View allAll Photos Tagged coping

A visit to Bourton House Garden on the last day of the meteorological summer. It was a warm lunchtime / afternoon for late September 2020.

 

It is an award winning three acre garden surrounded by a 18th century Manor House. The site includes a Tithe Barn dating to the 16th century, which is now a tea room. The house and garden has had several owners over the centuries.

  

Grade II* Listed Building

 

Bourton House

  

Listing Text

 

BOURTON-ON-THE-HILL MAIN STREET

SP 1732

(south side)

10/53 Bourton House

GV II*

Manor House. Early C18, rebuilt on foundations of late C16 house,

from which the cellars remain. C19 extension and conservatory.

Rectangular plan with corners extended out from both wall faces to

form engaged square 'towers'. Small C19 bathroom extension right

of right-hand 'tower'. C19 conservatory attached to left of rear

left 'tower'. Ashlar with slate roof, limestone gable end coping

and ashlar stacks. Facade: 2 storeys and attic lit by four 2-

light dormers with C20 casements. Cellar forms projecting plinth

on which the later facade was built. Symmetrical facade: 1:5:1-

windowed;.18-pane sashes. Wide glazing bars to ground floor sashes

except those lighting towers. All sashes with moulded architraves

and bull-nosed sills. String between ground and 1st floor windows

becomes band to either side of central doorway. Parapet with

moulded coping and string. Triangular pediment within parapet

supported by Ionic pilasters set-on from projecting towers.

Central 12-light part-glazed door up 7 steps. Moulded segmental

pediment supported by fluted Ionic pilasters over. Cellar lit by

2-light stone-mullioned casements with leaded lights. Ovolo-

moulded mullions to blocked cellar window of left 'tower'. Roof

comprises 3-parallel ridges with large square gable end stacks with

moulded caps at the end of each ridge. Saddleback gable coping.

Interior: C18 open well staircase with thin turned, wooden

balusters. Some panelling reused from C16 house, some C18

panelling also. Wood from doors of C16 house reused in doors to

upper floor. Limited interior inspection. Subsidiary features: 7

semi-circular steps flanked by C18 wrought iron railings with

scroll decoration and urn finials. (Country Life, 1943).

  

Listing NGR: SP1773632463

 

This text is from the original listing, and may not necessarily reflect the current setting of the building.

 

2011 World Water Week Thursday Lauereates Seminar in the Precence and Honour of H.M. King Carl XVI Gustaf. 2011-08-25. Coping with Catastrophic Changes - Building Long-term Resilence Photo credit: Mikael Ullén/SIWI.

Managed to grab a quick shot of this coping with the complex business of negotiating the platform change coming south from Inverness heading for Darlington. From Inverness the train was running late from the start, kicked off all non-Ediburgh bound passengers at Aveimore to allow a faster transit by missing stopping at intervening stations. Even so arrived in Edinburgh 50 minutes late. I missed my connection, everyone upset...

The Station in named in honour of Sir Walter Scott's Novel: Waverley or 'Tis Sixty Years Since, published in 1814 it was Sir Walter's first work of fiction though it was some years before he admitted authorship. Waverley has never out of print .

Swimming pool with full steps, limestone coping, custom handrail

We love the smell of fresh cut aluminum pool coping in the morning! Smells like...victory!

#poolcoping #aluminum #extrusion #madeinamerica

A Joseph Hamblet blue-black 180 degree coping brick, dated. as is common with these, here, 1897.

 

The Hamblet works in West Bromwich, was founded in 1851 when Joseph Hamblet acquired part of the Piercy estate at Ireland Green, becoming the largest brickworks in this area of West Bromwich. The firm specialised in blue bricks, but produced many other types as well. In 1898, four years after Hamblet's death, it became Hamblet's Blue Brick Co Ltd. The firm closed down in 1915 and the estate was sold off in 1919.

Laboratório de Prótese Dentária EsteticArt | Laboratório de Prótese CAD CAM em SAO PAULO

www.esteticart.com.br

11 3854-6451

 

Trabalhamos com praticamente todos os sistemas de implantes nacionais e importados.

Economia: Não é necessário enviar componentes calcináveis.

Podemos trabalhar com qualquer tipo de trabalho protético, desde lentes, onlays, próteses convencionais e próteses sobre implantes.

 

laboratorio, laboratorio de protese, laboratório de prótese, laboratorio de protese dentaria, laboratório de prótese dentária, prótese dentária, protese dentaria, cad cam, cad cam, cadcam, cadcam, cerec, sirona, neoshape, neodent, conexao, titanium fix, 3shape, vita, ivoclar, abutment, pilar, lente, lente de contato dental, ,lentes de contato, dental, dentais, dentaria, dentario, dente, coroa, porcelana, cerâmica, ceramica, protocolo, protocolo branemark, protocolo ceramico, fresadora, estrutura, interface, link, base, metalica, metálica, coping, zircônia, emax, feldspatico, feldspatica, dissilicato de litio, dissilicato, dissilicato de lítio, lentes, onlay, flexivel, flexite, aparafusada, parafusada, cimentada, sao paulo, sedex, estética, ceramicas injetadas, injetada, prensada, prensado, dentista, laboratorios, ,protese dental, qualidade

2011 World Water Week Thursday Lauereates Seminar in the Precence and Honour of H.M. King Carl XVI Gustaf. 2011-08-25. Coping with Catastrophic Changes - Building Long-term Resilence Photo credit: Mikael Ullén/SIWI.

Three pages of adverts from the "Compendium" of 1909 and showing the various products of the famous J. C. Edwards of Ruabon in North Wales. The company existed from 1903 until 1956 and was one of a number of such companies, manufacturing bricks, terracotta and tiles that exploited the exploit the natural clay beds, and materials associated with the local coal industry; Ruabon is still famous for the deep red 'quarry' tiles that are produced in much reduced numbers.

 

In a way we see Edwardian architecture as often being 'fussy' to modern tastes but one has to marvel at the range of products seen here that were decorative as well as functional. Many miles of 'better quality' British homes of the period still sport such products on homes, roofs, and garden walls. There are a wealth of special bricks, such as for inset panels, and items such as chalk rail tiles for school rooms. There is also an immense range of pier caps and copings in red buff or golden buff terra cotta.

This thing could be made to actually fit a side pull brake, wheel and tire without having to take the bridge out of the fixture.

www.vastec-usa.com

Phone: 888-282-7832

Photos showing installation of VASTEC USA's Coping For Fiberglass Pools... an easy alternative to cantilever deck concrete forms for swimming pools.

Nina (9 jaar) woont met haar vader en moeder in Gbanga, Bong County. Ze is enig kind en een echt moederskind. Haar vader Emanuel is leraar Engels en moeder Yasmin zorgt voor haar dochter. Nina is dol op school en spelen met haar vriendinnen, maar het allerliefst leest ze een boek. .

.

Ebola heeft een grote impact op het gezin. Emanuel raakte zijn baan kwijt toen de scholen noodgedwongen moesten sluiten, Nina kon niet meer naar school. Uit angst dat Nina besmet zou raken met ebola, besloten Emanuel en Yasmin om hun dochter binnen te houden. Al weken lang kon het meisje geen kant op en sleet haar dagen met boeken lezen en haar moeder helpen. .

.

Twee weken geleden werd Nina ziek. Ze kreeg koorts en werd opgenomen in Phebe Hospital*. Haar ebolatest was negatief, dus ze werd opgenomen in het ziekenhuis. Tijdens het inbrengen van een infuus zo’n 1,5 week na haar opname begon ze opeens hevig te bloeden. Dit alarmeerde de verpleegkundigen en ze werd onmiddellijk in isolatie geplaatst ter observatie. Het konden immers alsnog de symptomen van ebola zijn. .

.

Nina bracht 3 angstige dagen door in de isolatie-afdeling voordat haar ebolatest wederom negatief uitwees. Haar moeder week geen seconde van het ziekenhuis. Haar vaste plek was een steen, net aan de andere kant van het hek. Nina zat zo veel mogelijk buiten, zodat ze haar moeder kon zien en met haar kon praten. Het was een kwelling voor Yasmin dat ze haar dochter niet kon vasthouden en troosten. Nina vond de verpleegkundigen in hun beschermende pakken eng, want volgens haar waren het verkleedde geesten. Bovendien miste ze haar ouders enorm. .

.

Toen duidelijk werd dat Nina geen ebola had, mocht ze naar huis. Haar kleding moest ze achterlaten, dus Save the Children gaf haar nieuwe kleren en schoenen. De verpleegkundigen adviseerde Yasmin om haar dochter zo veel mogelijk te knuffelen en haar omgeving te vertellen dat er bij Nina geen sprake is van ebola, om stigmatisering te voorkomen. .

.

Nina is nog steeds erg zwak en de toekomst is onzeker voor het gezin. Er komt al maanden geen brood op de plank en het gezin zit financieel aan de grond. Er is amper nog geld om eten te komen. Daarom ontvangen ze voedselpakketten van Save the Children, want het is belangrijk dat Nina weer aansterkt en gezond wordt. .

.

Het ziet er naar uit dat de scholen in januari wellicht weer open gaan, maar het is allerminst zeker dat Nina dan weer in de schoolbanken kan. Haar ouders hebben niet de middelen om het schoolgeld te betalen en dat zou dramatisch zijn voor Nina’s toekomst. .

.

Gelukkig is het virus het huis van deze familie vooralsnog voorbij gegaan, maar hun verhaal laat zien dat ebola op veel verschillende manieren levens verwoest en dat er hulp nodig zal blijven, ook als de epidemie voorbij is. .

.

.

.

.

.

* Phebe Hospital verloor in de eerste weken na de ebola uitbraak 6 verpleegsters aan het virus. De dokter overleefde ebola en werd door President Obama ontvangen in het Witte Huis. Het ziekenhuis sloot uit angst voor meer besmettingen. Daarmee verdween de reguliere gezondheidszorg volledig uit het district. Vrouwen ontvingen geen prenatale zorg en moesten noodgedwongen thuis bevallen zonder de hulp van een verloskundige. Patienten met andere ziektes, zoals malaria, ontvingen geen medische zorg, waardoor het sterftecijfer steeg. Save the Children bouwde, op verzoek van de lokale overheid, een ebola behandelcentrum (EBC). Deze wordt gerund door het IMC. Twee dagen nadat het EBC in gebruik werd genomen, kon Phebe Hospital weer open voor de reguliere gezondheidszorg. .

 

VASTEC Coping For Fiberglass Pools. Easy to install, fits any size and shape fiberglass swimming pool, no messy forms to remove or clean up. Contact us at 888-282-7832 or www.vastec-usa.com for more info.

Dress gently and in layers. Wear common fibres. Synthetic fibres trap heat and sweat throughout a hot blaze, making this symptoms considerably more uncomfortable.

 

www.drugfreemenopausetreatments.com/

Laboratório de Prótese Dentária EsteticArt | Laboratório de Prótese CAD CAM em SAO PAULO

www.esteticart.com.br

11 3854-6451

 

Trabalhamos com praticamente todos os sistemas de implantes nacionais e importados.

Economia: Não é necessário enviar componentes calcináveis.

Podemos trabalhar com qualquer tipo de trabalho protético, desde lentes, onlays, próteses convencionais e próteses sobre implantes.

 

laboratorio, laboratorio de protese, laboratório de prótese, laboratorio de protese dentaria, laboratório de prótese dentária, prótese dentária, protese dentaria, cad cam, cad cam, cadcam, cadcam, cerec, sirona, neoshape, neodent, conexao, titanium fix, 3shape, vita, ivoclar, abutment, pilar, lente, lente de contato dental, ,lentes de contato, dental, dentais, dentaria, dentario, dente, coroa, porcelana, cerâmica, ceramica, protocolo, protocolo branemark, protocolo ceramico, fresadora, estrutura, interface, link, base, metalica, metálica, coping, zircônia, emax, feldspatico, feldspatica, dissilicato de litio, dissilicato, dissilicato de lítio, lentes, onlay, flexivel, flexite, aparafusada, parafusada, cimentada, sao paulo, sedex, estética, ceramicas injetadas, injetada, prensada, prensado, dentista, laboratorios, ,protese dental, qualidade

SOMEBODY likes a chain-saw massacre!! You don't need dozens of worthless Associate of Arts in Goat Spleen Helper Studies diplomas to know that. Just go to Texas.

Coping edge Manganese Saltillo Tile - ideally used on stairs.

 

More like this at RusticoTile.com by Rustico Tile and Stone. Wholesale rates and worldwide shipping.

Visit to Great Pyramids, Giza, Egypt with Tom and Helen Copinger-Symes

13" Coping is used to create steps along this walkway. Rinox Belair pavers as well as Belmont Borders were also used in this project.

Sun Fiberglass Pool installed by Beach Town Pools of Virginia Beach, Virginia using VASTEC USA's Coping For Fiberglass Pools and waterline tile.

www.vastec-usa.com

Phone: 888-282-7832

Photos showing installation of VASTEC USA's Coping For Fiberglass Pools... an easy alternative to cantilever deck concrete forms for swimming pools.

29-30 Nov 2022, Alexandria - More than two long years, FAO Egypt team suffered from coping with the COVID-19 pandemic and staff struggles to cope with the new teleworking mechanism, not mingling together as they used to and not being able to balance their work time and personal life. Hence, FAO Egypt team members definitely need a break to boost overall productivity – a “Staff Retreat”!

The off-office-site retreat will serve as a refresher for FAO Egypt team. Holding the retreat in a set-up different from that of the office is essential so that staff feel free to break the routine and engage informally and spontaneously which promotes team-building and bonding.

The retreat is also an ideal opportunity to effectively discuss burning team/work related issues in a relaxed environment. This being said, the programme of FAO Egypt’s Staff Retreat will tackle key work related issues in an interesting manner and at the same time introduce energizer and team building games to strengthen bonding between staff members.

 

Photo credit must be given: ©FAOEgypt

Coping with Post-Partum Depression in a Modern Age.

 

Liz' book jacket photo

VASTEC Coping For Fiberglass Pools. Easy to install, fits any size and shape fiberglass swimming pool, no messy forms to remove or clean up. Contact us at 888-282-7832 or www.vastec-usa.com for more info.

Underground pool in a small yard designed and installed by Bali pools on the gold coast using Stile Edge tile edging on the pool coping tiles

www.stileedge.com

Coping with climate change in Malawi (copyright CIDSE)

   

View this picture story from 1 to 9.

VASTEC Coping For Fiberglass Pools. Easy to install, fits any size and shape fiberglass swimming pool, no messy forms to remove or clean up. Contact us at 888-282-7832 or www.vastec-usa.com for more info.

This firepit was constructed using multiple varieties of Buechel Stone. The firepit coping uses Thermal Fossil Spire and the veneer features Fond du Lac Country Spire. The outside uses Thermal Blue Stone.

Get the detailed finish your dream project needs with Bullnose Coping. Other products shown: 24x24 Flagstone

Visit to Great Pyramids, Giza, Egypt with Tom and Helen Copinger-Symes

2011 World Water Week Thursday Lauereates Seminar in the Precence and Honour of H.M. King Carl XVI Gustaf. 2011-08-25. Coping with Catastrophic Changes - Building Long-term Resilence Photo credit: Mikael Ullén/SIWI.

Two feet of snow on the ground outside; cozy, warm fire inside. Not a tough choice.

 

I think no one is going up or down the mountain for a few days. There's food in the fridge, plenty of firewood, and lots of furry little loves to keep me company in front of the fire in between romps in the snow. What more could I want?

 

2011 World Water Week Thursday Lauereates Seminar in the Precence and Honour of H.M. King Carl XVI Gustaf. 2011-08-25. Coping with Catastrophic Changes - Building Long-term Resilence Photo credit: Mikael Ullén/SIWI.

-- Livin' in this spaced out world. Lovin' these spaced out girls.

 

Anthony Dean (Tony BolognaHead) McNary

Photographer; Musician; International Playboy

aperturesciencephotography.com

Sent from my iPho... Palm Pre

I started with by coping airdrivenpump from Brickshelf but changed some elements for a more rounded bottom.

This firepit was constructed using multiple varieties of Buechel Stone. The firepit coping uses Thermal Fossil Spire and the veneer features Fond du Lac Country Spire. The outside uses Thermal Blue Stone.

2011 World Water Week Thursday Lauereates Seminar in the Precence and Honour of H.M. King Carl XVI Gustaf. 2011-08-25. Coping with Catastrophic Changes - Building Long-term Resilence Photo credit: Mikael Ullén/SIWI.

Laboratório de Prótese Dentária EsteticArt | Laboratório de Prótese CAD CAM em SAO PAULO

www.esteticart.com.br

11 3854-6451

 

Trabalhamos com praticamente todos os sistemas de implantes nacionais e importados.

Economia: Não é necessário enviar componentes calcináveis.

Podemos trabalhar com qualquer tipo de trabalho protético, desde lentes, onlays, próteses convencionais e próteses sobre implantes.

 

laboratorio, laboratorio de protese, laboratório de prótese, laboratorio de protese dentaria, laboratório de prótese dentária, prótese dentária, protese dentaria, cad cam, cad cam, cadcam, cadcam, cerec, sirona, neoshape, neodent, conexao, titanium fix, 3shape, vita, ivoclar, abutment, pilar, lente, lente de contato dental, ,lentes de contato, dental, dentais, dentaria, dentario, dente, coroa, porcelana, cerâmica, ceramica, protocolo, protocolo branemark, protocolo ceramico, fresadora, estrutura, interface, link, base, metalica, metálica, coping, zircônia, emax, feldspatico, feldspatica, dissilicato de litio, dissilicato, dissilicato de lítio, lentes, onlay, flexivel, flexite, aparafusada, parafusada, cimentada, sao paulo, sedex, estética, ceramicas injetadas, injetada, prensada, prensado, dentista, laboratorios, ,protese dental, qualidade

The finest #concretebowl was opened by FK-ramps team a few days ago in our hometown - St.Petersburg! This space appears to be the first bowl in Russia to have original concrete coping. We consider this project a great present for the skill improvement and future extreme sports promotion in our country.

 

Бетонный скейт парк МЕГА Дыбенко — главные новости 2018 года для экстрим-сообщества Петербурга!

 

Скейт парк МЕГА Дыбенко: Предыстория проекта

До недавнего времени экстремальная инфраструктура Санкт-Петербурга могла похвастаться лишь редкими заголовками об открытии бетонных парков от FK-ramps. За последнее время наша компания построила два бетонных скейт парка для родного города. Санкт-Петербургу требовалась современная площадка для тренировок спортсменов в дисциплине пул. Благодаря гражданской инициативе райдеров, правительство Петербурга предприняло попытку создания городского боула в начале 2018 года.

 

Проект бетонного скейтпарка на Железноводской улице Васильевского острова был создан нашей компанией при тесном взаимодействии с инициативными спортсменами. К большому сожалению, строительство пула было провалено “голодным”, некомпетентным подрядчиком, выигравшим конкурс на строительство площадки.

 

На момент проведения закупки, всем стало понятно, что 2018 год не принесет райдерам Санкт-Петербурга радостных новостей об открытии бетонного боула на ВО. Опасения подтвердились! Халтурщики-общестроители попытались набрызгать полусухую стяжку в кривую опалубку чаши пула на Васильевском. Халтурщики не удосужились уделить внимание финишингу фигур, тем самым подведя свою историю к расторжению контракта на строительство.

 

К счастью, фиаско на Васильевском стало благодатной почвой для инициативы социально-ответственного бизнеса.

 

Потребность экстрим-сообщества в полноценном пуле была поддержана руководством ТРК Мега Дыбенко!

 

На начальных этапах было принято решение проектировать глубокий боул с бетонным коупингом, взяв за основу лучшие образцы подобных площадок на Западе.

 

Возникло множество вопросов, касаемо насыщения участка проектирования. Нам пришлось соблюсти тонкий баланс между сложной доминантной фигурой — пулом и набором простых стрит-фигур для начинающих. Критически важным моментом было не допустить пересечение траекторий начинающих спортсменов и про-райдеров.

 

Бетонный скейт парк МЕГА Дыбенко: Строительство

Перед нашей командой стояла непростая задача. Участок строительства имел высокий уровень грунтовых вод. Кроме сложной геологии и огромных объемов грунта под экскавацию, мы оказались “заперты” плотным примыканием существующей дорожно-тропиночной сети. Дополнительным фактором испытания на прочность стал строгий график производства работ. Местоположение на территории общественного парка не оставило нам выбора, кроме ночных работ!

 

Наши инженеры разработали уникальное для России решение дренажа площадки, которое потребовало выемки более 1000 м3 грунта, отсыпки и тромбовки основания, а также обустройства системы водопонижения под массивной чашей бетонного боула. Таким образом, отвод воды производится изнутри и снаружи бетонного скейтпарка.

 

Бетонный скейт парк МЕГА Дыбенко: Особенности

Бетонный коупинг для скейтпарка был произведен собственными силами нашей компании. Мы разработали несколько типовых элементов бетонного коупинга, а также отработали технологию уплотнения высокопрочного бетона на вибростоле. Таким образом, наша компания готова к применению оригинальных коупингов в будущих проектах FK-ramps!

 

Кроме уникальных функциональных элементов конструкции, фигуры скейтпарка выполнены с применением технологии пигментации бетонной смеси. Изолированный периметр площадки, а также очевидные входные группы со строгими правилами посещения позволят избежать конфликтных ситуаций во время эксплуатации сооружения.

 

Первый в России бетонный боул с оригинальным коупингом был открыт для райдеров в начале осени 2018 года.

 

Долгожданный бетонный скейтпарк с полноценным боулом был реализован компанией FK-ramps на территории МЕГА ПАРК (Мега Дыбенко).

 

Открытие первого в России боула с оригинальным (бетонным) коупингом получило большой резонанс среди отечественных райдеров!

 

Вас ждет двойная чаша интересной конфигурации (2,2 – 1,8 м), а также стрит-секция для начинающих.

 

Бетонный скейт парк МЕГА Дыбенко обещает стать новым этапом развития отечественного экстрима, поэтому рекомендуем к посещению!

Toronto's municipal (city) workers have been on strike since mid-June 2009. I set out to look for trash/ garbage/ rubbish lying around on the streets but for the most part, the city is actually surprisingly clean.

 

Unlike the last time they went on strike in 2002, this time Toronto residents are coping quite well. The city has set up temporary dump sites (usually in neighbourhood / neighborhood parks) where residents can bring in their own trash until the labour / labor dispute is over. Many businesses seem to be paying for private collectors to dispose their commercial garbage for the time being. Surely the rubbish bins on the major streets are overflowing with trash, but most streets are otherwise quite clean. Because of the cool summer this year, there's also little smell around the bins.

 

This was taken at 1176 Danforth Avenue near Greenwood Avenue.

1 2 ••• 24 25 27 29 30 ••• 79 80