Four Containers arrived at location and preparation to un-stuff began. Oversized loads were inspected for damage in transit, a pre-determined lifting plan actioned. Steel.Steel beams were stacked on top of the cargo which meant that manual labor was needed to un-stuff each container prior to using the MHE.
Once the steel had been removed manually, pallet trucks and fork lifts made easy work of un-stuffing the containers and placing the cargoes in the designated unpacking area.
Each container presented a different challenge regarding the safest way to un-stuff the cargo to prevent any damage. Eight meter steel beams had to be manually un-stacked before the telehandler could reach into the containers and pull the individual pieces out.
CEA provided all plastic sheeting and tarpaulins made at our plastic production facilities in Laem Chabang, these would protect the new ground surface from heavy equipment damage whilst the operation was underway.
The oversized cargo was lifted out of the containers through the use of a Reach Stacker.
Each of the four containers presented their own individual difficulties for manual and mechanical un-stuffing, the CEA team improvised and adapted well to overcome each hurdle much to the delight of the client.
Early morning sun reflected above the opposite window of St Andrews shepherds church. in Didling , West Sussex Uk
EA Project Logistics recently completed a complex and potentially difficult project in Bangkok. The project involved the un-stuffing of 60 containers each holding two waste compactor units which were to be stored at a designated lay down area.
The units had arrived from Shanghai China and were to be used by the BMA (Bangkok Metropolitan Administration).
CEA carried out methodology studies and ascertained that the project would require two teams of 6 working 24 hours to meet the three day deadline. As Bangkok has transit restrictions for the transport of containers from 10am – 3pm and with the continuing demonstrations, timing and efficiency were key to a successful execution.
The day shift team arrived early in the afternoon to begin mobilization, the first convoy of containers arrived soon after and assembled in the parking area.
The first container was moved into position and opened, a CEA Manitou Telehandler placed its forks under the first compactor and slowly reversed until 2/3rds of the compactor were exposed. A CEA 14 ton forklift then positioned itself at the side of the compactor and raised its forks to take the weight, the Telehandler and container truck then withdrew from the area allowing the forklift to transport the compactor across the yard to the designated laydown area.
The night shift team arrived at 6pm and continued the process throughout the night, as the hours passed by, the teams increased their efficiency resulting in completion of the project in 2.5 days much to the delight of the client.
My Lego telehandler is loosely based on CAT TL642. Buwizz and iPad are used to control it remotely. There are four motorized functions: drive with PF L motor, boom elevation with PF L motor, fork tilt with M motor, and steering with PF servo. Front wheels are driven through a differential, and the rear axle has a simple suspension. Overall, it is maneuverable, easy to control thanks to the proportional control of Buwizz, and very fun to play with. Please watch the video for a demonstration. When sharing, please include the link to my instagram www.instagram.com/legomarat/
My Lego telehandler is loosely based on CAT TL642. Buwizz and iPad are used to control it remotely. There are four motorized functions: drive with PF L motor, boom elevation with PF L motor, fork tilt with M motor, and steering with PF servo. Front wheels are driven through a differential, and the rear axle has a simple suspension. Overall, it is maneuverable, easy to control thanks to the proportional control of Buwizz, and very fun to play with. Please watch the video for a demonstration. When sharing, please include the link to my instagram www.instagram.com/legomarat/
A telehandler raises the front portion of the Spartan helmet's plume into place on the backside of the new northeast scoreboard at Michigan State's Spartan Stadium on July 21, 2012.
Equipment used
Manitou Telehandler
3 ton Manitou Fork lift
15 ton Fork lift
Hino 7 ton Hiab truck
Reach Stacker
Four Containers arrived at location and preparation to un-stuff began. Oversized loads were inspected for damage in transit, a pre-determined lifting plan actioned. Steel.Steel beams were stacked on top of the cargo which meant that manual labor was needed to un-stuff each container prior to using the MHE.
Once the steel had been removed manually, pallet trucks and fork lifts made easy work of un-stuffing the containers and placing the cargoes in the designated unpacking area.
Each container presented a different challenge regarding the safest way to un-stuff the cargo to prevent any damage. Eight meter steel beams had to be manually un-stacked before the telehandler could reach into the containers and pull the individual pieces out.
CEA provided all plastic sheeting and tarpaulins made at our plastic production facilities in Laem Chabang, these would protect the new ground surface from heavy equipment damage whilst the operation was underway.
The oversized cargo was lifted out of the containers through the use of a Reach Stacker.
Each of the four containers presented their own individual difficulties for manual and mechanical un-stuffing, the CEA team improvised and adapted well to overcome each hurdle much to the delight of the client.
via At Telehandler Training, we offer professional telehandler training courses in Acton t.co/y5LV59u4nw We have assisted thousands in Greater London and are more than happy to help #telehandlertraining #Acton:
via Twitter twitter.com/telehandleruk
via Trying to find a Telehandler Training Course in Moblake we can help here t.co/2HWTGFsQbi. Covering all of Cheshire, we have helped thousands over the years #Telehandler #Moblake #Cheshire:
via Twitter twitter.com/telehandleruk
(972) 721-2000
HOLT CAT Irving, (972) 721-2000 - See how Caterpillar technology delivers tier 4 clean operation for its diesel engines. Cat's regeneration system is automatic, letting you focus on your work.
Irving TX CAT Caterpillar CT660 Truck, Irving CAT Caterpillar skid steer loaders slope boards, Irving CAT Caterpillar backhoe telehandlers, Irving CAT Caterpillar bulldozer, water tankers trucks, track loaders, graders, feller bunchers, CAT lube service maintenance, Caterpillar radiator service, Irving CAT machine powertrain engine rebuilds Irving TX
Caterpillar Machines, Cat Trucks, Equipment, Loaders, Diesel, Tractors, Excavators Caterpillar, Compact Track, Multi-Terrain Loaders, Compactors, Feller Bunchers, Forest Machines, Forwarders, Harvesters, Excavators, Loaders, Material Handlers, Motor Graders, Off-Highway Trucks, Paving Equipment, Pipelayers, Road Reclaimers, Skid Steer Loaders, Skidders, Slope Boards, Telehandlers, Track Loaders, Tractors, Underground Mining Equipment, Bulldozers, Water Tankers and Trucks, machine rental, heavy machine rental Irving, truck rental Irving,
Description
the skid steer loader with hydraulic hammer can carry the breatking work for cement pavement, asphalt and large concrete blocks
We are professional SKid Steer Loader,Track Loader,Wheel Loader,Backhoe Loader,Telehandler manufacturers and factory.We can produce SKid Steer Loader,Track Loader,Wheel Loader,Backhoe Loader,Telehandler according to your requirements.More types of SKid Steer Loader,Track Loader,Wheel Loader,Backhoe Loader,Telehandler wanted,please contact us right now!
'14' metre JCB used by Andritz during installation of the filter press at Ballinrees water treatment plant
CEA Myanmar delivered a Manitou MT860 Tele-handler to the global construction company LaFarge, to be used at their recently acquired ready-mix batching plant. The batching plant supplies concrete for the new condo development and construction in Star City.
Kevin Fisher Managing Director of CEA Project Logistics handed over the keys to Philip Hughes, Plant Manager for LaFarge at the Star City construction site.
“This is the first batching plant for Myanmar, and with state of the art equipment like our new Manitou Tele-handler we can ensure client satisfaction”
The robust machine has a 6- ton capacity and 8 metre reach enabling the unit to load sand, aggregate and other materials used in concrete production. LaFarge opted for a 3 cubic meter bucket attachment and hydraulic brush attachment which will aid in keeping the plant clean.
Star City is a premier development located on the South Bank of the Thanyalin River and is a self-contained project complete with gym, restaurants, golf course and sports club. The location is just 12 kilometers away from the Thilawa Special Economic Zone development and 15 kilometers from downtown Yangon.
LaFarge is one of the world’s large concrete producers and has a strong foothold in Myanmar riding on international standards for concrete production. The ready-mix plant is a first for LaFarge in Myanmar which already has a bulk concrete plant supplying Yangon’s growing infrastructure.
CEA Myanmar delivered a Manitou MT860 Tele-handler to the global construction company LaFarge, to be used at their recently acquired ready-mix batching plant. The batching plant supplies concrete for the new condo development and construction in Star City.
Kevin Fisher Managing Director of CEA Project Logistics handed over the keys to Philip Hughes, Plant Manager for LaFarge at the Star City construction site.
“This is the first batching plant for Myanmar, and with state of the art equipment like our new Manitou Tele-handler we can ensure client satisfaction”
The robust machine has a 6- ton capacity and 8 metre reach enabling the unit to load sand, aggregate and other materials used in concrete production. LaFarge opted for a 3 cubic meter bucket attachment and hydraulic brush attachment which will aid in keeping the plant clean.
Star City is a premier development located on the South Bank of the Thanyalin River and is a self-contained project complete with gym, restaurants, golf course and sports club. The location is just 12 kilometers away from the Thilawa Special Economic Zone development and 15 kilometers from downtown Yangon.
LaFarge is one of the world’s large concrete producers and has a strong foothold in Myanmar riding on international standards for concrete production. The ready-mix plant is a first for LaFarge in Myanmar which already has a bulk concrete plant supplying Yangon’s growing infrastructure.