View allAll Photos Tagged constructionworker
Up there among the steel trusses that support the massive roof of Delhi Airport's new terminal, an unknown, unnamed worker goes about his job. No one would recognize him even when he takes his mask off, but what he has built will serve the world for generations to come. Hats off to these workers, hats off to human enterprise.
Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.
Worker at the site of the old Charles Street Jail. The building is being renovated and will become the Liberty Hotel. Click here to see where this photo was taken.
Click here to see more pictures of the Charles Street Jail construction.
On-going work of the Express Highway in Muscat , these are some of the construction workers, this is an unposed shot, the man with the turban had this fixed expression through out our conversation with them.
Bit annoyed with myself for shooting this at an angle. Ideally, I would have liked to have got square on so all the lines were clean horizontal/vertical.
Oh well.
Find the perfect photo location at www.shothotspot.com
A construction worker standing next to a drill rig that is drilling deep wells for a deep well dewatering system on a southeast Missouri in close proximetity to the Mississippi River. For more on deep well dewatering systems visit: www.griffindewatering.com/dewatering/deep_well_system.html
or call 713-676-8000 to speak with a deep well dewatering professional today.
Lehigh Valley Zoo made this banner when construction was in progress for Habitat Madigascar, a building that now houses two species of lemur.
The banner is up again, in anticipation of another building, which will be a home for red pandas. Slash, the red panda I occasionally post here, lives at Elmwood Park Zoo.
Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.
Largely inspired by Danny St's 5-sec Portraits, I've been taking very close portraits of people I talk to in Shanghai.
Sometimes, I get carried away talking to people. I love striking up conversations, overcoming barriers and just whiling the time away discovering lives of others.
5 seconds are never enough for me.
As always, more stories at shanghaistreetstories.wordpress.com
Construction Workers . After Work . New Jersey Avenue just north of Eye Street, SE . WDC . Thursday afternoon, 22 September 2005
Elvert Xavier Barnes Photography
Hard to see at this size but most of the wokers are looking at me, laughing and pointing. The scaffolding is made of bamboo...
A construction crew at the site of a new Interstate 90 bridge being built over the Mississippi River upriver of La Crosse, Wisconsin.
A group of men performing drilling work for the Adelaide Oval footbridge on a Tuesday afternoon. In the background, the southern grandstand is beginning to take shape
Men at Work . 1101 K Street, NW . WDC . Monday afternoon, 26 September 2005
Elvert Xavier Barnes Photography
Men At Work . Downtown . F Street between 9th and 10th Streets, NW . WDC . Monday, 26 September 2005
Elvert Xavier Barnes Photography
"There’s nothing like the smell of decomposing solid waste at the break of dawn." The crew preparing the rig to begin the day’s drilling of methane gas extraction wells . The extraction wells were tied into the landfill’s existing system by means of 4” HDPE pipe buried in the topsoil.
Wick Points installed around a Jacking Pit and Receiving Pit for a Jack & Bore Operation under existing railroad tracks. In an effort to keep operating costs down, the wick points on the Receiving Pit were run under the railroad tracks and hooked up to the pump that was on the Push Pit. Due to union requirements, a set of Operating Engineers would be required on both sides if a pump was placed into service on the Receiving Pit. Griffin kept dewatering costs lower than other dewatering contractors.
Innovative Ideas and Practical Solutions from Griffin Dewatering. For more information on the drainage of excavations and groundwater control please visit: www.griffindewatering.com