View allAll Photos Tagged Pathway
A shot from my first photographic visit to the Angel of the North.
The Angel is a contemporary sculpture, designed by Antony Gormley, located in Gateshead, Tyne and Wear, England.
It is a steel sculpture 20 metres (66 ft) tall, with wings measuring 54 metres (177 ft) across. The wings do not stand straight sideways, but are angled 3.5 degrees forward to create a sense of embrace.
According to Gormley, the significance of an angel was three-fold: first, to signify that beneath the site of its construction, coal miners worked for two centuries; second, to grasp the transition from an industrial to information age, and third, to serve as a focus for our evolving hopes and fears.
The sculpture was built at Hartlepool Steel Fabrications Ltd using Corten weather resistant steel and was finished in February 1998 at a cost of £1million.
The wooded pathways beside the Gloriette.
Fischer von Erlach's designs had included a belvedere for Schönbrunn Hill intended as the crowning touch to the palatial Baroque ensemble, but it was not until Johann Ferdinand Hetzendorf von Hohenberg remodelled the park that this project was finally realised. The Early Classicistic colonnaded Gloriette was built to Hohenberg's designs on the crest of the hill in 1775.
The structure consists of a central section in the form of a triumphal arch, flanked by arcaded wings with lofty semi-circular arches. The central section, which was glazed during the last year of Maria Theresa's life, is crowned with a mighty imperial eagle perching on a globe and surrounded by trophies. The flat roof with its retaining balustrade was already being used as a viewing platform by the beginning of the 19th century. It can be accessed today via a stairway.
Pathways Spiritual Sanctuary, one of my favorite places in the Hills, tranquil & every-changing, it's a welcome oasis for my body & soul whenever I visit.
Irene Heinert - Sturgis
Pathways Spiritual Sanctuary, one of my favorite places in the Hills, tranquil & every-changing, it's a welcome oasis for my body & soul whenever I visit.
Irene Heinert - Rapid City
This path caught my eye while in glacier national park. I fell in love with the way the natural surroundings meshed with the man made structure.
Ronald C. Petersen, Ph.D., M.D., Director, Mayo Alzheimer’s Disease Research Center, Mayo Clinic College of Medicine participates in a panel discussion about Evolving Science & Policy Reforms during a policy briefing entitled "Pathways to Prevention: A Policy Discussion on Research & Treatments for Alzheimer’s" sponsored by Eli Lilly & Company and The Hill at the Newseum on Thursday, June 23, 2016
after our journey from hell we went for a walk once we were checked in at le sous bois. we found this pathway, and were in awe at how nice it looked at the time - sleep deprivation can do odd things :)
Similar to the other exterior I posted, this was taken after twilight. 7 shot bracketed photo enfused in Photomatix with color and saturation adjustments done in LR5. The subject in this photo is the landscape work
A small MOC I made of a pathway along and a bridge over a canal. There is part of a boat in the canal and a tree on the path.
With this MOC I wanted to try the cobblestone pathway technique which is a mixture of rounded light bluish grey tiles. The tree was another thing that I wanted to try and is made by wrapping a bunch of branch pieces around the broken sprue of a 3-leaves piece. The branches are attached to a bar piece. There are also some smaller plant pieces loosely placed in the branches. The bridge also posed an unexpected with the thin margins for support.
More photos can be found on my Instagram.
I work at a Junior High school and on the last day of school before the Holiday vacation we had a gingerbread house contest.
The whole cafeteria smelled so sweet it gave you a tummy ache just being in there.
Pathway Suezmax crude oil tanker inbound for Tranmere Oil Terminal north berth assisted by Svitzer Stanlow VST, Svitzer Trident ASD and Millgarth ASD
Name: Pathway
Flag: Liberia
IMO: 1033705
MMSI: 636024575
Call sign: 5LTG5
AIS transponder class: Class A
Detailed vessel type: Suezmax Crude Oil Tanker
Gross Tonnage: 84677t
Deadweight: 156152t
Design Draught: 17.15m
Length Overall x Breadth Extreme: 274.3m x 48m
Year Built: 2025
Registered owner: BLINT SHIPPING SINGAPORE PTE
Ship manager/Commercial manager: EASTERN PACIFIC SHIPPING PTE
ISM: EASTERN PACIFIC SHIPPING PTE
Shipyard: NEW TIMES SHIPBUILDING CO., LTD., Jingjiang, China
Hull number: 0315811
Contract Date: 13th Jun 2023
Steel Cutting: 02nd Sep 2024
Keel laid: 24th Feb 2025
Launch: 14th May 2025
Date of build: 21st Jul 2025
Engine: x1 CSSC-MES DIESEL MAN B&W 6G70ME-C10.5-GI-HPSCR 2 stroke 6 cyls @ 68.1rpm dual-fuelled
Engine Power kW: 15100kW
x1 DALIAN MARINE Fixed Pitch Propeller @ 68.1rpm
Speed: 15knots