13th Annual Construction Career Day at OSU/OKC. Over 250 students attended from Oklahoma City Public Schools. The Oklahoma Department of Transportation, The Association of General Contractors, Oklahoma /Arkansas Chapter ACPA, AGC Building Chapter, Oklahoma Asphalt Pavement Association, and Oklahoma State University/OKC sponsors this event
Construction work suspended when the River Avon burst into the lock site.
The new lock at Marlcliff was built during August and September 1969, after Harvington lock had been completed. It was not possible to drive piles into the marl, from which the area gets it’s name, so a lock chamber sized hole was excavated and steel piles for the walls of the lock were concreted into trenches. The lock gates were re-cycled from the abandoned Runcorn locks.
The weir at Marlcliff was constructed in July 1970. It was a substitute for Cleeve weir which had, until it failed, controlled the water level up to Bidford on Avon. The remains of Cleeve weir were removed in January 1970, and the river dredged up to Marlcliff in early 1970. The land drainage requirements of the River Authority precluded reinstatement of the original navigation levels and hence the new lock and a weir, at ‘low summer level’, were built at Marlcliff, where a marl slab provided a natural step in the river level. It was then necessary to ‘gouge’ a channel out of the river bed to provide a navigable depth up to Bidford.
This photograph is one of a series showing the construction of the navigation works for two periods during the ‘restoration’. The first period covers May 1969 to the end of July 1970, during which time the first three locks; George Billington, Harvington (Robert Aickman) and Marlcliff (I.W.A.) were built. The second period was June 1971 to June 1972 which spanned the construction of Barton (Elsie & Hiram Billington), Luddington (Stan Clover) and Stratford (Colin P. Witter) Locks.
The Upper Avon from Evesham to a junction with the Southern Stratford Canal, in Stratford on Avon, was restored to through navigation by the Upper Avon Navigation Trust between 1969 and 1974, when it was formally re-opened by the Queen Mother. The navigation had been abandoned in the 19th Century and very little of the former navigation works remained. It was made navigable again by building nine new locks and three new weirs and by dredging a substantial length of the river to provide a navigable depth.
Photograph taken by Amber-Lynn Taber
Rights: VCU Libraries. Attribution required.
Further information: Communications and Public Relations Office, VCU Libraries, (804) 828-0129
It took 4 days to pressure wash, stain, and construct the addition. I couldn't have done the carpentry so fast without Sarah's help.
This image is for the non-commercial use of UBC faculties and units only. For non-UBC use please contact comm.marketing@ubc.ca. Please credit photo to “Paul Joseph / UBC Communications & Marketing”
Construction begins at The Lorton Reformatory. Buildings will be adapted and repurposed for residential and commercial use to create Liberty–a modern and vibrant community hub in the heart of Lorton, Virginia. Liberty is located 25 miles from Washington, D.C. and 35 miles from Fredericksburg, Virginia.
thelibertylife.com
This image is for the non-commercial use of UBC faculties and units only. For non-UBC use please contact comm.marketing@ubc.ca. Please credit photo to “Paul Joseph / UBC Communications & Marketing”
Construction continues on Kings Island's new Soak City water park. The $10 million expansion replaces Boomerang Bay and is expected to open Memorial Day weekend. Photos provided/Kings Island
Day 01 - Driveway & Patio Work.
Pavement in the back (between the old fence and the shed) is removed and crushed stone dropped in a pile for the patio base. Plantings removed. Trench dug for the retaining wall.
We get to keep the Bobcat overnight!!! Where are the keys?
Construction underway on the Plaza Vista project in Kansas City, Missouri. Polsinelli Shughart anchor tenant, developed by VanTrust Real Estate, general contractor JE Dunn.
Construction on the future Cortex MetroLink Station is moving forward. When complete, the light rail station will serve the Cortex Innovation Community and nearby neighborhoods and businesses.