View allAll Photos Tagged Structures

Nice rocks on the seaside

London Wander 27th January 2017 - XF 35mm f1.4

Structures opening The Recorrupt Tour in Grand Rapids, MI

Early morning walk from the Old Bus Park at Ratna Park to Jamal, Bhotahiti, Asan Tole, Teuda Road, Naradevi Road, Bangemudha Road, Sukrapath, Indra Chowk, Wotu Galli, New Road and finally Durbar Square.

Montréal, Silo N˚ 5

griffintown_FX2440

N Scale Railway Model Structure. A work in progress in the dark.

Structure Protection at Spotted Bear Ranger Station 8/8/2023. Water tanks called 'pumpkins' are used to hold water. With Mark 3 water pumps and hose lays. The building is one of the houses for the district personnel.

Part of an image I shot while I was in Vancouver and then later I tweaked it.

Mayank Bawa on stage at Structure Big Data 2011 in New York City.

 

Photograph copyright Pınar Özger.

 

All rights reserved. Please contact via email to inquire about licensing for other usages.

beautiful flame structures in the Mt Messenger Fmn extending from this muddy bed into the sand bed, they are pointing to the NW

30s exposure of the support structure for a draw bridge. I used a 10x neutral density filter to increase the exposure time.

Further to the west on the spit are the buildings of the second phase. The most distinctive structures built during this phase were the two Vibration Test Buildings, now commonly referred to as ‘The Pagodas’ (National Trust buildings E2 and E3). The specification for the Vibration Test Buildings included the ability to withstand the accidental detonation of 400lbs (181.4kg) of high explosives; they were designed by G W Dixon ARIBA for the UK Atomic Energy Authority and are identical. Both Vibration Test Buildings, their control room and centrifuge were constructed in 1960.

 

They comprise a large reinforced concrete central cell 16.47m (54ft) by 7.30m (24ft) covered by a massive reinforced concrete roof supported on sixteen reinforced concrete columns. To the south and east of the main chambers are self-contained plant rooms. The main access to the building is from the south through an entrance passage which was originally sealed by a pair of outward opening metal covered wooden doors. On its western side, adjacent to the main entrance passage is a blocked doorway that led to a small staff room and toilet. Inside the buildings on the eastern side of the passageway one set of stairs gives access down to the main test cell and another to a walkway around the top of the chamber. At the end of the passageway is a lift pit, which allowed test pieces to be lowered on to the floor of the main test cell. To assist in manoeuvring heavy objects there are a number of substantial steel eyelets screwed into the underside of the roof. A travelling crane also ran on rails mounted on a ledge beneath the windows, a loose plate on the floor recorded ‘Becker twin Lift Maximum Working Load 40 tons serial A-2647-2’.

 

The floor of the main cell is formed of parallel and narrowly spaced steel ‘I’ section beams for test rigs to be firmly secured to the structure. To either side are cable ducts. At the same time as being vibrated objects might also be placed in jackets to simulate extremes of heat and cold, or in a portable altitude chamber to mimic the effects of altitudinal changes. Set into the north wall are seven steel plates with vertical cruciform slots that were also used for securing tests rigs or monitoring equipment. Below these are eight pipes opening from the service passageway to the north. In the south wall are three steel plates with horizontal slots, above the plate is stencilled 1-27ft and below it 1-7.5m. The walkway around three sides of the cell was originally protected by a handrail and there is another handrail fixed to the main wall. Running around the wall is a cable conduit and attached to the wall are various pipes for carrying electrical wires, switches, junction boxes and pressure gauges. Signs on the wall above the lift pit record ‘Telephone Instrument Room’, ‘Vac Pump Running, Vac Pump Stopped’ with associated light fittings. At the north east corner of the cell is a doorway to the rear service passage running east to west along the north side of the building. To the east a flight of stairs gives access to the eastern plant room. To the west another set of stairs provides access to the northern side of the lift pit, the upper walkway and to an emergency escape passage through the north side of the traverse. To the south of the main cell are free-standing Burwell brick-built plant rooms. The main plant room is entered through two sets of double doors on its south side, internally are four machinery mounting plinths. Attached to its west wall is a metal cabinet that probably housed equipment to operate the hydraulic compressor for the internal lift. At the eastern end of the building is a store room with a blocked doorway to the south.

 

GigaOM Structure Data event at Pier 60, Chelsea Piers in New York, NY on Wednesday March 19, 2014. (© Photo by Jakub Mosur).

Structure in nature

Structure takes a different and more intricate look at one of the worlds most famous buildings, the Eiffel Tower. We spend so long in awe at the building, its views and what it stands for that we don't always take in the leviathan nature of it's construction. Structure studies the lines, joints and crossings of this great building in black and white, high contrast images.

laguna- houses, stores, and structures

Structures on The Crush em All Tour playing in Grand Rapids, MI

1 2 ••• 57 58 60 62 63 ••• 79 80