View allAll Photos Tagged formwork

Complete precasting installation to manufacture transformer units (electrical substations) by Olmet Italy.

Testing concrete pumping from the bottom of the formwork. Companies involved in the test were Cemex of Mexico, Urbi, and Wall-Ties & Forms, Inc.

Rapid concrete home construction in Mexico using aluminum handset Concrete Forms

some concrete formwork in place at eastern end of the rail vehicle shed - to middle-left is the all important central pod. Phew!

R3 Triangle Building, Little Italy, San Diego, CA. Thin, triangle-shaped, 3-story loft. Architect: Lloyd Russell.

www.elastoplastic.com

 

In November 2007 ADIF, the Spanish railway infrastructure administration awarded a joint venture of Acciona (75%) and Obras Subterraneas (25%) the

EUR 113.8 million contract to build the 4.7 km section between Aranjuez and Ontigola. This includes the El Regajal Tunnel.

 

BarChip was chosen for the

primary secondary lining at

El Ragajel

 

The total tunnel length in 2,437 m, of which 2,080 m is the excavated tunnel with two cut and cover tunnels measuring 23 m and 224 m at the north east and south east ends respectively. The tunnel will be suitable for a double track.

 

The difficult and complex ground conditions comprise of clays with high salt

contents that can easily dissolve with low cover at the portals. Ground support

consists of steel sets together with 300 mm of BarChip reinforced shotcrete. Over 10,000 m3 of BarChip reinforced shotcrete will be used for primary ground

support, batched from a specially installed on site batching plant.

 

In excess of 120,000 m3 of BarChip reinforced concrete will be used for the secondary lining which will be up to 1.0 m in thickness. The concrete will be placed in situ using a 12 m travelling formwork. BarChip is being used to reinforce the secondary lining to enhance its resistance to the harsh ground

conditions over the life of the tunnel. BarChip fibre will not only impart excellent impact and abrasion resistance but it will help reduce any crack propagation.

Structural Steel and Formwork Construction Looking Northwest

Plastic-Formwork-system-moladi - Building construction technology for mass housing projects

Formwork elements from the company PERI are being used as a design element for the 2019 Ars Electronica Festival exhibition space POSTCITY.

 

Credit: Ars Electronica / Martin Hieslmair

At stairs to 2nd floor galleries, Clyfford Still Museum, Denver.

 

Architect: Allied Works Architecture

Completed: 2011

High side (left) anchor block formwork.

"East Abutment Monolith 45 & Formwork Mid July '61"

 

Original caption and photograph by Roy Hamilton

 

KHS - Roy Hamilton Collection

KHS Digital Archive Number: KHS-1998-16-ey-P1-D

www.kununurra.org.au/

 

Digitised and documented by KHS Volunteers.

High side (left) anchor block steel & formwork.

Ready for the concrete - checked by the engineer

Insulated concrete homes constructed using aluminum concrete forms. For more information visit www.wallties.com

Olmetitaly_formwork_single-block units_power substations_Russia_2013_2

Rammed earth cube prototype.

 

Rapid concrete home construction in Mexico using aluminum handset Concrete Forms

Multi-Story concrete

 

Multi-Story concrete construction using aluminum concrete forms

Rapid concrete home construction in Mexico using aluminum handset Concrete Forms

Hydrotherapy Pool Formwork

 

Construction shots of Winifred Holtby School with Tweendykes Special School taken in October 2010.

 

It was built by the Esteem Consortium, designed by JM Architects and cost £38 million.

 

To find out more about the school please visit buildingourfuture.org.uk/wht

LVDT sensor for measuring deflection of tensile membrane under load of concrete weight.

Lightweight Construction Method - cast a home with lightweight concrete and moladi modular plastic shutter formwork

Flying table forms to construct suspended reinforced concrete suspended floor slabs.

Olmetitaly_formwork_single-block units_power substations_Russia_2013_1

(13) The last layer of the mold has been poured. Previous layer exposing feet has been waxed for release, a new batch of plaster mixed up and poured. It will be no great tragedy if this second layer bonds by mistake to the earlier one, since many molds don't bother with the separation anyway.

Multi-Story concrete construction using aluminum concrete forms. For more information on concrete formwork visit Concrete Forms

1 2 ••• 47 48 50 52 53 ••• 79 80