View allAll Photos Tagged heavylift
Gaiamare/Meriaura Oy, Turku, Finland
*2008 Gdansk Shiprepair Yard Remontowa S.A.
GT: 3,238 NT: 972 TDW: 5,272mt
L: 101.80m B: 18.80m D: 4.92m
Steel structure/project cargoes : up to 3600mt
Container capacity : 240teu @ 13,5mt
2 x Wärtsilä Diesel 6R32 with PTO, box cooled
max. Output 100% MCR 2 x 2220 kW @ nominal rpm 750 11-12kts
Kieler Förde outbound towed by tug WULF 7 2010/07/20 bound for Rostock
Bonn & Mees, Rotterdam
*2002 DAEWOO MANGALIA HEAVY INDUSTRIES MANGALIA
GT: 3,898
L: 75.00m B: 32.00m D: 3.35m
non propelled
The "sheerlegs"-type crane has a maximum lifting capacity of over 1,500 tons in the main frame and 600 tons in the fly-jib
ALE Heavylift performed two moves from Siemens on Shields Road in Walkergate to Neptune Energy Park in Low Walker for loading onto a barge. ALE Trojan 8870 BX65OAZ is seen in Low Walker turning from Welbeck Road on to Fisher Street.
Getting ready for the first removal of the second batch of boilers....
www.studsvik.com/en/About-Studsvik/News-archive/2012/UK/S...
Photo's Copyright VirgoPaperBus 2013
A 180 ton automotive metal press being loaded on board of the Rickmers Singapore.
This unit is part of a number of presses that originate from the Ford plant at Genk (Belgium) which was closed at the end of 2014. The presses will be discharged at the Chinese port of Ningbo.
Aankomst in de Maasmond van de Pioneering Spirit 6-3-2019 , op de Maasvlakte 2 word de schade aan de stinger hersteld.
Huge logo lettering on the side of the Dutch Big Lift Shipping company's specialised heavy lift cargo vessel MV Happy River (15,600t dwt), docked in Siracusa, Sicily in September 2007.
Waalhaven Rotterdam 15-3-2018 , van het ankergebied voor de kust van Scheveningen naar de Waalhaven om te bunkeren.
ALE Heavylift performed a movement of an electrical transformer weighing in at around 230 tonnes from Stella (Blaydon) to Wallsend overnight from 15th August to 16th August. On arrival at Swan Hunters in Wallsend it's to be shipped by barge to Ellesmere Port where it will be put back on the road to be taken to its destination of Oldbury. Seen at the North End of the Tyne Tunnel at East Howdon, the convoy is seen waiting to continue along Hadrian Road to Wallsend. The move was powered by a pair of ALE Trojan 8870 trucks with BX64KSE at the front with BX65OAW powering from the rear.
This heavy duty hydraulic personnel lift is used for furnace ladle rebricking in the steel industry. To learn more about how this lift table is used please visit: www.handling.com/Solution.aspx?rid=84
For more material handling ideas please visit www.handling.com/SolutionSearch.aspx?mde=all
ALE Heavylift performed two moves from Siemens on Shields Road in Walkergate to Neptune Energy Park in Low Walker for loading onto a barge. ALE Unipower P547HNT is seen here on Welbeck Road turning onto Fisher Street in Low Walker.
ALE Heavylift performed two moves from Siemens on Shields Road in Walkergate to Neptune Energy Park in Low Walker for loading onto a barge. ALE Unipower P547HNT is seen here on Coutts Road turning onto the Fossway in Walkergate.