View allAll Photos Tagged Telehandler

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

CEA Myanmar delivered a Manitou MT860 Tele-handler to the global construction company LaFarge, to be used at their recently acquired ready-mix batching plant. The batching plant supplies concrete for the new condo development and construction in Star City.

 

Kevin Fisher Managing Director of CEA Project Logistics handed over the keys to Philip Hughes, Plant Manager for LaFarge at the Star City construction site.

 

“This is the first batching plant for Myanmar, and with state of the art equipment like our new Manitou Tele-handler we can ensure client satisfaction”

 

The robust machine has a 6- ton capacity and 8 metre reach enabling the unit to load sand, aggregate and other materials used in concrete production. LaFarge opted for a 3 cubic meter bucket attachment and hydraulic brush attachment which will aid in keeping the plant clean.

 

Star City is a premier development located on the South Bank of the Thanyalin River and is a self-contained project complete with gym, restaurants, golf course and sports club. The location is just 12 kilometers away from the Thilawa Special Economic Zone development and 15 kilometers from downtown Yangon.

 

LaFarge is one of the world’s large concrete producers and has a strong foothold in Myanmar riding on international standards for concrete production. The ready-mix plant is a first for LaFarge in Myanmar which already has a bulk concrete plant supplying Yangon’s growing infrastructure.

FORK RENT JCB 535-140

TELEHANDLER

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

...on a JLG Telehandler.

 

Crane above, the sea to the right, with cranes and containers on the opposite side of estuary.

 

Its nice and sunny today.

Description

Model: MMT80-W

Specs:

1.) Hydraulic controling, hydr. flow is 12.6GPM

2.) Tipping capacity: 794kgs

3.) Weight (with out bucket): 856kgs / 1887lbs

4.) Engine: Kohler, command pro. Gasoline engine original Honda engine, gasoline type (but the Honda engine delivery time is 3 months, we advise KOHLER engine..)

5.) Dimensions (with bucket): 2235mm(L)*1080mm(W)*1245mm(H) (its not under operating situations).

Many kinds of attachments optional

We are professional SKid Steer Loader,Track Loader,Wheel Loader,Backhoe Loader,Telehandler manufacturers and factory.We can produce SKid Steer Loader,Track Loader,Wheel Loader,Backhoe Loader,Telehandler according to your requirements.More types of SKid Steer Loader,Track Loader,Wheel Loader,Backhoe Loader,Telehandler wanted,please contact us right now!

 

www.wolverineloader.com

(972) 721-2000

 

HOLT CAT Irving

 

HOLT CAT is the authorized Caterpillar heavy equipment and engine dealer for 118 counties in South, Central, North and East Texas - including Irving. Established in 1933, HOLT sells, services and rents Cat equipment, engines and generators for construction, mining, industrial, petroleum and agricultural applications. HOLT sells Caterpillar used equipment worldwide and fabricates its own line of custom engineered products including root plows and water tankers.

 

Caterpillar Machines, Cat Trucks, Equipment, Loaders, Diesel, Tractors, Excavators Caterpillar, Compact Track, Multi-Terrain Loaders, Compactors, Feller Bunchers, Forest Machines, Forwarders, Harvesters, Excavators, Loaders, Material Handlers, Motor Graders, Off-Highway Trucks, Paving Equipment, Pipelayers, Road Reclaimers, Skid Steer Loaders, Skidders, Slope Boards, Telehandlers, Track Loaders, Tractors, Underground Mining Equipment, Bulldozers, Water Tankers and Trucks, machine rental, heavy machine rental Irving, truck rental Irving, generator rental,

 

Irving CAT Caterpillar rental, Irving CAT Caterpillar service repair parts, Irving TX CAT Caterpillar equipment machinery diesel, Irving CAT Caterpillar construction equipment, Irving CAT Caterpillar generators, Irving CAT Caterpillar earth moving mining industrial petroleum agricultural machinery parts, Irving TX Cat Caterpillar truck combine ag equipment dealer, Irving CAT Caterpillar handlers loaders excavators Irving,

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

LEGO 42061 Telehandler

Technic 2017

Rails being moved by Telehandler, not an easy manoeuvre. Later the job was made much easier with the arrival of Stevie in his JCB.

 

Summer 2015.

BTS Train Model Project

CEA were employed to receive, transport and unload three 40ft HC containers form Japan. Each container contained parts of a full scale wooden model of a Bangkok Mass Transit System (BTS) car. The model was to be put on display at the BTS Headquarters in Bangkok.

CEA received the containers at Laem Chabang port and facilitated all the necessary customs paperwork. The containers were loaded on to flatbed trailers and transported to the BTS site in Bangkok.

A 55 t mobile crane, a 3.5 t Forklift, a 5 t Telehandler and Hiab truck also made the journey to Bangkok as these would be used for unloading and unstuffing the containers.

Upon arrival in Bangkok CEA began the unloading and unstuffing procedure. The parts were moved to a purpose built display area for erection.

CEA assisted in the erection of the model alongside a specialised design team from Japan. After the model was complete CEA demobilized all the equipment and returned to Laem Chabang.

Equipment Used

55 t Mobile crane

5 t Telehandler

3.5 t Forklift

Hiab Truck

Isuzu DECA 360 Prime movers

Flatbed trailers

 

1 2 ••• 21 22 24 26 27 ••• 79 80