View allAll Photos Tagged install

New fret hammered into place.

Installing Observation Dock at Blackacre Nature Conservancy

Two of my coworkers install data aquisition equipment with some of the sensors used at our site.

 

This photo taken on railroad property with permission.

Note, During the install process, you need to leave the protective film on the front to protect the LCD screen and USB ports from getting scuffed.

feat Silvia Cervellin, Sara Poli, Margherita Rubini

The dash on my Toyota Truck. Simple install and looks just like it was new!

Loads of room for massive exhaust headers

a 750kva pad mount in Huntington, NY. Easier and safer than those in a vault, on poles or fenced in. PSEG Long Island.

DURING:

 

In this photo our expert roof technician carefully cuts a hole in the new GAF/ELK Grand Sequoia roof we installed to add the final touch, a new V-Lux Sun tunnel.

Offshore Vessel on the Tyne at the Offshore Technology Park Quay

CONCHAS LAKE, N.M., --

Corps’ staff add temporary steel ramp to extend the single lane ramp at the Corps' Southside boat ramp area in time for the 4th of July weekend!

We used an angle driver to help tighten the screw for the backstrap for rear support

 

Crop, 2011

Installtion of 12,000 stacked pencils topped with acrylic paint on gallery wall

approx. 150 x 150 inches

 

This Flickr Set documents the installation of Myers' Crop, 2011

 

visit exhibition webpage

 

Pelavin Gallery is pleased to announce an exhibition of new work by Timothy Paul Myers, titled The Ontario Ration. In celebration of Pelavin Gallery ’s thirty year anniversary, in January 2011, Myers bases this exhibition on a found business ledger chronicling the last thirty-years of an egg farmer named Myron B. Johnson, circa 1899-1929. This will be Myers first solo exhibition at the gallery.

 

Repetition and the use of unlikely materials—two prominent themes in Myers' work—continue to be displayed in this exhibition, as Myers makes use of hundreds of pages from a thirty-year business ledger of Myron B. Johnson, circa 1899-1929; one-thousand trading cards, circa 1900s-1930s; and one-hundred-thousand stacked pencil pieces individually topped with a single drop of acrylic paint from the artist's palette of over one-hundred-fifty hand-mixed colors.

 

For more information, please visit pelavingallery.com

Window installer is installing an Infinity double hung replacement window.

Precision casted and sculpted keystone set in a brick "Jack Arch". Designed, fabricated, and installed on site.

Installing new boiler

We installed a full front end on this Evo. Full Front Ends aid in diminishing visibility of the clear bra due to all of the edges and corners being wrapped. Since this is not a pre-cut kit we can optimize the protection your paint is receiving. The interior of this Evo will be protected by Prestige's Photosync 75 film - a legal film which can be installed on your vehicle's windshield. The windows had Photosync 35 installed all the way around. The Photosync film is revolutionary in the fact is in a transition film. Within 10-15 minutes of sun exposure the film darkens while also increasing in it's heat rejection capabilities. We then wrapped the front grille's chrome in 3M 1080 matte black vinyl. The interior trim was wrapped carefully in black carbon fiber.

Speed Shield,

Addison Texas,

Clear Bra, Vinyl Wraps

The main septic tank is finally installed! There's still an overflow tank and leach field to install, as well as plumbing hookups to be made, but things are finally underway!

This is an important step to refine your install further, and so you don't ruin your afternoon with a trip to the emergency room, by filing down the exposed metal you'll lessen your chances of getting cut during the final mounting process.

The 'misalignment' of the gearbox output and final drive is a bit disconcerting, but it is right.

Installing vinyl decals for Catholic Charities of Southwest Ohio in Cincinnati

See out blog posts to see the process it took....

 

Pocket Door Blog Posts

 

.

Seen inside mobile clean room to install a LCLS-HE power coupler into a cyromodule at the SRF Test Lab at Jefferson Lab on Dec. 7, 2022. (Photo by Aileen Devlin | Jefferson Lab)

How to set up C/C++ development environment in Eclipse

 

If you would like to use this photo, be sure to place a proper attribution linking to xmodulo.com

I used standard stair railing from Lowe's. Cut some 1x1s to use as standoffs so that fingers can go under the rail.

Metro's line crew at Mount Baker Transit Center. The wire is for the Route 14 extension.

1 2 ••• 14 15 17 19 20 ••• 79 80