and interior features are becoming a primary focus in the move toward completed buildings.

 

Exterior Brick and Stone are commencing at Building 5 while these features are nearing completion already at Buildings 1 and 2.

 

The interior of Building 1 is being trimmed, painted and tiled with cabinetry and floorcovering features moving forward as well. Building 2 is currently being sheetrocked and similar progress is soon to follow at Building 5.

 

Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.

Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.

 

Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.

 

1 2 ••• 27 28 30 32 33 ••• 79 80