View allAll Photos Tagged SteelStructures
Work on the architectural facing brick, that the building will be faced with ,this is the inner yard area
Richard J. Daley Center
Architect: C.F. Murphy Associates
Date: 1965
Style: International
Address: 50 West Washington Street
Height: 648 ft. (32 Floors)
Exterior: Exposed Corten Steel
Structural
Material: Steel
Program: Court House and Government Office
The structural columns of the Richard J. Daley Center are 87 feet apart, which is a relatively large span. Towards the top of the columns, the width diminishes as the floors require less support.
For four years, from 1965 to 1969, the Daley Center was the tallest building in Chicago. In 2001, it received historical status, only 36 years after its completion. The building has a small height to floor ratio, due to the large floor to floor distance of 18 feet.
the American span of the Thousand Island Bridge, which connects the American mainland with Wellesley Island in the St Lawrence River
Former rail bridge now used for pedestrian use in Grand Rapids Michigan. This bridges cross the Grand River.
There is something about the old steel water towers that has drawn my attention. I'm not exactly sure what it is.
Richard J. Daley Center
Architect: C.F. Murphy Associates
Date: 1965
Style: International
Address: 50 West Washington Street
Height: 648 ft. (32 Floors)
Exterior: Exposed Corten Steel
Structural
Material: Steel
Program: Court House and Government Office
The structural columns of the Richard J. Daley Center are 87 feet apart, which is a relatively large span. Towards the top of the columns, the width diminishes as the floors require less support.
For four years, from 1965 to 1969, the Daley Center was the tallest building in Chicago. In 2001, it received historical status, only 36 years after its completion. The building has a small height to floor ratio, due to the large floor to floor distance of 18 feet.
Maldon Essex based Eastern Crane Hire Tadono crane working on an extension to the Kingfisher leisure centre at Sudbury
One of the stillage’s used to transport the glazed panels being lifted to the far side of the building
Special pics for the special website Suppaduppa! suppaduppa.mtv.uol.com.br/eles/2010/07/27/entrevista-ciro...
A dense lattice of steel transmission towers fills the frame in stark black and white, their crisscrossing girders and insulator strings forming an intricate geometric web against a flat, overcast sky. Thick bundles of power lines sag between the towers, strung with ceramic insulators that catch what little light filters through the clouds. A tall, narrow pole rises through the center of the composition, cutting a clean vertical line through the tangle of horizontal and diagonal beams surrounding it. Below the main structures, smaller transformers and switching equipment cluster together, their boxy silhouettes partially obscured by the maze of supporting scaffolding. A low building bearing a partially visible utility company sign sits at the base of the substation, grounding the towering ironwork in its industrial function. Stripped of color, the image emphasizes pure form and structure, transforming the utilitarian machinery of the power grid into an almost abstract study of line, shadow, and repetition.
Working on steelwork can be dangerous so the use of safety equipment like this fall restraint harness is essential
Internal structure of Duke & Baron is made of mild steel coated in paint to last 30 years. Outer plates high quality stainless steel.
Goulding summer House - modernist cantilevered structure
Architect - scott tallon walker
Client - Sir Basil Goulding
II abbozzo