View allAll Photos Tagged System
All images in this album are renderings.
Select renderings show customs items which would need to be individually quoted by project.
Finish Disclaimer:
No details on finishes can be provided. Finishes on computer screens can appear different than in person. Dealers should order samples through the Dealer Resource Center (DRC) to determine what works best for their needs.
System sterowania zgrzewarką. Serwonapęd SEW. Przyciski sterowania ręcznego.
Control system for multispot resistance welder. SEW servo. Buttons for manual operating.
This is an image of the VIA AMOS-5110 system based on the VIA AMOS-5000 device development kit, shown here from the front I/O view.
This was taken underneath an overhead bridge/road near my home. It looked like someone could have been living here, there were pieces of furniture like bed mattresses and old seats arranged at the other end of the tunnel (although it is most likely a gang meeting place for youths to get drunk).
I enjoyed this one as I had to adjust the exposure and I had to try to steady myself because of the strong winds outside as I have no tripod.
TThat's right -- it's an iPod and a CD player. Makes it easy for someone to spin their own disc or mixtape.
IAEA Director-General Rafael Mariano Grossi, together with HE Mr. KOO Hyuk Chae, Vice Minister, Ministry of Science and ICT, Republic of Korea and Ms. Teresa Robins, Acting Administrator for the National Nuclear Security Administration (NNSA) at the inauguration of the IAEA Transportable Electron Beam System ceremony, a Side Event at the 69th IAEA General Conference held at the Agency headquarters in Vienna, Austria. 16 September 2025
Photo Credit: Dean Calma / IAEA
Copyright ©IAEA Images
Welcome Remarks:
Najat Mokhtar, IAEA Deputy Director-General and Head of the Department of Nuclear Sciences and Applications
Opening Remarks:
IAEA Director-General Rafael Mariano Grossi
HE Mr. KOO Hyuk Chae, Vice Minister, Ministry of Science and ICT, Republic of Korea
Ms. Teresa Robins, Acting Administrator for the National Nuclear Security Administration (NNSA)
IAEA:
Tzanka Wheldon-Kokalova, DIR-NAPC
Celina Horak, SH-RCRTS
Seungho Yu, Electron Beam Processing Officer
Azillah Binti Othman, Radiation Processing Officer
Ayhan Evrensel, IAEA Consultant
Historic Chickamauga Dam on the Tennessee River in Hamilton County, Tennessee. The hydroelectric dam was constructed by the Tennessee Valley Authority (TVA) from 1936-40. The U.S. Corps of Engineers constructed a 360’ long lock for river navigation. The dam was designed to allow construction of a future bridge above the dam. The Wilkes T. Thrasher Bridge was built 1953-55 and widened from two lanes to four lanes in the 1980s.
The TVA was created by Congress in 1933 as a New Deal agency to provide navigation, flood control, electricity generation and economic development to the depressed Tennessee Valley.
The Chickamauga Dam was listed on the National Register of Historic Places (NRHP) in 2017 (NRIS Reference No. 100001466 as the Chickamauga Hydroelectric Project). The dam, powerhouse, lock and bridge are contributing items to the listing and the listing is part of the TVA Hydroelectric System, 1933-1979 Multiple Property Submission (MPS).
Reference: APAAME_20081009_RHB-0057
Photographer: Robert Howard Bewley
Credit: Aerial Photographic Archive for Archaeology in the Middle East
Copyright: Creative Commons Attribution-Noncommercial-No Derivative Works
Three different systems of washing lines hang in this space, the variation transforming the space even further. The top left shows washing hung within the interior of the building. The top right shows a singular pair of pants on a coat hanger hanging off a window grid. Lower left shows a clothes line created from a green chain and coat hangers attaching singular items of clothing.