View allAll Photos Tagged constructionworker

The bypass is for Judds Brothers Construction from Lincoln, NE. The project is replacing a siphon sewer under the Iowa River. Griffin is bypassing the sewage from the old structures while the new sewer connections are made. Total volume is about 6,300 gallons per minute. Total duration of the job is 2 weeks from startup to shut down of the pumps. Griffin is bypassing sewage from 3 different locations on site, 2 operate at any one time. For more information visit: www.griffindewatering.com

These guys are 9 stories up at the Mass General B3C work site. Both have their safety harnesses on.

Photo taken in Hong Kong

攝於香港

Photo No.: _DSC4277

A well that Griffin dewatering installed in Denver Colorado to complete a pump test to determine the dewatering system that will be required.

The well was 8” in diameter, all PVC, drilled 35’ to claystone. We placed a 5HP pump in the well and it yielded over the 200 GPM that was required. The sand content of the water was only listed as a trace or less than one parts per million, the NTU was less than 1 which is equivalent to tap water.

The upper 10’ of the well had to be containerized into barrels due to contamination. The well was drilled and installed in one day, and then pump tested the next day.

www.griffindewatering.com

Men At Work . Roofers . Shopping Mall across from Wilton Station . NE 26th Street . Wilton Manors FL . Wednesday afternoon, 23 November 2005

 

Elvert Xavier Barnes Photography

Persistent URL: digital.lib.muohio.edu/u?/snyder,3784

 

Subject (TGM): Log cabins; Construction; Construction workers; Buildings; Wooden buildings;

A city like this doesn't get built alone. It takes the effort and sweat of lots of men. Today, here's my tribute to them.

 

"Stripping after work"

Somewhere on Fulton Street.

New York.

File name: 08_06_034528

Title: Workers building sign on roof of building near Park Square

Creator/Contributor: Jones, Leslie, 1886-1967 (photographer)

Date created: 1934 - 1956 (approximate)

Physical description: 1 negative : film, black & white; 4 x 5 in.

Genre: Film negatives; Aerial photographs

Subject: Construction workers; Construction; Boston (Mass.)

Notes: Title from information provided by Leslie Jones or the Boston Public Library on the negative or negative sleeve.; Date supplied by cataloger.

Collection: Leslie Jones Collection

Location: Boston Public Library, Print Department

Rights: Copyright Leslie Jones.

Preferred credit: Courtesy of the Boston Public Library, Leslie Jones Collection.

Not sure what's going on with this construction worker/owl theme.

 

Broadway Ave, in Seattle's Capitol Hill neighborhood.

Stitched Panorama

 

Country : Malawi

Date : 2013-03

Copyright : Marcel Crozet /

A7R2_04665

 

The demolition for the 6th Street Bridge took place Superbowl weekend without incident. The first stage of the nine-month long demolition was to dismantle the 200 foot long section spanning over the 101 FWY. Crews worked around the clock beginning late on Friday evening, and reopening the 101 on Sunday morning.

Colley ave construction near CHKD and Norfolk General.

Men At Work . Roubin and Janeiro, Inc . 60 P Street, SE . WDC . Monday afternoon, 30 January 2006

 

www.janeiroinc.com/principal.html

 

DC Ballpark District Project

Elvert Xavier Barnes Photography

Men At Work . Logan Circle . 14/Q . NW . WDC . Tuesday afternoon, 4 October 2005

 

www.q-14.com/

 

Cityscape, Architectural and Industrial Series

Elvert Xavier Barnes Photography

Man At Work . 18/L . NW WDC . 22 August 1996

Men At Work . Unit Block . M Street, SE . WDC . Saturday morning, 26 November 2005

 

While having breakfast with Richard at McDonald in SW at the corner of South Capitol and I Streets I'd read an article in December 2005 isssue of The Southwester www.swdc.org pertaining to the 23 October 2005 dedication of the Peace Memorial Garden which on 1 October, located at the corner of M and South Capitol Streets in SW, I had unknowingly photographed two Men At Work www.flickr.com/photos/perspective/54733736/in/photostream/ who at the time were preparing the soil for the future garden.

 

When Richard mentioned that he was going outside, of McDonalds, to the patio to take a smoke and would return, inside, in a few mintues to continue reading the paper I'd say that I would head back home ... and take some pictures ... along the way!

 

Wanting to photograph the newly installed Peace Memorial Garden I'd walk along Eye, turn right unto First Street and walk toward M Street. Since in September 2005 I had begun photographing "Men At Work" www.flickr.com/photos/perspective/31594129/in/set-705008/ in the Unit Block of M Street and so as to add a few more images to that collection www.flickr.com/photos/perspective/sets/705008/ I would take this series of images before heading over to Peace Memorial Garden, which is just a block up the street.

 

Elvert Xavier Barnes Photography

Construction Workers . Capitol Hill Towers . Capper-Carrollsburg, SE . WDC . Tuesday, 20 September 2005

 

Elvert Xavier Barnes Photography

1 2 ••• 51 52 54 56 57 ••• 79 80